Greene County, Georgia · The public recordThe findings · Take part · Standards
Greene CountyCurrent
Follow the record

What happened, in order

Eight priority case groups. Proposals, decisions, reported outcomes and missing evidence stay separate.

Return to the aggregate findings

Southwyck / The Lake Society

Approved 502-lot 2024 preliminary plat; 559-dwelling 2026 agenda and reported outcomes remain separate.

  1. regional review complete

    documentary evidence with caveat

    Regional review of The Lake Society at Lake Oconee, sponsored by Southwyck Homes LLC; initial proposal was 700 housing units on about 315 acres, prior to county 2023 conditional rezoning.

    700 was a proposal, NOT the number approved in September 2023; projected May 2027 completion was not verified construction.

    Original source · DRI #3987 p.1,4

  2. local motion

    reviewed motion

    Approve Southwyck Homes PUD rezoning on Madison Highway for three parcels totaling 314.36 acres, subject to listed restrictions.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF p.1

  3. preliminary plat approved

    documentary evidence with caveat

    Commissioners approved Atwell LLC preliminary plat for The Lake Society, 502 lots on 317.873 acres. Jeffery Smith moved, Angela Walker Deering seconded, unanimous collective result.

    Preliminary plat is a planning approval; no final plat, actual construction, property title or condition compliance is established here.

    Original source · BOC July 9, 2024 minutes p.1

  4. local motion

    reviewed motion

    Approve preliminary plat submitted by Atwell, LLC for The Lake Society, creating 502 lots from 317.873 acres along Madison Highway.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 1

  5. amended plat agenda

    documentary evidence with caveat

    Official agenda listed a request by Atwell LLC to amend The Lake Society preliminary plat to 559 dwellings on 317.873 acres.

    Agenda is not a decision; no approval or denial is inferred from this source.

    Original source · BOC August 11, 2026 agenda p.1

  6. reported amended plat denial

    reported

    A third-party compilation of official meeting records reports the board DENIED the amended 559-dwelling preliminary plat 4-1.

    Original official meeting minutes stream requires access; cannot attribute the votes to individuals or certify the copied summary until primary minutes are retrieved.

    Original source · August 11, 2026 BOCC listing, minute excerpts

  7. reported amended plat agenda

    reported

    November 2026 listing again describes an amendment for 559 dwellings / 317.873 acres, apparently returning to BOCC.

    Only agenda copy accessible; no original November 2026 decision minutes or record of a successful approval was verified.

    Original source · November 10, 2026 BOCC listing and referenced official fileId 7806

  8. reported amended plat approval

    reported

    A real-estate community guide reports Nov 10 2026 BOCC approved the amended 559-home preliminary plat, following Aug 11 2026 reported denial.

    County November 10 2026 agenda is located but the ORIGINAL final minutes/recorded vote were not obtained; independent claim is plausible but NOT verified county action, construction or final approval.

    Original source · Lake Society development guide (published November 2026), project timeline

Conditions in the archive

  • Density not above 1.78 units per acre Compliance: unknown · Source
  • Open space at least 35% Compliance: unknown · Source
  • Short-term rentals prohibited Compliance: unknown · Source
  • Minimum lot size 7,000 square feet Compliance: unknown · Source
  • Age-restricted community Compliance: unknown · Source

The missing links

  • Approved August 11 and November 10, 2026 BOC minutes and signed amended plat for 559 dwellings
  • Current controlling plat and phase map; certificates of occupancy by phase

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Kolter rezoning / Cove at Harbor Club regional review

Related applicant and parcel evidence; 592-acre DRI is not assumed identical to the 515-acre conditional rezoning.

  1. regional review complete

    documentary evidence with caveat

    The Cove at Harbor Club: 1441 proposed housing_units. 592-acre regional proposal. DRI 3842 was withdrawn.

    Related applicant and parcel evidence; 592-acre DRI is not assumed identical to the 515-acre conditional rezoning. Regional review is advisory, not local approval, construction or payment.

