00:00 - 00:04 If you'll stand, join us in our pledge, followed by the invocation, please.

00:07 - 00:14 I pledge allegiance to the flag of the United States of America and to the Republic for which it stands.

00:14 - 00:20 One nation, under God, indivisible, liberty and justice for all.

00:20 - 00:26 Let us pray. Dear Heavenly Father, thank you so much for this day, thank you for this time that you've given given to us to come and discuss.

00:26 - 00:30 for the issues in our county. Father, we thank you for each person represented.

00:30 - 00:36 Father, for each commissioner who gives of their time and sacrifices their time to serve this community.

00:36 - 00:40 And Father, we thank you for this season as we celebrate the birth of our Savior.

00:40 - 00:45 And Father, we realize that all our blessings come from you. And we thank you and we ask you to be with us during this meeting.

00:46 - 00:47 In Jesus' name we pray.

00:47 - 00:47 Amen.

00:53 - 00:54 All right.

00:55 - 00:59 I'd like to go ahead and call the meeting to order. All commissioners are present.

01:00 - 01:02 Under the zoning and subdivision item

01:03 - 01:23 Uh consideration of a request for a conditional use permit for SFG Development Services, LLC, as authorized agent for Bandit Holdings, LLC, for a distribution center located on approximately twenty point four two acres, which are a portion of

01:23 - 01:38 TMP number one two five dash zero dash zero zero dash zero two seven dash zero and one two six dash zero dash zero zero dash zero three six dash zero

01:40 - 01:44 This item was previously tabled uh at our last uh commission meeting um

01:46 - 01:50 We're looking at uh a project that has uh expanded now.

01:50 - 01:56 Um we've ha we're dealing with some outstanding issues concerning landlock property.

01:57 - 02:06 Um and I think we would recognize Chuck to uh address any comments or concerns of staff with that issue.

02:06 - 02:06 Okay.

02:10 - 02:14 Chuck, do you you think it's better for you to go first? Yeah, I think so.

02:18 - 02:20 Thank you guys for those for us to turn it on.

02:25 - 02:26 There we go.

02:27 - 02:28 You can hear on this thing too.

02:30 - 02:41 So uh with this project I just want to give the board a little background because I don't want anybody uh thinking that there's a major, major issue here.

02:41 - 02:52 But what we have is Marty McClure owns the property with Bandit Holdings and he still owns this no matter about Project Azalea purchasing this.

02:52 - 02:57 Right now, Marty still owns it. When he sells this piece of property

02:58 - 03:05 to Project Azealia. He is creating what GDOT is trying to say is a landlock parcel.

03:05 - 03:13 We are there's a lot of moving parts here. And this team from Project AZalea has been great to work with.

03:15 - 03:23 They have a client that they have to go to, so it's not just a we get to talk to them, then they have to go talk to their people.

03:24 - 03:27 What it is right now is GDOT is

03:28 - 03:41 Uh giving us some conflicting information and we need a little bit more time to all of us group get group up and sit down with GDOT to find an easement to the what they're calling a landlock.

03:47 - 03:48 There we go.

03:49 - 04:01 So we just need a little bit of more time to find the easement to the landlock parcel back to Brooks Cemetery if GDOT is not going to give a commercial.

04:01 - 04:04 Access off of how it's going on.

04:06 - 04:07 Yeah, it's it's going on.

04:08 - 04:09 Yeah.

04:10 - 04:14 Okay. Well I'm gonna go without it. But

04:16 - 04:30 we we've just got to come up with a a way for this landlock parcel to have an easement over to Brooks Cemetery or get GDOT to agree that they're going to give a com a um curvy to highway seventy seven.

04:31 - 04:45 So I would ask, and I've spoken with the with the applicants, we would ask that this would be tabled uh to the January 13th meeting to allow us some more time to work this out.

04:45 - 04:49 Um I believe they are all in agreement.

04:52 - 04:55 Um everyone should their head, yes.

04:55 - 05:01 So we are assured that we will have something put together by January thirteenth.

05:01 - 05:09 Marty McClure ran around yesterday like a chicken with his head cut off trying to acquire property, trying to get an easement uh from people.

05:09 - 05:10 It it just

05:11 - 05:17 We're just out of time. So I I I would appreciate it the board would take for January the 13th.

05:18 - 05:22 Okay. Thank you, Chuck. Gentlemen, I know y'all had signed up to speak.

05:22 - 05:23 Would you still like to speak?

05:24 - 05:30 Is it Mr. Estees? Yes, sir. Thank you. Yes, sir. Dustin Estes was still involved with uh project.

05:31 - 05:41 Um yeah, and I I think we're going to have to uh just so that everyone understands, each time you have a public meeting and and the client, the name of the client gets out, these things get harder.

05:42 - 05:54 un unfortunately and that that's what we ran into where uh we were gonna Marty's trying to purchase the back portion, they came at the last hour and asked for an extra two hundred and fifty grand for it, knowing who the client is.

05:54 - 05:58 And um that's just how these things happen unfortunately.

05:58 - 06:03 But what we're going I think what we're gonna end up needing is is some help from the county.

06:03 - 06:07 We have some solutions and and I hope everyone's amenable.

