{"as_of":"2026-11-24","scope":"Eight priority case groups; not a complete county project universe","countywide_units_total":null,"case_groups":[{"case_id":"lake-society","project_ids":["southwyck-madison"],"dri_ids":["3987"],"title":"Southwyck / The Lake Society","join_rule":"Approved 502-lot 2024 preliminary plat; 559-dwelling 2026 agenda and reported outcomes remain separate.","missing_records":["Approved August 11 and November 10, 2026 BOC minutes and signed amended plat for 559 dwellings","Current controlling plat and phase map; certificates of occupancy by phase"],"events":[{"event_id":"lake-society-regional-review-2023","date":"2023-06","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Regional review of The Lake Society at Lake Oconee, sponsored by Southwyck Homes LLC; initial proposal was 700 housing units on about 315 acres, prior to county 2023 conditional rezoning.","source_url":"https://negrc.org/uploads/sites/4/2023/06/DRI3987.FinalReport.pdf","source_locator":"DRI #3987 p.1,4","caveat":"700 was a proposal, NOT the number approved in September 2023; projected May 2027 completion was not verified construction.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2023-southwyck","date":"2023-09-12","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve Southwyck Homes PUD rezoning on Madison Highway for three parcels totaling 314.36 acres, subject to listed restrictions.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","source_locator":"PDF p.1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"lake-society-preliminary-plat-2024","date":"2024-07-09","stage":"preliminary_plat_approved","evidence_level":"documentary_evidence_with_caveat","description":"Commissioners approved Atwell LLC preliminary plat for The Lake Society, 502 lots on 317.873 acres. Jeffery Smith moved, Angela Walker Deering seconded, unanimous collective result.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07092024-231","source_locator":"BOC July 9, 2024 minutes p.1","caveat":"Preliminary plat is a planning approval; no final plat, actual construction, property title or condition compliance is established here.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2024-07-09-lake-society-preliminary-plat","date":"2024-07-09","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve preliminary plat submitted by Atwell, LLC for The Lake Society, creating 502 lots from 317.873 acres along Madison Highway.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07092024-231","source_locator":"PDF page 1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"lake-society-2026-aug-amendment-agenda","date":"2026-08-11","stage":"amended_plat_agenda","evidence_level":"documentary_evidence_with_caveat","description":"Official agenda listed a request by Atwell LLC to amend The Lake Society preliminary plat to 559 dwellings on 317.873 acres.","source_url":"https://greenecoga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=6731,plainText=false)","source_locator":"BOC August 11, 2026 agenda p.1","caveat":"Agenda is not a decision; no approval or denial is inferred from this source.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-society-2026-aug-reported-denial","date":"2026-08-11","stage":"reported_amended_plat_denial","evidence_level":"reported","description":"A third-party compilation of official meeting records reports the board DENIED the amended 559-dwelling preliminary plat 4-1.","source_url":"https://mytown.theboringparts.com/city/greenecoga/","source_locator":"August 11, 2026 BOCC listing, minute excerpts","caveat":"Original official meeting minutes stream requires access; cannot attribute the votes to individuals or certify the copied summary until primary minutes are retrieved.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-society-2026-nov-amendment-agenda-lead","date":"2026-11-10","stage":"reported_amended_plat_agenda","evidence_level":"reported","description":"November 2026 listing again describes an amendment for 559 dwellings / 317.873 acres, apparently returning to BOCC.","source_url":"https://mytown.theboringparts.com/city/greenecoga/","source_locator":"November 10, 2026 BOCC listing and referenced official fileId 7806","caveat":"Only agenda copy accessible; no original November 2026 decision minutes or record of a successful approval was verified.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-society-2026-nov-reported-approval","date":"2026-11-10","stage":"reported_amended_plat_approval","evidence_level":"reported","description":"A real-estate community guide reports Nov 10 2026 BOCC approved the amended 559-home preliminary plat, following Aug 11 2026 reported denial.","source_url":"https://margeatlarge.com/lake-oconee-neighborhoods/lake-society/","source_locator":"Lake Society development guide (published November 2026), project timeline","caveat":"County November 10 2026 agenda is located but the ORIGINAL final minutes/recorded vote were not obtained; independent claim is plausible but NOT verified county action, construction or final approval.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false}],"conditions":[{"id":"southwyck-condition-1","project_id":"southwyck-madison","motion_id":"m-2023-southwyck","condition_text":"Density not above 1.78 units per acre","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","compliance_status":"unknown"},{"id":"southwyck-condition-2","project_id":"southwyck-madison","motion_id":"m-2023-southwyck","condition_text":"Open space at least 35%","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","compliance_status":"unknown"},{"id":"southwyck-condition-3","project_id":"southwyck-madison","motion_id":"m-2023-southwyck","condition_text":"Short-term rentals prohibited","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","compliance_status":"unknown"},{"id":"southwyck-condition-4","project_id":"southwyck-madison","motion_id":"m-2023-southwyck","condition_text":"Minimum lot size 7,000 square feet","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","compliance_status":"unknown"},{"id":"southwyck-condition-5","project_id":"southwyck-madison","motion_id":"m-2023-southwyck","condition_text":"Age-restricted community","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176","compliance_status":"unknown"}],"known_pipeline_observations":[{"project":"Southwyck / Lake Society","phase":"2024 preliminary plan","date":"2024","units":502,"unit_type":"lots","approval":"preliminary plat referenced in source-backed audit","status":"LATEST_2026_REVISION_OUTCOME_UNKNOWN","add_to_total":false,"overlap_status":"2026_559_dwelling_amendment_request_not_final","source":"https://greenecountycurrent.org/findings/projects/","notes":"2026 amended 559-dwelling request must not be added to prior 502 lots; verify original approved minutes, phase map and current status"}],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["lake-society-1","lake-society-2"],"completeness":{"dated_evidence_events":8,"conditions_on_file":5,"conditions_with_unknown_compliance":5,"primary_original_2026_lake_society_outcome_verified":false,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"kolter-cove","project_ids":["cove-at-harbor-club"],"dri_ids":["3843"],"title":"Kolter rezoning / Cove at Harbor Club regional review","join_rule":"Related applicant and parcel evidence; 592-acre DRI is not assumed identical to the 515-acre conditional rezoning.","missing_records":["Signed final rezoning resolution and legal exhibits mapping 515 acres to DRI3843 boundary","County-approved intersection designs for Club Drive and Richland Connector, approved SR44-aligned home-development timeline, and any preliminary plat approval"],"events":[{"event_id":"reconciled-dri-3843","date":"2022-10-31","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"The Cove at Harbor Club: 1441 proposed housing_units. 592-acre regional proposal. DRI 3842 was withdrawn.","source_url":"https://negrc.org/uploads/sites/4/2022/10/3843.DRIFinalReport.pdf","source_locator":"DRI 3843, page 1","caveat":"Related applicant and parcel evidence; 592-acre DRI is not assumed identical to the 515-acre conditional rezoning. Regional review is advisory, not local approval, construction or payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2023-02-14-03","date":"2023-02-14","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve the rezoning request submitted by Kolter Group Acquisitions, LLC, amending the Zoning from A1 to PUD for the 515 acres identified as tax map and parcel number 074-0-00- 001-1, tax map and parcel number 074-0-00-006-0, and a portion of tax map and parcel number 074-0-00-001-A as shown in the application, conditioned upon the provision that no Preliminary Plat will be approved for the PUD development until the developer has received approved roadway designs from Greene County for the development’s intersections with Club Drive and Richland Connector, and an approved development timeline for new homes that is acceptable to Greene County that aligns with improvements to State Route 44 at the Club Drive and Richland Connector Intersections","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141","source_locator":"Original source minutes PDF motion 3","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."}],"conditions":[{"id":"kolter-2023-road-condition-1","project_id":"cove-at-harbor-club","motion_id":"m-2023-02-14-03","condition_text":"No preliminary plat approval until the developer receives county-approved roadway designs for development intersections with Club Drive and Richland Connector.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141","compliance_status":"unknown"},{"id":"kolter-2023-road-condition-2","project_id":"cove-at-harbor-club","motion_id":"m-2023-02-14-03","condition_text":"Developer must receive county approval of a new-home development timeline aligned with State Route 44 improvements at Club Drive and Richland Connector.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141","compliance_status":"unknown"}],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["kolter-cove-1","kolter-cove-2"],"completeness":{"dated_evidence_events":2,"conditions_on_file":2,"conditions_with_unknown_compliance":2,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"richland-crossing","project_ids":["richland-crossing"],"dri_ids":["4509"],"title":"Richland Crossing","join_rule":"DRI housing proposal and three parcel-specific rezonings; common parent parcels do not establish identical tract boundaries.","missing_records":["Signed zoning resolutions 2025.9.9(c), (d) and (e), legal exhibits and residential unit schedules","Piedmont service commitment, capacity reservation dates and facility assignment; latest controlling plan and occupancy inventory"],"events":[{"event_id":"reconciled-dri-4509","date":"2025-07-30","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Richland Crossing: 1408 proposed housing_units. 