    Original source · DRI 3843, page 1

  2. local motion

    reviewed motion

    Approve the rezoning request submitted by Kolter Group Acquisitions, LLC, amending the Zoning from A1 to PUD for the 515 acres identified as tax map and parcel number 074-0-00- 001-1, tax map and parcel number 074-0-00-006-0, and a portion of tax map and parcel number 074-0-00-001-A as shown in the application, conditioned upon the provision that no Preliminary Plat will be approved for the PUD development until the developer has received approved roadway designs from Greene County for the development’s intersections with Club Drive and Richland Connector, and an approved development timeline for new homes that is acceptable to Greene County that aligns with improvements to State Route 44 at the Club Drive and Richland Connector Intersections

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · Original source minutes PDF motion 3

Conditions in the archive

  • No preliminary plat approval until the developer receives county-approved roadway designs for development intersections with Club Drive and Richland Connector. Compliance: unknown · Source
  • Developer must receive county approval of a new-home development timeline aligned with State Route 44 improvements at Club Drive and Richland Connector. Compliance: unknown · Source

The missing links

  • Signed final rezoning resolution and legal exhibits mapping 515 acres to DRI3843 boundary
  • County-approved intersection designs for Club Drive and Richland Connector, approved SR44-aligned home-development timeline, and any preliminary plat approval

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Richland Crossing

DRI housing proposal and three parcel-specific rezonings; common parent parcels do not establish identical tract boundaries.

  1. regional review complete

    documentary evidence with caveat

    Richland Crossing: 1408 proposed housing_units. 388 acres with 774,000 square feet proposed commercial.

    DRI housing proposal and three parcel-specific rezonings; common parent parcels do not establish identical tract boundaries. Regional review is advisory, not local approval, construction or payment.

    Original source · DRI 4509, page 1

  2. local motion

    reviewed motion

    Approve Resolution 2025.9.9(c) for A1-to-RM rezoning of 95.31 acres on Wrightsville Church Road, parent parcel 054-0-00-024-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 1

  3. local motion

    reviewed motion

    Approve Resolution 2025.9.9(d) for A1-to-B2 rezoning of 96.20 acres on State Route 44, parent parcel 054-0-00-020-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 1

  4. local motion

    reviewed motion

    Approve Resolution 2025.9.9(e) for A1-to-RM rezoning of 162.10 acres on State Route 44, parent parcel 054-0-00-020-0, as requested by Rick McAllister for Jesse Copelan Jr. and Kaye Copelan.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

Conditions in the archive

  • No separately structured conditions in this case register; inspect the original decision.

The missing links

  • Signed zoning resolutions 2025.9.9(c), (d) and (e), legal exhibits and residential unit schedules
  • Piedmont service commitment, capacity reservation dates and facility assignment; latest controlling plan and occupancy inventory

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Oconee Shores

Conditional 519.69-acre PUD rezoning documented January 14, 2025; DRI1,038 units remain proposal-stage.

  1. regional review complete

    documentary evidence with caveat

    Oconee Shores: 1038 proposed housing_units. 520 acres with 18 acres proposed commercial.

    Conditional 519.69-acre PUD rezoning documented January 14, 2025; DRI1,038 units remain proposal-stage. Regional review is advisory, not local approval, construction or payment.

    Original source · DRI 4252, page 1

  2. local motion

    reviewed motion

    Approve the rezoning request submitted by 531 Greene, LLC amending the Zoning from A1 and LR1 to PUD for the 519.69 acres located on Madison Highway identified as tax map and parcel numbers 010- 0-00-006-0, 010-0-00-006-A, 010-0-00-006-B, and 010-0-00-006-C, contingent upon the development receiving final approval from the State of Georgia for a community water system and a community wastewater system, and with the condition that a 100-foot building setback line that includes a minimum 50-foot densely vegetated buffer be maintained along Madison Highway

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · Original public BOC minute text, motion clause 2; page-image check pending

Conditions in the archive

  • Obtain final state approval for community water and wastewater systems. Compliance: unknown · Source
  • Maintain a 100-foot building setback including a minimum 50-foot densely vegetated buffer along Madison Highway. Compliance: unknown · Source

The missing links

  • Final state approvals for community water and wastewater systems for 531 Greene LLC property
  • Approved controlling plan, buffer/setback exhibit, permit register and occupancy inventory

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Lake Oconee Estates & Beach Club — phases kept separate

Phase I approvals and Phase II denial are separate; 328 proposed homes, 372 plat lots and later 365-home description are not interchangeable.

  1. regional review complete

    documentary evidence with caveat

    Regional planning assessment of proposed 328 detached homes on 264 acres; original proposed October 2026/2028 phase completion dates.

    DRI report is advisory, dates are developer projections, not approvals or completed buildings.

    Original source · DRI #4105 p.1

  2. planning zoning recommendation

    documentary evidence with caveat

    Planning and Zoning Commission recommended 264-acre A1/LR1-to-PUD rezoning for Lake Oconee Estates & Beach Club conditional on approved community water and sewer, Al Brinkman moved and Tommy Swann seconded.

    Advisory planning recommendation not a BOC approval; collective unanimous vote is not individualized.

    Original source · P&Z January 30, 2024 minutes pp.1-2

  3. conditional rezoning approved

    documentary evidence with caveat

    BOC conditionally approved A1/LR1-to-PUD rezoning of 264 acres, parcel 091-0-00-011-B, effective only upon an approved community water and wastewater system confirmed by the county Building Official. Angela Walker Deering moved, Dee Lindsey seconded; carried unanimously.

    The record documents conditional approval, not proof that utility plans were accepted, zoning became effective, lots were built or certificates issued.

    Original source · BOC February 13, 2024 minutes p.1

  4. local motion

    reviewed motion

    Conditionally approve the rezoning of 264 acres on Veazey Connector, parcel 091-0-00-011-B, from A1 and LR1 to PUD; effective when an approved community water and wastewater plan complying with county code is confirmed by the Building Official.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 1

  5. local motion

    reviewed motion

    Approve preliminary plat for 372 lots on 264.18 acres at Lake Oconee Estates and Beach Club, conditional on written verification of a qualifying wastewater connection or development.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  6. regional review complete

    documentary evidence with caveat

    Regional review of proposed Phase II of Lake Oconee Estates and Beach Club: 325 homes on roughly 196 acres, to extend earlier Phase I.

    Advisory review, not county approval. Existing Phase I and rejected Phase II must remain separate.

    Original source · DRI #4399 p.1

  7. source conflict

    documentary evidence with caveat

    April 2025 staff memo states previous February 2024 approval covered 1,047.52 acres. Original February 13 2024 approved county minutes expressly state 264 acres; 2023 DRI #4105 also says 264.

    Unreconciled discrepancy in retrospective staff packet. Do not replace original Feb 2024 264-acre action with uncorroborated 1,047.52-acre staff assertion.

    Original source · April 2025 staff packet Request for Board Action, p.3

  8. local motion

    reviewed motion

    Motion to approve Lake Oconee Estates & Beach Club LLC PUD rezoning of 191.28 acres with six stated conditions; motion received no second and did not proceed to vote.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 1

  9. local motion

    reviewed motion

    Deny Lake Oconee Estates & Beach Club LLC request to rezone 191.28 acres on Leslie Mill Road/Veazey Connector from A1 to PUD; carried 4-1.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  10. reported lawsuit

    documentary evidence with caveat

    Local news reported a lawsuit filed after the April 8, 2025 rezoning denial.

    No original Greene Superior Court complaint/docket, judicial ruling, dismissal or settlement has been verified.