388 acres with 774,000 square feet proposed commercial.","source_url":"https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","source_locator":"DRI 4509, page 1","caveat":"DRI housing proposal and three parcel-specific rezonings; common parent parcels do not establish identical tract boundaries. Regional review is advisory, not local approval, construction or payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2025-09-09-02","date":"2025-09-09","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve Resolution 2025.9.9(c) for A1-to-RM rezoning of 95.31 acres on Wrightsville Church Road, parent parcel 054-0-00-024-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","source_locator":"PDF page 1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"m-2025-09-09-03","date":"2025-09-09","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve Resolution 2025.9.9(d) for A1-to-B2 rezoning of 96.20 acres on State Route 44, parent parcel 054-0-00-020-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","source_locator":"PDF page 1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"m-2025-09-09-04","date":"2025-09-09","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve Resolution 2025.9.9(e) for A1-to-RM rezoning of 162.10 acres on State Route 44, parent parcel 054-0-00-020-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."}],"conditions":[],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["richland-crossing-1","richland-crossing-2"],"completeness":{"dated_evidence_events":4,"conditions_on_file":0,"conditions_with_unknown_compliance":0,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"oconee-shores","project_ids":["oconee-shores"],"dri_ids":["4252"],"title":"Oconee Shores","join_rule":"Conditional 519.69-acre PUD rezoning documented January 14, 2025; DRI1,038 units remain proposal-stage.","missing_records":["Final state approvals for community water and wastewater systems for 531 Greene LLC property","Approved controlling plan, buffer/setback exhibit, permit register and occupancy inventory"],"events":[{"event_id":"reconciled-dri-4252","date":"2024-09-06","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Oconee Shores: 1038 proposed housing_units. 520 acres with 18 acres proposed commercial.","source_url":"https://negrc.org/uploads/sites/4/2024/09/DRI4252.FinalReport.pdf","source_locator":"DRI 4252, page 1","caveat":"Conditional 519.69-acre PUD rezoning documented January 14, 2025; DRI1,038 units remain proposal-stage. Regional review is advisory, not local approval, construction or payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2025-01-14-02","date":"2025-01-14","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve the rezoning request submitted by 531 Greene, LLC amending the Zoning from A1 and LR1 to PUD for the 519.69 acres located on Madison Highway identified as tax map and parcel numbers 010- 0-00-006-0, 010-0-00-006-A, 010-0-00-006-B, and 010-0-00-006-C, contingent upon the development receiving final approval from the State of Georgia for a community water system and a community wastewater system, and with the condition that a 100-foot building setback line that includes a minimum 50-foot densely vegetated buffer be maintained along Madison Highway","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272","source_locator":"Original public BOC minute text, motion clause 2; page-image check pending","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."}],"conditions":[{"id":"oconee-shores-rezoning-1","project_id":"oconee-shores","motion_id":"m-2025-01-14-02","condition_text":"Obtain final state approval for community water and wastewater systems.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272","compliance_status":"unknown"},{"id":"oconee-shores-rezoning-2","project_id":"oconee-shores","motion_id":"m-2025-01-14-02","condition_text":"Maintain a 100-foot building setback including a minimum 50-foot densely vegetated buffer along Madison Highway.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272","compliance_status":"unknown"}],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["oconee-shores-1","oconee-shores-2"],"completeness":{"dated_evidence_events":2,"conditions_on_file":2,"conditions_with_unknown_compliance":2,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"lake-oconee-estates","project_ids":["lake-oconee-estates-beach-club-2024","lake-oconee-estates-beach"],"dri_ids":["4105","4399"],"title":"Lake Oconee Estates & Beach Club — phases kept separate","join_rule":"Phase I approvals and Phase II denial are separate; 328 proposed homes, 372 plat lots and later 365-home description are not interchangeable.","missing_records":["Signed July 26, 2024 preliminary plat legend specifying residential, amenity, common and utility lots; later revisions reconciling 372 lots and 365 homes","Building Official determination activating February 13, 2024 conditional zoning and written wastewater verification required by July plat","Phase II court docket, filed complaint and any subsequent judgment or settlement affecting April 8, 2025 denial"],"events":[{"event_id":"lake-estates-2023-regional-impact-4105","date":"2023-12-28","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Regional planning assessment of proposed 328 detached homes on 264 acres; original proposed October 2026/2028 phase completion dates.","source_url":"https://negrc.org/uploads/sites/4/2023/12/4105.DRIFinalReport.pdf","source_locator":"DRI #4105 p.1","caveat":"DRI report is advisory, dates are developer projections, not approvals or completed buildings.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-estates-jan2024-planning-recommendation","date":"2024-01-30","stage":"planning_zoning_recommendation","evidence_level":"documentary_evidence_with_caveat","description":"Planning and Zoning Commission recommended 264-acre A1/LR1-to-PUD rezoning for Lake Oconee Estates & Beach Club conditional on approved community water and sewer, Al Brinkman moved and Tommy Swann seconded.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01302024-191","source_locator":"P&Z January 30, 2024 minutes pp.1-2","caveat":"Advisory planning recommendation not a BOC approval; collective unanimous vote is not individualized.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-estates-feb2024-conditional-rezoning","date":"2024-02-13","stage":"conditional_rezoning_approved","evidence_level":"documentary_evidence_with_caveat","description":"BOC conditionally approved A1/LR1-to-PUD rezoning of 264 acres, parcel 091-0-00-011-B, effective only upon an approved community water and wastewater system confirmed by the county Building Official. Angela Walker Deering moved, Dee Lindsey seconded; carried unanimously.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","source_locator":"BOC February 13, 2024 minutes p.1","caveat":"The record documents conditional approval, not proof that utility plans were accepted, zoning became effective, lots were built or certificates issued.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2024-02-13-lake-estates-conditional-pud","date":"2024-02-13","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Conditionally approve the rezoning of 264 acres on Veazey Connector, parcel 091-0-00-011-B, from A1 and LR1 to PUD; effective when an approved community water and wastewater plan complying with county code is confirmed by the Building Official.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","source_locator":"PDF page 1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"m-2024-07-26-06","date":"2024-07-26","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve preliminary plat for 372 lots on 264.18 acres at Lake Oconee Estates and Beach Club, conditional on written verification of a qualifying wastewater connection or development.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"lake-estates-phase2-dri-4399","date":"2025-03-05","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Regional review of proposed Phase II of Lake Oconee Estates and Beach Club: 325 homes on roughly 196 acres, to extend earlier Phase I.","source_url":"https://negrc.org/uploads/sites/4/2025/03/DRI4399.FinalReport.pdf","source_locator":"DRI #4399 p.1","caveat":"Advisory review, not county approval. Existing Phase I and rejected Phase II must remain separate.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"lake-estates-april2025-staff-packet-acreage-conflict","date":"2025-04-08","stage":"source_conflict","evidence_level":"documentary_evidence_with_caveat","description":"April 2025 staff memo states previous February 2024 approval covered 1,047.52 acres. Original February 13 2024 approved county minutes expressly state 264 acres; 2023 DRI #4105 also says 264.","source_url":"https://greenecountyga.gov/DocumentCenter/View/2593/April-2025-Board-Packet-PDF?bidId=","source_locator":"April 2025 staff packet Request for Board Action, p.3","caveat":"Unreconciled discrepancy in retrospective staff packet. Do not replace original Feb 2024 264-acre action with uncorroborated 1,047.52-acre staff assertion.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2025-04-08-03","date":"2025-04-08","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Motion to approve Lake Oconee Estates & Beach Club LLC PUD rezoning of 191.28 acres with six stated conditions; motion received no second and did not proceed to vote.","outcome":"no_action","collective_vote":"not_recorded","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04082025-290","source_locator":"PDF page 1","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"m-2025-04-08-04","date":"2025-04-08","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Deny Lake Oconee Estates & Beach Club LLC request to rezone 191.28 acres on Leslie Mill Road/Veazey Connector from A1 to PUD; carried 4-1.","outcome":"passed","collective_vote":"named_roll_call","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04082025-290","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"lake-estates-litigation-reported-2025","date":"2025-05","stage":"reported_lawsuit","evidence_level":"documentary_evidence_with_caveat","description":"Local news reported a lawsuit filed after the April 8, 2025 rezoning denial.","source_url":"https://static1.squarespace.com/static/63b6f46d9b12ed484f0357b4/t/684c8755283698040139f745/1749845846263/Putnam%2BHFH%2Bannounces%2BCarter%2BCrossing%2BProject_Lake%2BOconee%2BNews.pdf","source_locator":"Lake Oconee News June 2025 clipping, continued report","caveat":"No original Greene Superior Court complaint/docket, judicial ruling, dismissal or settlement has been verified.