    Original source · Lake Oconee News June 2025 clipping, continued report

  11. corridor policy enacted

    documentary evidence with caveat

    BOC approved Resolution 2025.10.14(d), temporarily restricting acceptance of rezoning applications within 1,500 feet of Veazey Connector centerline between Walker Church Road and Veazey Road.

    Area-level policy affecting a corridor, not a decision on this developer's 2025 rejected application nor evidence about actual construction.

    Original source · BOC October 14, 2025 minutes p.2

  12. extension decision unknown

    documentary evidence with caveat

    The November agenda included possible moratorium extension, but the adopted minutes do not separately record a vote on that proposed item.

    DO NOT assert that the November 18 agenda item passed or that the moratorium was still operative in late 2026.

    Original source · BOC November 18, 2025 minutes pp.1-3

Conditions in the archive

  • Applicant must provide written verification of development or connection to qualifying wastewater collection infrastructure. Compliance: unknown · Source
  • Conditional PUD rezoning effective only after county Building Official confirms approved community water AND wastewater systems that comply with county code. Compliance: unknown · Source

The missing links

  • Signed July 26, 2024 preliminary plat legend specifying residential, amenity, common and utility lots; later revisions reconciling 372 lots and 365 homes
  • Building Official determination activating February 13, 2024 conditional zoning and written wastewater verification required by July plat
  • Phase II court docket, filed complaint and any subsequent judgment or settlement affecting April 8, 2025 denial

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Club Drive

The May agenda and June decision identify different parcels; related roadway completion is not site-condition compliance.

  1. historical access court case

    documentary evidence with caveat

    Published 2002 appellate opinion affirmed judgment that Copelan retained a six-inch privately owned strip along Club Drive, which affected road access for Harbor Club Tracts 6 and 7; cites Sep 20 1990 Club Drive warranty deed to the county and separate Harbor Club tract conveyances.

    Historic conveyance and 2002 judicial findings are geographically relevant to Club Drive but NOT proof that the same strip or tracts are inside the 2025 22.5-acre rezoning, not a 2026 deed/title search, and not evidence of any local official's current interests. Do not infer misconduct or 2025 access restriction compliance.

    Original source · Georgia Court of Appeals Harbor Co. v. Copelan 256 Ga.App.79, A02A0102, June 24 2002, opinion pp.1–2, paragraphs of 1990 conveyances and court holdings

  2. historical parcel application contradiction

    documentary evidence with caveat

    The EXACT parcel 070-0-00-048-0 on Willow Run Road appearing unexpectedly in the May 2025 Club Drive 22.5-acre agenda was already cited in the 2022 official P&Z agenda and minutes for a distinct Frey–Moss Structures Inc application (Jay Dell representative), 15.42 acres from A1 to Light Industrial. The 2025 BOC approved minutes instead used 054-0-00-024-0 on Club Drive.

    A concrete evidence-backed alternate source for the 2025 May agenda’s out-of-place Willow Run parcel number. Likely template/copy-forward error is a hypothesis, not a certified official erratum. The 2022 15.42ac Frey–Moss parcel is unrelated to the 2025 Copelan 22.5ac approval unless signed legal exhibits establish otherwise; do not erase either source or assert title. Obtain certified zoning file, mapping, and legally filed approval plat.

    Original source · Planning & Zoning Commission October 25, 2022 adopted minutes, pp.1–2, Frey–Moss Structures 15.42-acre application

  3. source conflict

    documentary evidence with caveat

    Official P&Z agenda names the 22.5-acre A1 to B1 application for Jesse and Kaye Copelan on Club Drive but says TMP 070-0-00-048-0 on Willow Run Road. Approved BOC June 10 minutes instead identify 054-0-00-024-0 on Club Drive.

    These are conflicting official parcel/address identifiers for apparently the same named 22.5-acre rezoning. Neither agenda nor meeting-minutes parcel reference is a certified recorded legal survey. Obtain signed zoning application, final resolution, recorded tract plat and parcel split before any geospatial implementation claim.

    Original source · Greene P&Z May 27 2025 official agenda p.1, item V.1

  4. local motion

    reviewed motion

    Approve conditional A1-to-B1 rezoning for 22.50 acres at Club Drive, a portion of parcel 054-0-00-024-0, on request by Rick McAllister on behalf of Jesse and Kaye Copelan.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  5. regional review complete

    documentary evidence with caveat

    Richland Crossing regional review covers roughly 388 acres including parent parcels 0540000240 and 0540000200; 1,408 proposed housing units, 774,000 sq.ft. proposed commercial development. July 2025 report after the June Club Drive rezoning.

    The 22.5-acre Club Drive rezoning refers to a portion of the parent parcel. Overlap of a parent parcel does NOT prove that this precise rezoning tract is coextensive with the full DRI site or prove building start.

    Original source · DRI #4509 pp.1,4

  6. related parent parcel rezonings

    documentary evidence with caveat

    County approved separate 95.31-acre RM rezoning on parent parcel 054-0-00-024-0 plus two rezonings on parent parcel 054-0-00-020-0.

    Related policy and parent-parcel actions, not documentation that the 22.5-acre Club Drive conditions were satisfied.

    Original source · BOC September 9, 2025 minutes pp.1-2

  7. area public road reported complete

    documentary evidence with caveat

    County FY2025 audited management report confirms completion of the public Wrightsville Church Road Extension. The TSPLOST fund's aggregate capital outlay rose $1,744,608 in part with this project, but the audited narrative does not isolate the project's direct paid amount.

    Relevant to Club Drive roadway/traffic corridor only. Not evidence that Club Drive's private site road entrance, plat recording, buffer, setbacks or any one of seven approval conditions was satisfied; aggregate TSPLOST increase is NOT a contract or vendor paid amount for this project.

    Original source · Greene County FY2025 ACFR, MD&A printed page 19, TSPLOST paragraph

Conditions in the archive

  • Record an approved plat for the 22.50-acre subject property within 60 days. Compliance: unknown · Source
  • Limit parking-area lighting to maximum 3 footcandles and pedestrian hazard lighting to maximum 4 footcandles, with concealed light sources. Compliance: unknown · Source
  • Use described primary facade materials; at least 80% brick/stone front and 50% brick/stone sides, with rear and decorative-material rules. Compliance: unknown · Source
  • Screen rooftop mechanical equipment using sufficiently tall parapet walls or mansard roofs. Compliance: unknown · Source
  • Provide minimum 50-foot Type D vegetative buffer at Club Drive and Wrightsville Church Road, excluding a wall or fence. Compliance: unknown · Source
  • Provide minimum 100-foot setback for vertical structures along Club Drive and Wrightsville Church Road. Compliance: unknown · Source
  • Provide both Wrightsville Church Road and Club Drive access, keeping the Club Drive entrance closed for up to 18 months. Compliance: unknown · Source

The missing links

  • Signed application, June 10, 2025 approval/resolution and legal exhibits resolving parcel 070-0-00-048-0 versus 054-0-00-024-0
  • Recorded 22.5-acre plat required within 60 days of June 10, 2025 approval; county acceptance of seven conditions

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

Richland Connector / Walker Church wastewater funding

County→Authority→Piedmont grant legs describe the same up-to-$2 million chain; do not sum them as $4 million or treat them as payments.

  1. utility capital plan

    documentary evidence with caveat

    Separate 2023 Piedmont Water capital plan lists Harbor Club–Richland Connector–Walker Church SEWER connection at $2,098,331, in a DIFFERENT sewer row from the $4.115m water main.

    The 2023 utility plan predates the 2024 county/Development Authority wastewater IGA. The planned corridor and amounts MAY relate but are NOT established as that signed IGA's scope, county spending, invoice, capital completion or reimbursement.