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"veazey-corridor-moratorium-oct2025","date":"2025-10-14","stage":"corridor_policy_enacted","evidence_level":"documentary_evidence_with_caveat","description":"BOC approved Resolution 2025.10.14(d), temporarily restricting acceptance of rezoning applications within 1,500 feet of Veazey Connector centerline between Walker Church Road and Veazey Road.","source_url":"https://selectgreenega.com/AgendaCenter/ViewFile/Minutes/_10142025-324","source_locator":"BOC October 14, 2025 minutes p.2","caveat":"Area-level policy affecting a corridor, not a decision on this developer's 2025 rejected application nor evidence about actual construction.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"veazey-moratorium-extension-nov2025-unresolved","date":"2025-11-18","stage":"extension_decision_unknown","evidence_level":"documentary_evidence_with_caveat","description":"The November agenda included possible moratorium extension, but the adopted minutes do not separately record a vote on that proposed item.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11182025-328","source_locator":"BOC November 18, 2025 minutes pp.1-3","caveat":"DO NOT assert that the November 18 agenda item passed or that the moratorium was still operative in late 2026.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false}],"conditions":[{"id":"lake-oconee-2024-wastewater","project_id":"lake-oconee-estates-beach-club-2024","motion_id":"m-2024-07-26-06","condition_text":"Applicant must provide written verification of development or connection to qualifying wastewater collection infrastructure.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","compliance_status":"unknown"},{"id":"lake-estates-2024-zoning-effective-utility-plan","project_id":"lake-oconee-estates-beach-club-2024","motion_id":"m-2024-02-13-lake-estates-conditional-pud","condition_text":"Conditional PUD rezoning effective only after county Building Official confirms approved community water AND wastewater systems that comply with county code.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","compliance_status":"unknown"}],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["lake-oconee-estates-1","lake-oconee-estates-2","lake-oconee-estates-3"],"completeness":{"dated_evidence_events":12,"conditions_on_file":2,"conditions_with_unknown_compliance":2,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"club-drive","project_ids":["club-drive-2025"],"dri_ids":[],"title":"Club Drive","join_rule":"The May agenda and June decision identify different parcels; related roadway completion is not site-condition compliance.","missing_records":["Signed application, June 10, 2025 approval/resolution and legal exhibits resolving parcel 070-0-00-048-0 versus 054-0-00-024-0","Recorded 22.5-acre plat required within 60 days of June 10, 2025 approval; county acceptance of seven conditions"],"events":[{"event_id":"harbor-company-copelan-club-drive-appeal-2002","date":"2002-06-24","stage":"historical_access_court_case","evidence_level":"documentary_evidence_with_caveat","description":"Published 2002 appellate opinion affirmed judgment that Copelan retained a six-inch privately owned strip along Club Drive, which affected road access for Harbor Club Tracts 6 and 7; cites Sep 20 1990 Club Drive warranty deed to the county and separate Harbor Club tract conveyances.","source_url":"https://law.justia.com/cases/georgia/court-of-appeals/2002/a02a0102-0.html","source_locator":"Georgia Court of Appeals Harbor Co. v. Copelan 256 Ga.App.79, A02A0102, June 24 2002, opinion pp.1–2, paragraphs of 1990 conveyances and court holdings","caveat":"Historic conveyance and 2002 judicial findings are geographically relevant to Club Drive but NOT proof that the same strip or tracts are inside the 2025 22.5-acre rezoning, not a 2026 deed/title search, and not evidence of any local official's current interests. Do not infer misconduct or 2025 access restriction compliance.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"club-drive-parcel-2022-unrelated-willow-run-application","date":"2022-10-25","stage":"historical_parcel_application_contradiction","evidence_level":"documentary_evidence_with_caveat","description":"The EXACT parcel 070-0-00-048-0 on Willow Run Road appearing unexpectedly in the May 2025 Club Drive 22.5-acre agenda was already cited in the 2022 official P&Z agenda and minutes for a distinct Frey–Moss Structures Inc application (Jay Dell representative), 15.42 acres from A1 to Light Industrial. The 2025 BOC approved minutes instead used 054-0-00-024-0 on Club Drive.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_10252022-116","source_locator":"Planning & Zoning Commission October 25, 2022 adopted minutes, pp.1–2, Frey–Moss Structures 15.42-acre application","caveat":"A concrete evidence-backed alternate source for the 2025 May agenda’s out-of-place Willow Run parcel number. Likely template/copy-forward error is a hypothesis, not a certified official erratum. The 2022 15.42ac Frey–Moss parcel is unrelated to the 2025 Copelan 22.5ac approval unless signed legal exhibits establish otherwise; do not erase either source or assert title. Obtain certified zoning file, mapping, and legally filed approval plat.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"club-drive-2025-planning-agenda-parcel-mismatch","date":"2025-05-27","stage":"source_conflict","evidence_level":"documentary_evidence_with_caveat","description":"Official P&Z agenda names the 22.5-acre A1 to B1 application for Jesse and Kaye Copelan on Club Drive but says TMP 070-0-00-048-0 on Willow Run Road. Approved BOC June 10 minutes instead identify 054-0-00-024-0 on Club Drive.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/ArchivedAgenda/_05272025-250","source_locator":"Greene P&Z May 27 2025 official agenda p.1, item V.1","caveat":"These are conflicting official parcel/address identifiers for apparently the same named 22.5-acre rezoning. Neither agenda nor meeting-minutes parcel reference is a certified recorded legal survey. Obtain signed zoning application, final resolution, recorded tract plat and parcel split before any geospatial implementation claim.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2025-06-10-06","date":"2025-06-10","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve conditional A1-to-B1 rezoning for 22.50 acres at Club Drive, a portion of parcel 054-0-00-024-0, on request by Rick McAllister on behalf of Jesse and Kaye Copelan.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"club-drive-richland-crossing-4509","date":"2025-07-30","stage":"regional_review_complete","evidence_level":"documentary_evidence_with_caveat","description":"Richland Crossing regional review covers roughly 388 acres including parent parcels 0540000240 and 0540000200; 1,408 proposed housing units, 774,000 sq.ft. proposed commercial development. July 2025 report after the June Club Drive rezoning.","source_url":"https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","source_locator":"DRI #4509 pp.1,4","caveat":"The 22.5-acre Club Drive rezoning refers to a portion of the parent parcel. Overlap of a parent parcel does NOT prove that this precise rezoning tract is coextensive with the full DRI site or prove building start.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"club-drive-2025-sept-program-resolutions","date":"2025-09-09","stage":"related_parent_parcel_rezonings","evidence_level":"documentary_evidence_with_caveat","description":"County approved separate 95.31-acre RM rezoning on parent parcel 054-0-00-024-0 plus two rezonings on parent parcel 054-0-00-020-0.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","source_locator":"BOC September 9, 2025 minutes pp.1-2","caveat":"Related policy and parent-parcel actions, not documentation that the 22.5-acre Club Drive conditions were satisfied.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"wrightsville-road-extension-2025-audit-completed","date":"2025-09-30","stage":"area_public_road_reported_complete","evidence_level":"documentary_evidence_with_caveat","description":"County FY2025 audited management report confirms completion of the public Wrightsville Church Road Extension. The TSPLOST fund's aggregate capital outlay rose $1,744,608 in part with this project, but the audited narrative does not isolate the project's direct paid amount.","source_url":"https://www.greenecountyga.gov/ArchiveCenter/ViewFile/Item/604","source_locator":"Greene County FY2025 ACFR, MD&A printed page 19, TSPLOST paragraph","caveat":"Relevant to Club Drive roadway/traffic corridor only. Not evidence that Club Drive's private site road entrance, plat recording, buffer, setbacks or any one of seven approval conditions was satisfied; aggregate TSPLOST increase is NOT a contract or vendor paid amount for this project.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false}],"conditions":[{"id":"club-drive-2025-condition-1","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Record an approved plat for the 22.50-acre subject property within 60 days.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-2","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Limit parking-area lighting to maximum 3 footcandles and pedestrian hazard lighting to maximum 4 footcandles, with concealed light sources.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-3","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Use described primary facade materials; at least 80% brick/stone front and 50% brick/stone sides, with rear and decorative-material rules.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-4","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Screen rooftop mechanical equipment using sufficiently tall parapet walls or mansard roofs.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-5","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Provide minimum 50-foot Type D vegetative buffer at Club Drive and Wrightsville Church Road, excluding a wall or fence.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-6","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Provide minimum 100-foot setback for vertical structures along Club Drive and Wrightsville Church Road.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"},{"id":"club-drive-2025-condition-7","project_id":"club-drive-2025","motion_id":"m-2025-06-10-06","condition_text":"Provide both Wrightsville Church Road and Club Drive access, keeping the Club Drive entrance closed for up to 18 months.","text_kind":"source_summary","deadline":null,"evidence_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","compliance_status":"unknown"}],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["club-drive-1","club-drive-2"],"completeness":{"dated_evidence_events":7,"conditions_on_file":7,"conditions_with_unknown_compliance":7,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"wastewater-funding","project_ids":["wastewater-expansion-2024"],"dri_ids":[],"title":"Richland Connector / Walker Church wastewater funding","join_rule":"County→Authority→Piedmont grant legs describe the same up-to-$2 million chain; do not sum them as $4 million or treat them as payments.","missing_records":["County $2 million transfer ledger and check/ACH records; separate $5,000 administration fee and legal-fee disbursements","Authority grant draw approvals, recipient receipts, final cost certifications and contractor-payment evidence required by November 12, 2024 grant agreement","Engineering acceptance and operating authorization specifically for this wastewater collection-system scope"],"events":[{"event_id":"richland-sewer-2023-utility-capital-plan","date":"2023-11","stage":"utility_capital_plan","evidence_level":"documentary_evidence_with_caveat","description":"Separate 2023 Piedmont Water capital plan lists Harbor Club–Richland Connector–Walker Church SEWER connection at $2,098,331, in a DIFFERENT sewer row from the $4.115m water main.","source_url":"https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","source_locator":"2023 Piedmont Water capital improvement schedule PDF p.10, sewer section","caveat":"The 2023 utility plan predates the 2024 county/Development Authority wastewater IGA. The planned corridor and amounts MAY relate but are NOT established as that signed IGA's scope, county spending, invoice, capital completion or reimbursement.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"walker-church-wastewater-discussion-march2024","date":"2024-03-27","stage":"pre_authorization_discussion","evidence_level":"documentary_evidence_with_caveat","description":"County manager described preliminary discussions for public-private wastewater extension down Connectors and Walker Church Road, with future contract and possible cost recovery.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03272024-216","source_locator":"BOC March 27, 2024 minutes p.1","caveat":"Minutes expressly say NO ACTION WAS TAKEN on wastewater that day.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2024-07-26-05","date":"2024-07-26","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve intergovernmental agreement with Greene County Development Authority for wastewater collection expansion serving Richland Connector and Walker Church areas.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"m-gcda-2024-08-13-04","date":"2024-08-13","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-development-authority","description":"Approve the Intergovernmental Agreement for Wastewater Collection System Expansion Project (2024) (attached hereto and made a part of)","outcome":"passed","collective_vote":"named_roll_call","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_08132024-199","source_locator":"Original minutes PDF p. 2, Recorded MOTION and VOTE","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"wastewater-county-gcda-iga-2024-08-13","date":"2024-08-13","stage":"intergovernmental_agreement_executed","evidence_level":"documentary_evidence_with_caveat","description":"Executed County–Authority IGA dated August 13. Article IV specifies a $2 million County transfer to the Authority, a separate $5,000 administrative fee, and reasonable outside counsel fees. The preliminary project budget is $13.4 million.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_08132024-199","source_locator":"Original Authority packet PDF pp. 4, 8–9, 13","caveat":"The transfer clause is tied to the effective date of the corresponding participation agreement. Cash transfers, fee payments and treatment-system commissioning remain unverified.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-gcda-2024-11-12-06","date":"2024-11-12","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-development-authority","description":"Approve Piedmont wastewater collection system expansion economic development grant agreement documents","outcome":"passed","collective_vote":"not_recorded","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11122024-202","source_locator":"Original minutes PDF p. 2, Recorded MOTION and VOTE","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"wastewater-piedmont-grant-agreement-2024-11-12","date":"2024-11-12","stage":"economic_development_grant_agreement_executed","evidence_level":"documentary_evidence_with_caveat","description":"Executed Authority–Piedmont Water Resources, LLC Economic Development Grant Agreement dated November 12. The agreement provides for a project grant of up to $2 million and calls for final cost and contractor-payment evidence upon completion.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11122024-202","source_locator":"Original Authority packet Appendix A PDF pp. 6–8, 14, 19, 24","caveat":"This is the downstream grant leg of the same $2 million funding chain, with disbursements subject to the agreement terms. No grant advances or recipient contractor payments are verified.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"walker-church-richland-piedmont-2025","date":"2025-07-30","stage":"related_development_utility_context","evidence_level":"documentary_evidence_with_caveat","description":"Richland Crossing DRI states applicant expects Piedmont Water Company water AND sewer services, with estimated 0.67 MGD demand for each system.","source_url":"https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","source_locator":"DRI #4509 p.4","caveat":"An applicant's expectation of utility service is NOT evidence of signed capacity agreements, installed county wastewater infrastructure, invoices or paid amounts; do not confuse 2024 water-main press announcements with sewage collection completion.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"walker-church-sewer-reported-installed-2026","date":"2026-11-03","stage":"reported_pipe_installed","evidence_level":"reported","description":"Local real estate guide reports Piedmont Water installed sewer pipe along Walker Church Road in 2026 and Beaverdam/West Place neighborhoods seek to connect.","source_url":"https://margeatlarge.com/lake-oconee-neighborhoods/beaverdam-west-place/","source_locator":"Realtor community guide, Homes and the Sewer That Changes Everything, updated Nov 3 2026","caveat":"Not official county/utility engineering acceptance, operating permit, pipe length, full Richland Connector IGA completion, lot connections, contractor invoices, or county reimbursement.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false}],"conditions":[],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["wastewater-funding-1","wastewater-funding-2","wastewater-funding-3"],"completeness":{"dated_evidence_events":9,"conditions_on_file":0,"conditions_with_unknown_compliance":0,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}},{"case_id":"water-main","project_ids":["richland-water-main-2023"],"dri_ids":[],"title":"2023 water-main interconnection","join_rule":"Distinct from wastewater project; audited budget adjustment and reported contract completion do not establish itemized payments.","missing_records":["Executed March 2023 water-line extension contract, final invoice, itemized county payments and signed acceptance certificate"],"events":[{"event_id":"m-2021-09-24-richland-water-tentative","date":"2021-09-24","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Tentatively commit $1 million in American Rescue Plan funds for Richland Connector water-main extension to Walker Church water system, conditional on formal contract and scope.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09242021-62","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"richland-water-main-2021-prelim-arp","date":"2021-09-24","stage":"tentative_funding","evidence_level":"documentary_evidence_with_caveat","description":"BOC tentatively committed $1 million in federal ARP funding for Richland Connector water-main extension and Walker Church tie-in, contingent on later formal contract and scope. Angela Deering moved, Jeffery Smith seconded; unanimous collective result.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09242021-62","source_locator":"BOC Sept 24, 2021 minutes p.2","caveat":"Tentative commitment was conditioned on later contract; not actual appropriation, executed contract or cash payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2023-03-02-richland-water-cap","date":"2023-03-02","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Authorize negotiations for Richland Connector water-main interconnection serving Walker Church and Reynolds systems, county commitment capped at $1.5 million.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03022023-144","source_locator":"PDF page 2","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"richland-water-main-2023-cap","date":"2023-03-02","stage":"negotiations_authorized","evidence_level":"documentary_evidence_with_caveat","description":"BOC authorized negotiations for water main along Richland Connector linking Walker Church and Reynolds water systems, capped COUNTY COMMITMENT at $1.5 million. Angela Deering moved, Ernie Filice seconded; unanimous collective result.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03022023-144","source_locator":"BOC March 2, 2023 called minutes p.2","caveat":"2023 cap is not incremental to the 2021 tentative $1 million and NOT evidence of payment. It governs water main, not 2024 wastewater collection agreement.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"m-2023-04-11-richland-water-contract","date":"2023-04-11","stage":"local_motion","evidence_level":"reviewed_motion","body_id":"greene-boc","description":"Approve Resolution 2023.4.11(d) authorizing a contract for water-service extension along Richland Connector to serve Emergency Services Facility and connect water systems.","outcome":"passed","collective_vote":"unanimous_present","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04112023-149","source_locator":"PDF page 3","caveat":"Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters."},{"event_id":"richland-water-main-2023-contract-authorization","date":"2023-04-11","stage":"water_contract_authorized","evidence_level":"documentary_evidence_with_caveat","description":"BOC approved Resolution 2023.4.11(d) authorizing a contract for water service across Richland Connector to County Emergency Services Facility and interconnect systems. Angela Deering moved, Dee Lindsey seconded.","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04112023-149","source_locator":"BOC April 11, 2023 minutes p.3","caveat":"Authorization of water service contract, NOT evidence contract was signed, funded or installation certified.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"richland-water-2023-utility-capital-plan","date":"2023-11","stage":"utility_capital_plan","evidence_level":"documentary_evidence_with_caveat","description":"Piedmont Water's own 2023 capital plan lists Harbor Club–Richland Connector–Walker Church–Leach WATER-MAIN project at $4,115,000, including proposed 26,000 feet of 10-inch water main and a booster pumping station.","source_url":"https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","source_locator":"2023 Piedmont Water capital improvement schedule PDF p.10 and water system project pages p.12–13","caveat":"This is a utility PLANNED capital estimate, NOT county appropriation, signed vendor agreement, expenditure, verified delivered cost, or utility completion. $1.5m 2023 county negotiation cap is a DIFFERENT accounting scope.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"richland-water-main-2024-utility-announcement","date":"2024-05-21","stage":"company_water_main_announcement","evidence_level":"documentary_evidence_with_caveat","description":"Utility announcement says Richland Connector water-main capital investment was more than $4 million, supporting existing customers and future residential areas.","source_url":"https://middlegeorgiaceo.com/news/2024/05/piedmont-water-company-announces-richland-connector-water-main-project/","source_locator":"May 21, 2024 Piedmont Water Company announcement reprinted by Middle Georgia CEO","caveat":"Company-stated investment is not independently audited county disbursement and does not establish 2024 wastewater collection-system delivery or county payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"richland-water-2024-county-audit-general-fund-budget","date":"2024-09-30","stage":"audited_budget_adjustment","evidence_level":"documentary_evidence_with_caveat","description":"Greene County's FY2024 audited management discussion says the county used prior-year General Fund balance to cover $1,500,000 for the water-line extension project approved in March 2023.","source_url":"https://www.greenecountyga.gov/Archive/ViewFile/Item/589","source_locator":"Greene County FY2024 ACFR, MD&A printed page 20, General Fund Budgetary Highlights, paragraph a","caveat":"This documents an enacted $1.5 million FY2024 General Fund budget adjustment, NOT $1.5 million of verified itemized vendor cash disbursements; must not be added to 2023 negotiation cap as a second payment.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false},{"event_id":"richland-water-2025-county-audit-reports-contract-completed","date":"2025-09-30","stage":"county_acfr_reported_contract_completion","evidence_level":"documentary_evidence_with_caveat","description":"County's FY2025 audited financial report expressly attributes a decline in general government spending partly to the completion of a water-line extension contract in FY2024. FY2024 audited report separately identifies the March 2023 approved $1.5 million water-line extension budget item; these disclosures jointly corroborate downstream implementation.","source_url":"https://www.greenecountyga.gov/ArchiveCenter/ViewFile/Item/604","source_locator":"Greene County FY2025 ACFR, MD&A printed page 18, General Fund expenditures, first bullet","caveat":"This is the COUNTY'S statement of contract completion by FY2024, linked to March 2023 water extension by shared date/description. The FY2025 sentence does not repeat 'Richland Connector' or name the contractor. Do NOT treat this as a signed engineering acceptance, live service certification, $1.5m paid, final contractor invoice, or closeout of 2024 WASTEWATER IGA.","verified_implementation":false,"verified_final_outcome":false,"verified_payment":false}],"conditions":[],"known_pipeline_observations":[],"latest_approved_net_units":null,"completed_units":null,"verified_paid_amount":null,"totals_status":"not_calculable_from_current_controlling_evidence","missing_record_ids":["water-main-1"],"completeness":{"dated_evidence_events":10,"conditions_on_file":0,"conditions_with_unknown_compliance":0,"primary_original_2026_lake_society_outcome_verified":null,"controlling_plan_and_supersession_reconciled":false,"completed_inventory_verified":false}}],"findings":[{"id":"kolter-dri-count-conflict","case_id":"kolter-cove","finding":"DRI3843 itself distinguishes 1,441 proposed units from phase counts totaling 1,454. The later county rezoning approves 515 acres with road-design and timeline conditions but states no home count.","values":[1441,1454],"difference":13,"source_keys":["dri-3843","kolter-2023-02-14"],"inference_limit":"No approved total of 1,441, 1,454 or approximately 1,400 homes is established by the rezoning motion."},{"id":"estates-count-measures","case_id":"lake-oconee-estates","finding":"2023 regional report proposes 328 homes; July 2024 minutes approve 372 lots; March 2025 Phase II report describes Phase I as 365 homes. The seven-lot difference is unresolved, not seven proven extra houses.","values":[328,372,365],"source_keys":["dri-4105","plat-2024-07-26","dri-4399"],"inference_limit":"Do not invent which seven lots are nonresidential or attribute 365 to a later controlling approval without the signed plan."}],"gaps":[{"id":"lake-society-1","case_id":"lake-society","missing_document":"Approved August 11 and November 10, 2026 BOC minutes and signed amended plat for 559 dwellings","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://greenecoga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=6731,plainText=false)","https://margeatlarge.com/lake-oconee-neighborhoods/lake-society/","https://mytown.theboringparts.com/city/greenecoga/","https://negrc.org/uploads/sites/4/2023/06/DRI3987.FinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07092024-231","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"lake-society-2","case_id":"lake-society","missing_document":"Current controlling plat and phase map; certificates of occupancy by phase","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://greenecoga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=6731,plainText=false)","https://margeatlarge.com/lake-oconee-neighborhoods/lake-society/","https://mytown.theboringparts.com/city/greenecoga/","https://negrc.org/uploads/sites/4/2023/06/DRI3987.FinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07092024-231","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09122023-176"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"kolter-cove-1","case_id":"kolter-cove","missing_document":"Signed final rezoning resolution and legal exhibits mapping 515 acres to DRI3843 boundary","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2022/10/3843.DRIFinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"kolter-cove-2","case_id":"kolter-cove","missing_document":"County-approved intersection designs for Club Drive and Richland Connector, approved SR44-aligned home-development timeline, and any preliminary plat approval","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2022/10/3843.DRIFinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"richland-crossing-1","case_id":"richland-crossing","missing_document":"Signed zoning resolutions 2025.9.9(c), (d) and (e), legal exhibits and residential unit schedules","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"richland-crossing-2","case_id":"richland-crossing","missing_document":"Piedmont service commitment, capacity reservation dates and facility assignment; latest controlling plan and occupancy inventory","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320"],"next_online_action":"Search Georgia EPD public drinking-water and wastewater permit files by applicant, facility and parcel; distinguish draft permits from issued approvals and obtain the dated allocation/commitment exhibit.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"oconee-shores-1","case_id":"oconee-shores","missing_document":"Final state approvals for community water and wastewater systems for 531 Greene LLC property","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2024/09/DRI4252.FinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272"],"next_online_action":"Search Georgia EPD public drinking-water and wastewater permit files by applicant, facility and parcel; distinguish draft permits from issued approvals and obtain the dated allocation/commitment exhibit.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"oconee-shores-2","case_id":"oconee-shores","missing_document":"Approved controlling plan, buffer/setback exhibit, permit register and occupancy inventory","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://negrc.org/uploads/sites/4/2024/09/DRI4252.FinalReport.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"lake-oconee-estates-1","case_id":"lake-oconee-estates","missing_document":"Signed July 26, 2024 preliminary plat legend specifying residential, amenity, common and utility lots; later revisions reconciling 372 lots and 365 homes","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://greenecountyga.gov/DocumentCenter/View/2593/April-2025-Board-Packet-PDF?bidId=","https://negrc.org/uploads/sites/4/2023/12/4105.DRIFinalReport.pdf","https://negrc.org/uploads/sites/4/2025/03/DRI4399.FinalReport.pdf","https://selectgreenega.com/AgendaCenter/ViewFile/Minutes/_10142025-324","https://static1.squarespace.com/static/63b6f46d9b12ed484f0357b4/t/684c8755283698040139f745/1749845846263/Putnam%2BHFH%2Bannounces%2BCarter%2BCrossing%2BProject_Lake%2BOconee%2BNews.