    Original source · 2023 Piedmont Water capital improvement schedule PDF p.10, sewer section

  2. pre authorization discussion

    documentary evidence with caveat

    County manager described preliminary discussions for public-private wastewater extension down Connectors and Walker Church Road, with future contract and possible cost recovery.

    Minutes expressly say NO ACTION WAS TAKEN on wastewater that day.

    Original source · BOC March 27, 2024 minutes p.1

  3. local motion

    reviewed motion

    Approve intergovernmental agreement with Greene County Development Authority for wastewater collection expansion serving Richland Connector and Walker Church areas.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  4. local motion

    reviewed motion

    Approve the Intergovernmental Agreement for Wastewater Collection System Expansion Project (2024) (attached hereto and made a part of)

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · Original minutes PDF p. 2, Recorded MOTION and VOTE

  5. intergovernmental agreement executed

    documentary evidence with caveat

    Executed County–Authority IGA dated August 13. Article IV specifies a $2 million County transfer to the Authority, a separate $5,000 administrative fee, and reasonable outside counsel fees. The preliminary project budget is $13.4 million.

    The transfer clause is tied to the effective date of the corresponding participation agreement. Cash transfers, fee payments and treatment-system commissioning remain unverified.

    Original source · Original Authority packet PDF pp. 4, 8–9, 13

  6. local motion

    reviewed motion

    Approve Piedmont wastewater collection system expansion economic development grant agreement documents

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · Original minutes PDF p. 2, Recorded MOTION and VOTE

  7. economic development grant agreement executed

    documentary evidence with caveat

    Executed Authority–Piedmont Water Resources, LLC Economic Development Grant Agreement dated November 12. The agreement provides for a project grant of up to $2 million and calls for final cost and contractor-payment evidence upon completion.

    This is the downstream grant leg of the same $2 million funding chain, with disbursements subject to the agreement terms. No grant advances or recipient contractor payments are verified.

    Original source · Original Authority packet Appendix A PDF pp. 6–8, 14, 19, 24

  8. related development utility context

    documentary evidence with caveat

    Richland Crossing DRI states applicant expects Piedmont Water Company water AND sewer services, with estimated 0.67 MGD demand for each system.

    An applicant's expectation of utility service is NOT evidence of signed capacity agreements, installed county wastewater infrastructure, invoices or paid amounts; do not confuse 2024 water-main press announcements with sewage collection completion.

    Original source · DRI #4509 p.4

  9. reported pipe installed

    reported

    Local real estate guide reports Piedmont Water installed sewer pipe along Walker Church Road in 2026 and Beaverdam/West Place neighborhoods seek to connect.

    Not official county/utility engineering acceptance, operating permit, pipe length, full Richland Connector IGA completion, lot connections, contractor invoices, or county reimbursement.

    Original source · Realtor community guide, Homes and the Sewer That Changes Everything, updated Nov 3 2026

Conditions in the archive

  • No separately structured conditions in this case register; inspect the original decision.

The missing links

  • County $2 million transfer ledger and check/ACH records; separate $5,000 administration fee and legal-fee disbursements
  • Authority grant draw approvals, recipient receipts, final cost certifications and contractor-payment evidence required by November 12, 2024 grant agreement
  • Engineering acceptance and operating authorization specifically for this wastewater collection-system scope

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.

2023 water-main interconnection

Distinct from wastewater project; audited budget adjustment and reported contract completion do not establish itemized payments.

  1. local motion

    reviewed motion

    Tentatively commit $1 million in American Rescue Plan funds for Richland Connector water-main extension to Walker Church water system, conditional on formal contract and scope.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  2. tentative funding

    documentary evidence with caveat

    BOC tentatively committed $1 million in federal ARP funding for Richland Connector water-main extension and Walker Church tie-in, contingent on later formal contract and scope. Angela Deering moved, Jeffery Smith seconded; unanimous collective result.

    Tentative commitment was conditioned on later contract; not actual appropriation, executed contract or cash payment.