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01302024-191","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04082025-290","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11182025-328"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"lake-oconee-estates-2","case_id":"lake-oconee-estates","missing_document":"Building Official determination activating February 13, 2024 conditional zoning and written wastewater verification required by July plat","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://greenecountyga.gov/DocumentCenter/View/2593/April-2025-Board-Packet-PDF?bidId=","https://negrc.org/uploads/sites/4/2023/12/4105.DRIFinalReport.pdf","https://negrc.org/uploads/sites/4/2025/03/DRI4399.FinalReport.pdf","https://selectgreenega.com/AgendaCenter/ViewFile/Minutes/_10142025-324","https://static1.squarespace.com/static/63b6f46d9b12ed484f0357b4/t/684c8755283698040139f745/1749845846263/Putnam%2BHFH%2Bannounces%2BCarter%2BCrossing%2BProject_Lake%2BOconee%2BNews.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01302024-191","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04082025-290","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11182025-328"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"lake-oconee-estates-3","case_id":"lake-oconee-estates","missing_document":"Phase II court docket, filed complaint and any subsequent judgment or settlement affecting April 8, 2025 denial","custodian":"Greene County Superior Court Clerk","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://greenecountyga.gov/DocumentCenter/View/2593/April-2025-Board-Packet-PDF?bidId=","https://negrc.org/uploads/sites/4/2023/12/4105.DRIFinalReport.pdf","https://negrc.org/uploads/sites/4/2025/03/DRI4399.FinalReport.pdf","https://selectgreenega.com/AgendaCenter/ViewFile/Minutes/_10142025-324","https://static1.squarespace.com/static/63b6f46d9b12ed484f0357b4/t/684c8755283698040139f745/1749845846263/Putnam%2BHFH%2Bannounces%2BCarter%2BCrossing%2BProject_Lake%2BOconee%2BNews.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01302024-191","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02132024-206","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04082025-290","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11182025-328"],"next_online_action":"Search the Superior Court public docket and public e-filing indexes for the developer/county case; retrieve available pleadings without payment. Stop before any fee.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"club-drive-1","case_id":"club-drive","missing_document":"Signed application, June 10, 2025 approval/resolution and legal exhibits resolving parcel 070-0-00-048-0 versus 054-0-00-024-0","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://law.justia.com/cases/georgia/court-of-appeals/2002/a02a0102-0.html","https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/ArchivedAgenda/_05272025-250","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_10252022-116","https://www.greenecountyga.gov/ArchiveCenter/ViewFile/Item/604"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"club-drive-2","case_id":"club-drive","missing_document":"Recorded 22.5-acre plat required within 60 days of June 10, 2025 approval; county acceptance of seven conditions","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://law.justia.com/cases/georgia/court-of-appeals/2002/a02a0102-0.html","https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/ArchivedAgenda/_05272025-250","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_06102025-304","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09092025-320","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_10252022-116","https://www.greenecountyga.gov/ArchiveCenter/ViewFile/Item/604"],"next_online_action":"Check official meeting packets, current application/plat indexes and agency document portals; log each attempt. Use browser retrieval for the official CivicClerk access wall.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"wastewater-funding-1","case_id":"wastewater-funding","missing_document":"County $2 million transfer ledger and check/ACH records; separate $5,000 administration fee and legal-fee disbursements","custodian":"Greene County finance and Greene County Development Authority records custodians","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://margeatlarge.com/lake-oconee-neighborhoods/beaverdam-west-place/","https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03272024-216","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_08132024-199","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11122024-202"],"next_online_action":"Search county and Development Authority agenda packets, audited schedules and grant-agreement appendices for the specified ledger, draw, acceptance or payment record; check provider and EPD public permit records for implementation.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"wastewater-funding-2","case_id":"wastewater-funding","missing_document":"Authority grant draw approvals, recipient receipts, final cost certifications and contractor-payment evidence required by November 12, 2024 grant agreement","custodian":"Greene County finance and Greene County Development Authority records custodians","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://margeatlarge.com/lake-oconee-neighborhoods/beaverdam-west-place/","https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03272024-216","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_08132024-199","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11122024-202"],"next_online_action":"Search county and Development Authority agenda packets, audited schedules and grant-agreement appendices for the specified ledger, draw, acceptance or payment record; check provider and EPD public permit records for implementation.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"wastewater-funding-3","case_id":"wastewater-funding","missing_document":"Engineering acceptance and operating authorization specifically for this wastewater collection-system scope","custodian":"Greene County finance and Greene County Development Authority records custodians","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://margeatlarge.com/lake-oconee-neighborhoods/beaverdam-west-place/","https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03272024-216","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_08132024-199","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_11122024-202"],"next_online_action":"Search county and Development Authority agenda packets, audited schedules and grant-agreement appendices for the specified ledger, draw, acceptance or payment record; check provider and EPD public permit records for implementation.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false},{"id":"water-main-1","case_id":"water-main","missing_document":"Executed March 2023 water-line extension contract, final invoice, itemized county payments and signed acceptance certificate","custodian":"Greene County Clerk / Building & Zoning","reason":"Not linked to a controlling original record in the reconciled case evidence.","source_urls":["https://middlegeorgiaceo.com/news/2024/05/piedmont-water-company-announces-richland-connector-water-main-project/","https://piedmontwater.com/wp-content/uploads/2023/11/2023-PWC-Community-Awareness-and-Growth-Green-County-Service-Area.pdf","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_03022023-144","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_04112023-149","https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_09242021-62","https://www.greenecountyga.gov/Archive/ViewFile/Item/589","https://www.greenecountyga.gov/ArchiveCenter/ViewFile/Item/604"],"next_online_action":"Search county and Development Authority agenda packets, audited schedules and grant-agreement appendices for the specified ledger, draw, acceptance or payment record; check provider and EPD public permit records for implementation.","online_methods_exhausted":false,"ready_for_records_request":false,"request_submitted":false}],"source_checks":{"sources":[{"key":"dri-4509","source_url":"https://negrc.org/uploads/sites/4/2025/07/DRI4509.RichlandCrossing.GreeneCo.FinalReport-1.pdf","http_acquisition_succeeded":true,"sha256":"9d36cacd143b1ad1241bee49b6bcbfed5b37a541a5133584e27cbeaa6fc2f1bb","previous_registered_sha256":"9d36cacd143b1ad1241bee49b6bcbfed5b37a541a5133584e27cbeaa6fc2f1bb","registered_hash_matches":true,"bytes":276812,"local_original_path":"storage/raw/9d/9d36cacd143b1ad1241bee49b6bcbfed5b37a541a5133584e27cbeaa6fc2f1bb","acquired_utc":"2026-11-24T02:29:09.513892+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Development of Regional Impact (DRI). This report contains the NEGRC’s assessment of how the proposed","Plan. Also included is an assessment of likely interjurisdictional impacts resulting from the proposed","proceed with whatever final official actions it deems appropriate regarding the proposed project, but it is","Oriented District (B2). Potentially affected parties were asked to submit comments on the proposal during the 15-day","Proposed Development","Richland Crossing Investments LLC is proposing the construction of 1,408 housing units and 774,000 square feet of","feature a variety of housing types, including 127 detached single-family homes, 116 townhomes, and 1,165 low-rise"]},{"page":2,"lines":["•   Creates housing that is diverse, adequate, equitable, and affordable","The following table outlines the proposal’s alignment with these recommendations:","REGIONAL PLAN                   PROPOSED PROJECT’S COMPATIBILITY WITH RECOMMENDATION","additional housing units, thereby increasing the available workforce.","Depending on the mix of housing price points and commercial tenets selected, having a mix of","Elevates public health and      The proposal includes a walking trail throughout the development and 2 canoe/kayak access points","If some of the housing units have price points that are affordable for workers at the site’s retail","employment opportunities within a walkable distance of housing.","Supports and adds value to     The proposed project would provide additional housing and retail facilities to the community. The","Creates housing that is        The proposal includes 1,408 new housing units and 3 types of housing. Including a variety of housing","diverse, adequate, equitable,  types will likely result in variation in housing costs and values, creating more equitable and","and affordable                 affordable housing options.","Includes transportation        The development includes 14 connections to the existing road network. It also proposes extending","Protects natural and historic  There are 2 ponds located on the proposed site and Richland Creek, a tributary of Lake Oconee, flows","Creek, and there are 9 new potential stormwater retention ponds shown throughout the site. No","additional information was submitted regarding stormwater buffers or impervious setbacks. This","proposal is a suburban greenfield development in nature and clearing a large portion of the existing","Oconee by increasing stormwater runoff, erosion, and sedimentation. The developer should consider","topography of the site as possible. This would help reduce erosion, filter stormwater runoff, and","permeable pavers in off-street parking stalls to reduce stormwater runoff.","There are no known historic resources that would be affected by the proposal."]},{"page":3,"lines":["Lake Oconee is a Regionally Important Resource located within one mile of the proposed site. As stated above, clearing a","large portion of the site could increase stormwater runoff and sedimentation into Lake Oconee. The developer should","tributary of Lake Oconee. Also, if the proposal is approved, an erosion and sedimentation plan should be created and","ecological processes, sustains air and water resources, links urban settings to rural ones, and contributes to the health and","Natural Resources and Stormwater Management","There are 2 existing ponds on the proposed site, as well as Richland Creek, which flows into Lake Oconee. The applicant","states that an estimated 33% of the site would be covered in impervious surfaces. There are 9 stormwater ponds planned","to manage stormwater runoff. The proposal should be designed to minimize disruption to the existing streams, associated","wetlands, and floodplains to avoid future erosion, flooding, and degraded water quality onsite and downstream from the","Stormwater Management Manual (Blue Book) and meet all relevant EPD requirements.","The applicant states that the project is likely to affect wetlands and floodplains. According to the applicant, the proposed","development will follow the Greene County stormwater procedures and code."]},{"page":4,"lines":["hour trips and 3,003 PM peak hour trips from the proposed development. Reductions in total trips generated were","incorporated in the calculations based on trips eliminated by the mixed-use nature of the proposal. At the intersection of","on the westbound approach of Club Drive. The traffic study also submitted recommendations for the 14 proposed site","Water Supply and Wastewater","The project would be served by the Piedmont Water Company water and sewer systems with an estimated daily demand","of 0.67 MGD for each system. The applicant states that these demands can be covered by existing capacity. No water or","This proposed construction of 1,408 housing units and 774,000 square feet of commercial development on an"]}]},{"key":"dri-4399","source_url":"https://negrc.org/uploads/sites/4/2025/03/DRI4399.FinalReport.pdf","http_acquisition_succeeded":true,"sha256":"d453c76f032cba6a3ce96c4738bf6f90cde39e294f92ecf8d925f71231b13478","previous_registered_sha256":"d453c76f032cba6a3ce96c4738bf6f90cde39e294f92ecf8d925f71231b13478","registered_hash_matches":true,"bytes":278476,"local_original_path":"storage/raw/d4/d453c76f032cba6a3ce96c4738bf6f90cde39e294f92ecf8d925f71231b13478","acquired_utc":"2026-11-24T02:29:09.516141+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Lake Oconee Estates & Beach Club, LLC is proposing construction of 325 detached single-family homes on a 196-acre site","Phase I of the development includes 365 detached single-family homes and 91 acres of open space on a 264-acre site. Once"]}]},{"key":"dri-4252","source_url":"https://negrc.org/uploads/sites/4/2024/09/DRI4252.FinalReport.pdf","http_acquisition_succeeded":true,"sha256":"a14cca2eba35d80fdf752a19832df5bbe7861991e36ff4f2a6700d94fa0f8e3e","previous_registered_sha256":"a14cca2eba35d80fdf752a19832df5bbe7861991e36ff4f2a6700d94fa0f8e3e","registered_hash_matches":true,"bytes":305589,"local_original_path":"storage/raw/a1/a14cca2eba35d80fdf752a19832df5bbe7861991e36ff4f2a6700d94fa0f8e3e","acquired_utc":"2026-11-24T02:29:09.517805+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Development of Regional Impact (DRI). This report contains the NEGRC’s assessment of how the proposed","Plan. Also included is an assessment of likely interjurisdictional impacts resulting from the proposed","proceed with whatever final official actions it deems appropriate regarding the proposed project, but it is","Potentially affected parties were asked to submit comments on the proposal during the 15-day period of","Proposed Development","531 Greene LLC is proposing construction of 1,038 residential units and 18-acres of commercial development","on a 520-acre site in Greene County. The new mixed-use district would include a variety of housing options","scattered open space connected by a trail system. The site plan proposes two full-access entry lanes on US"]},{"page":2,"lines":["help accommodate additional housing needs in the county via low-density neighborhoods and quality","lakefront development. The area will support traditional single-family housing types with expanded access to","and PUD are shown as compatible with this character area. The proposal includes much more density than","proposal does include shared open space with trails and access to Lake Oconee which would expand access to","the lake. Also, the commercial area would place retail facilities within walking distance of housing, serving as","• Creates housing that is diverse, adequate, equitable, and affordable","REGIONAL PLAN                PROPOSED PROJECT’S COMPATIBILITY WITH RECOMMENDATION","Enhances economic            The marina in the proposed development would increase recreation outlets at","Depending on the mix of housing price points and commercial tenets selected,","proposes a trail system to connect the neighborhood, commercial areas, and","If some of the housing units have price points that are affordable for workers at","within a walkable distance of housing."]},{"page":3,"lines":["Supports and adds value      The proposed project would provide additional housing and retail facilities to","Creates housing that is      The proposal includes 1,038 new housing units through 5 different types of","diverse, adequate,           housing. Including a variety of housing types will theoretically result in","equitable, and               variation in housing costs and values, creating more equitable and affordable","affordable                   housing options. However, as part of this review, equitability and affordability","at the high-end of the housing market.","Includes transportation      The proposal displays a well-connected internal street network with 2 full-","land clearing, development, and land application activities on the proposed site","Mitigation of stormwater runoff should be a high priority for this proposal.","detention area to manage stormwater. The developer should also consider","the volume of stormwater runoff generated by the development.","The proposal will have no adverse effects to known historic resources.","including Lake Oconee. The proposed site plan includes a 62+ acre area dedicated to land application for","sewage and on-site water detention, as well as dispersed open space to mitigate storm water runoff into the","water supply watersheds, groundwater recharge areas, wetlands, protected mountain and river"]},{"page":4,"lines":["and water resources, links urban settings to rural ones, and contributes to the health and quality of life for","the communities and citizens sharing this network. The proposal does reserve portions of undeveloped land","1,349 AM peak hour trips and 1,367 PM peak hour trips from the proposed development. The study","proposed infrastructure.","Water Supply and Wastewater","The project would be served by a private water and sewer supply company with an estimated daily demand of","0.3221 MGD for each system. The proposal would include an on-site land application system for sewage"]},{"page":5,"lines":["demands can be covered by existing capacity. No water or sewer line extensions are anticipated as the","Stormwater Management","Erosion Control Plan, and at least one detention area are planned to manage stormwater runoff. Refer to","the site plan for the proposed location of open space and the detention area. At minimum, the project should","be in accordance with the latest edition of the Georgia Stormwater Management Manual (Blue Book) and meet","The proposed construction of 1,038 residential units and 106,000 square feet of commercial space on a 520.47-"]},{"page":6,"lines":["• Provide a sight plan including all proposed work"]}]},{"key":"dri-4105","source_url":"https://negrc.org/uploads/sites/4/2023/12/4105.DRIFinalReport.pdf","http_acquisition_succeeded":true,"sha256":"bb0eea56e6ddc9f7f38b14329ac3402b0fd87e0861e1b3e962081fa20f6dc191","previous_registered_sha256":"bb0eea56e6ddc9f7f38b14329ac3402b0fd87e0861e1b3e962081fa20f6dc191","registered_hash_matches":true,"bytes":242780,"local_original_path":"storage/raw/bb/bb0eea56e6ddc9f7f38b14329ac3402b0fd87e0861e1b3e962081fa20f6dc191","acquired_utc":"2026-11-24T02:29:09.519059+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Lake Oconee Estates & Beach Club, LLC is proposing construction of 328 detached single-family homes on a"]},{"page":2,"lines":["Number of Units          200 acres             128 acres                   328 acres","Acres of Open Space      48 acres              58 acres                    106 acres"]},{"page":4,"lines":["SITE (4,328 Land                               4,269         98.6%"]},{"page":5,"lines":["This construction of 328 detached single-family homes on a 264-acre tract zoned LR1 (Lakeshore Single-Family"]}]},{"key":"dri-3987","source_url":"https://negrc.org/uploads/sites/4/2023/06/DRI3987.FinalReport.pdf","http_acquisition_succeeded":true,"sha256":"f0fe4ae588c1c66e79eae4def4586b7130d5c0f458aaa26ecd7cca7be5a6b7f8","previous_registered_sha256":"f0fe4ae588c1c66e79eae4def4586b7130d5c0f458aaa26ecd7cca7be5a6b7f8","registered_hash_matches":true,"bytes":247635,"local_original_path":"storage/raw/f0/f0fe4ae588c1c66e79eae4def4586b7130d5c0f458aaa26ecd7cca7be5a6b7f8","acquired_utc":"2026-11-24T02:29:09.520688+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Development of Regional Impact (DRI). This report contains the NEGRC’s assessment of how the proposed","Plan. Also included is an assessment of likely interjurisdictional impacts resulting from the proposed","proceed with whatever final official actions it deems appropriate regarding the proposed project, but it is","Unit Development). Potentially affected parties were asked to submit comments on the proposal during the 15-","Proposed