    Original source · BOC Sept 24, 2021 minutes p.2

  3. local motion

    reviewed motion

    Authorize negotiations for Richland Connector water-main interconnection serving Walker Church and Reynolds systems, county commitment capped at $1.5 million.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 2

  4. negotiations authorized

    documentary evidence with caveat

    BOC authorized negotiations for water main along Richland Connector linking Walker Church and Reynolds water systems, capped COUNTY COMMITMENT at $1.5 million. Angela Deering moved, Ernie Filice seconded; unanimous collective result.

    2023 cap is not incremental to the 2021 tentative $1 million and NOT evidence of payment. It governs water main, not 2024 wastewater collection agreement.

    Original source · BOC March 2, 2023 called minutes p.2

  5. local motion

    reviewed motion

    Approve Resolution 2023.4.11(d) authorizing a contract for water-service extension along Richland Connector to serve Emergency Services Facility and connect water systems.

    Motion outcome is not a completed development or payment. Motion makers and seconders are not automatically named yes voters.

    Original source · PDF page 3

  6. water contract authorized

    documentary evidence with caveat

    BOC approved Resolution 2023.4.11(d) authorizing a contract for water service across Richland Connector to County Emergency Services Facility and interconnect systems. Angela Deering moved, Dee Lindsey seconded.

    Authorization of water service contract, NOT evidence contract was signed, funded or installation certified.

    Original source · BOC April 11, 2023 minutes p.3

  7. utility capital plan

    documentary evidence with caveat

    Piedmont Water's own 2023 capital plan lists Harbor Club–Richland Connector–Walker Church–Leach WATER-MAIN project at $4,115,000, including proposed 26,000 feet of 10-inch water main and a booster pumping station.

    This is a utility PLANNED capital estimate, NOT county appropriation, signed vendor agreement, expenditure, verified delivered cost, or utility completion. $1.5m 2023 county negotiation cap is a DIFFERENT accounting scope.

    Original source · 2023 Piedmont Water capital improvement schedule PDF p.10 and water system project pages p.12–13

  8. company water main announcement

    documentary evidence with caveat

    Utility announcement says Richland Connector water-main capital investment was more than $4 million, supporting existing customers and future residential areas.

    Company-stated investment is not independently audited county disbursement and does not establish 2024 wastewater collection-system delivery or county payment.

    Original source · May 21, 2024 Piedmont Water Company announcement reprinted by Middle Georgia CEO

  9. audited budget adjustment

    documentary evidence with caveat

    Greene County's FY2024 audited management discussion says the county used prior-year General Fund balance to cover $1,500,000 for the water-line extension project approved in March 2023.

    This documents an enacted $1.5 million FY2024 General Fund budget adjustment, NOT $1.5 million of verified itemized vendor cash disbursements; must not be added to 2023 negotiation cap as a second payment.

    Original source · Greene County FY2024 ACFR, MD&A printed page 20, General Fund Budgetary Highlights, paragraph a

  10. county acfr reported contract completion

    documentary evidence with caveat

    County's FY2025 audited financial report expressly attributes a decline in general government spending partly to the completion of a water-line extension contract in FY2024. FY2024 audited report separately identifies the March 2023 approved $1.5 million water-line extension budget item; these disclosures jointly corroborate downstream implementation.

    This is the COUNTY'S statement of contract completion by FY2024, linked to March 2023 water extension by shared date/description. The FY2025 sentence does not repeat 'Richland Connector' or name the contractor. Do NOT treat this as a signed engineering acceptance, live service certification, $1.5m paid, final contractor invoice, or closeout of 2024 WASTEWATER IGA.

    Original source · Greene County FY2025 ACFR, MD&A printed page 18, General Fund expenditures, first bullet

Conditions in the archive

  • No separately structured conditions in this case register; inspect the original decision.

The missing links

  • Executed March 2023 water-line extension contract, final invoice, itemized county payments and signed acceptance certificate

No verified net approved-unit, completed-unit or paid-amount total is calculated from these records.