Development","Southwyck Homes, LLC, is proposing construction of a retirement community consisting of 700 housing units","along US-278 in unincorporated Greene County. The proposed development would occupy property totaling","The proposed housing includes 474 single-family detached houses, 75 townhome units, and 151 independent","living apartments. Amenities proposed include a clubhouse, indoor and outdoor pools, tennis and pickle ball","Fifteen stormwater management areas are designated on the site plan, as well as a 21-acre drip-field for","wastewater management. Two vehicular entrances are proposed from US-278/SR-12. Currently the site"]},{"page":2,"lines":["Oconee” Character Area. The proposed project is not compatible with the current “Agriculture, Forestry,","making a final decision on this proposal.","LAND USE/                      PROPOSED PROJECT’S COMPATIBILITY WITH DESCRIPTION","Agriculture, Forestry,         The proposed project is not compatible with this land use category.","land use category from the     lots. Listed compatible zoning districts include A1 and A2. The proposed development","North Greene/                  The proposed project is mostly compatible with this character area.","This is the site’s character   quality lakefront development” supporting “traditional single-family housing types with","been approved by DCA           The site is proposed to be rezoned to PUD, and most of the housing units proposed are","but not yet adopted by the     single-family homes or townhomes, which are both traditional single-family housing","County.                        types. The remaining housing units (151 of the 700 proposed units) would be","proposed project also includes lake-focused recreational amenities, including a scenic","infrastructure, creates diverse and affordable housing, and complements existing and planned transportation"]},{"page":3,"lines":["REGIONAL PLAN                 PROPOSED PROJECT’S COMPATIBILITY WITH RECOMMENDATION","Create diverse and            This project includes a diverse range of housing types and lot sizes: senior-living","affordable housing            apartments, townhouses, and single-family detached homes on three lot sizes.","housing units would be considered affordable for the median income of Greene County.","development pattern on        Character Area, the proposal’s development pattern would be considered compact.","This project would not be built on existing infrastructure. New transportation, water, and","wastewater infrastructure would be installed as part of this project.","Complement existing and       The proposal includes two vehicular access points, both from US-278. The proposed","planned transportation        development includes a number of trails, but there are no sidewalks or trails proposed","not clear from the site plan whether these are included in the proposal.","the DRI Additional Form, including water supply watersheds, groundwater recharge areas, wetlands,","species, maintains natural ecological processes, sustains air and water resources, links urban settings to rural"]},{"page":4,"lines":["Lake Oconee is a Regionally Important Resource within one mile of the proposed site. The site plan shows a","considerably wider than 25 feet due to vegetated areas and stormwater management areas between the","protecting the lake from contaminants in runoff, such as nutrients from lawn fertilizers and the wastewater","Water Supply and Wastewater","The project would be served by a new private water system that includes a well and storage system, and by a","new private community wastewater disposal system that includes a sewer plant and drip field. The applicant","estimates a daily water demand of 0.25 MGD and a daily sewer demand of less than 0.25 MGD. No extensions","of existing water or sewer lines are anticipated.","Stormwater Management","The proposal should be designed to minimize disruption to the existing streams, associated wetlands, and","floodplains to avoid future erosion, flooding, and degraded water quality onsite and downstream from the","of the Georgia Stormwater Management Manual (Blue Book) and meet all relevant EPD requirements.","KCI Technologies completed a traffic impact study that projects 3,095 new daily trips from the proposed","development, including 178 AM peak hour trips and 219 PM peak hour trips from the proposal. Two vehicular","entrance points are proposed, both located along US-278. The traffic study recommends that both entrances be","Elizabeth Booth, Watershed Planning and Monitoring Program Manager, Georgia Environmental Protection Division","This development is in the Lake Oconee watershed. It is a lake front development of 351 acreas and will have","a 21 acre LAS (dripfield for wastewater management). My big concern is nutrients from the LAS and its"]},{"page":5,"lines":["This proposal is 7.4 miles from the nearest open-to-the-public airport, and is located outside of any FAA"]}]},{"key":"dri-3843","source_url":"https://negrc.org/uploads/sites/4/2022/10/3843.DRIFinalReport.pdf","http_acquisition_succeeded":true,"sha256":"d26c3849570d1f0f18783288af1f55d576b247e93b140ca1786dc88146a317e3","previous_registered_sha256":"d26c3849570d1f0f18783288af1f55d576b247e93b140ca1786dc88146a317e3","registered_hash_matches":true,"bytes":235730,"local_original_path":"storage/raw/d2/d26c3849570d1f0f18783288af1f55d576b247e93b140ca1786dc88146a317e3","acquired_utc":"2026-11-24T02:29:09.522115+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Kolter Acquisition Group, LLC is proposing construction of 1,441 residential units on a 592-acre site in Greene","phase will consist of 484 units. These totals add to 1,454, which is slightly different than the number of units","listed in the initial information form (1,441 units)."]}]},{"key":"plat-2024-07-26","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_07262024-234","http_acquisition_succeeded":true,"sha256":"59676e85381cb46e1601714ad38a959a5f35bd8e250402fa7425bcb7019985f0","previous_registered_sha256":null,"registered_hash_matches":null,"bytes":52360,"local_original_path":"storage/raw/59/59676e85381cb46e1601714ad38a959a5f35bd8e250402fa7425bcb7019985f0","acquired_utc":"2026-11-24T02:29:09.522669+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":2,"lines":["Development Authority – Wastewater Collection System Expansion Project: The","Board received background information that a wastewater collection system expansion","Club: The Commissioners reviewed a request seeking Preliminary Plat approval for 372","creating 372 lots from 264.18 acres, provided, however, that the approval is conditioned","qualifying wastewater collection system to serve the development. Commissioner"]}]},{"key":"kolter-2023-02-14","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_02142023-141","http_acquisition_succeeded":true,"sha256":"1b7d7f64dfa39d835e2d6bf6d49bd23fdd5d31d12892a73e360ef2c1c947d981","previous_registered_sha256":null,"registered_hash_matches":null,"bytes":208838,"local_original_path":"storage/raw/1b/1b7d7f64dfa39d835e2d6bf6d49bd23fdd5d31d12892a73e360ef2c1c947d981","acquired_utc":"2026-11-24T02:29:09.523452+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["PUD, Richland Connector: The Board reviewed a request seeking rezoning of 515 acres","from A1 to PUD for the 515 acres identified as tax map and parcel number 074-0-00-","no Preliminary Plat will be approved for the PUD development until the developer has","received approved roadway designs from Greene County for the development’s"]},{"page":2,"lines":["timeline for new homes that is acceptable to Greene County that aligns with"]}]},{"key":"oconee-shores-2025-01-14","source_url":"https://www.greenecountyga.gov/AgendaCenter/ViewFile/Minutes/_01142025-272","http_acquisition_succeeded":true,"sha256":"cfb4a9d36119771188f03f8a71b2e7aae9bd01ede1803d7b3be552ec387508f7","previous_registered_sha256":null,"registered_hash_matches":null,"bytes":70770,"local_original_path":"storage/raw/cf/cfb4a9d36119771188f03f8a71b2e7aae9bd01ede1803d7b3be552ec387508f7","acquired_utc":"2026-11-24T02:29:09.524028+00:00","acquisition_credit":"revalidation of existing indexed source; not a newly discovered document","review_method":"PDF text extraction; plat page 2, Kolter approval page 2 and DRI3843 page 1 additionally inspected as rendered original images","checked_excerpts":[{"page":1,"lines":["Consideration of a Rezoning Request – 531 Greene, LLC, 519.69 acres on Madison","Hwy: The Commissioners reviewed a request to rezone 519.69 acres located on Madison","submitted by 531 Greene, LLC amending the Zoning from A1 and LR1 to PUD for the","519.69 acres located on Madison Highway identified as tax map and parcel numbers 010-","development receiving final approval from the State of Georgia for a community water","system and a community wastewater system, and with the condition that a 100-foot","building setback line that includes a minimum 50-foot densely vegetated buffer be"]}]}],"online_access_checks":[{"url":"https://greenecoga.api.civicclerk.com/v1/Meetings","http_status":403},{"url":"https://greenecoga.portal.civicclerk.com/","http_status":403},{"url":"https://greenecoga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=6731,plainText=false)","http_status":403},{"url":"https://www.greenecountyga.gov/AgendaCenter/Board-of-Commissioners-4","http_status":200}],"all_lawful_online_methods_exhausted":false,"next_method":"Follow current official county/agency indexes for missing controlling plans, utility approvals and paid records. CivicClerk returned HTTP 403 with contact-site-owner message in both HTTP and normal browser retrieval; consider a custodian access-link inquiry or a scoped request only after other official online sources are checked.","browser_access_checks":[{"url":"https://greenecoga.portal.civicclerk.com/","status":403,"title":"","body_excerpt":"{\"message\":\"Please contact the site owner for access.\"}"},{"url":"https://greenecoga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=6731,plainText=false)","status":403,"title":"","body_excerpt":"{\"message\":\"Please contact the site owner for access.\"}"}],"search_checks":[{"queries":["site:greenecountyga.gov \"2026\" \"Lake Society\" \"November\"","site:greenecountyga.gov \"Kolter\" \"preliminary\" \"2026\"","site:greenecountyga.gov \"Lake Oconee Estates\" \"365\""],"result":"No indexed results returned; not proof that documents do not exist."}]},"counts":{"case_groups":8,"events":54,"conditions":18,"missing_record_items":17,"original_sources_revalidated":9},"requests_submitted":0}