06:07 - 06:13 We're this close to them pulling the plug. So I mean it'll go to a neighboring county and that's what'll happen and they will

06:13 - 06:19 That's not what we want, right? And and I'm on a tight uh tight schedule at this point.

06:19 - 06:25 I was in New York on Monday with them and they're accelerating everything and I'm getting yelled at.

06:25 - 06:39 So that just that's where we're at. We're working with everyone, but we may need some help here from the county in terms of um you know figuring out these buffers and figuring out how we're gonna make this work uh because I don't think we're gonna be able to purchase some of that extra.

06:40 - 06:48 land now uh you know with Marty and the way Amazon doesn't play well once people start gouging right it that's just where it goes.

06:48 - 06:54 So anyways uh we're gonna try to do our best here but um I I think that's where we're at.

06:54 - 07:04 We're gonna try to meet with building departments and folks here today and see what we can get but appreciate everyone's help we're gonna keep trying to what's the status with GDOT

07:05 - 07:08 On that as far as them speak to this Russell, then maybe a better

07:11 - 07:18 one. Uh Kim Remorne, uh Silver Hope Project without the right three, he's just speaking up a little louder to make you.

07:19 - 07:30 Yeah. Um so um with the us you know acquiring this extra land, there's concern about the parcel you're creating to the north.

07:31 - 07:44 not having proper access to highway seventy seven. Um so it it was a requirement from the county for us to you know go to GDOT and try to confirm that access.

07:45 - 07:56 Um GDOT has been very difficult throughout this process to work with on access for not only our parcel but obviously this new parcel as well.

07:56 - 08:00 We've shown that this parcel can meet adequate site distance.

08:00 - 08:04 It has about four hundred feet of frontage on Highway 77.

08:04 - 08:10 Um you know, we're just short of showing, you know, putting together full design plans, showing that a real commercial

08:11 - 08:22 Okay. Driveway can be on there. Um but you know, it it is difficult because of you know, proposed and existing driveway spacing that this parcel will have.

08:22 - 08:30 But, you know, it's it's one of those things where again four hundred feet of frontage along this n new northern parcel, proper site distance.

08:30 - 08:39 Um we've seen projects in the past where GDOT will work with us to come up with a solution, but um here we just I think

08:39 - 08:50 for the county's sake and our sake we w we just need GDOT to say they're you know they're willing to provide, you know, and it's possible that a driveway cut can be possible you know, here.

08:51 - 08:55 It doesn't have to be fully designed in my uh from my understanding, right?

08:55 - 08:58 Um, so that's kind of where we're at with GDOT. Um

08:58 - 09:10 at this moment. All right. Thank you. I'll just I'll have one thing to that uh Will piece still on this issue was kinda started from our original requirements from from GDOT and how we had to space our driveway.

09:10 - 09:16 So we had to shift our main access point all the way down to the to the northern part of our parcel which created this issue.

09:17 - 09:23 And us is, you know, we don't own this, you know, to be subdivided land of Bennett Holdings.

09:23 - 09:30 Our client does not own that land. We cannot go spend civil engineering dollars to make a hypothetical site plan because we have no idea what that use is ever gonna be.

09:31 - 09:35 So we're stuck here in in limbo, we're like, well it maybe it will work, we need to see the site plan.

09:35 - 09:42 We're like, there is no site plan, there's no user, we don't it's not our land. So that's just a little bit of color of the circle we we keep going in here.

09:42 - 09:43 Okay.

09:43 - 09:44 Thank you.

09:46 - 09:49 Any other questions, comments from the board?

09:50 - 09:54 What's it gonna take to get this thing crossed the road here?

09:55 - 10:02 I I know Chuck's coming up, but I think it's gonna take Chuck and I having a conversation with DOT individually.

10:02 - 10:13 Um I don't think they're from my experience they're not really treating this particular access fairly, um because our original concept was with the

10:14 - 10:31 the property what would be considered a landlocked piece of property um we had discussed rezoning the portion, uh the remnant piece back to A one um so that it could not end up with a commercial access entrance.

10:31 - 10:40 Um I think if we go back to DOT and say that um that parcel we won't allow that parcel to be developed, period.

10:40 - 10:49 uh and create that as a restriction with this approval um that may satisfy the question and allow this project to move forward.

10:50 - 10:54 The county also has property to the rear of what um

10:55 - 10:58 of what the Azalea project is purchasing.

10:59 - 11:07 We have the water tower site and we have a 30-foot right-of-way that goes into the water tower.

11:07 - 11:17 There may be a potential there for us to allow some type of temporary interim access connection point until this issue's resolved.

11:18 - 11:22 So there's a couple solutions. I just think we have to talk to the right person at DOT

11:22 - 11:27 uh which I haven't had a chance to do yet and I don't think Chuck has had a chance to do yet either.

11:29 - 11:40 But we'll make that happen in the next day or two. Yeah. Well I if you wanna I was gonna give another option, but if uh you want to leave that one as the option that's where I'll I'll give another one.

11:41 - 11:41 You got another one.

11:42 - 11:46 Well I do have another option that this board has the full authority to do.

11:46 - 11:55 Um this board could grant the conditional use for Amazon or excuse me, Project Dazilia.

11:56 - 11:58 God, I'm so sorry.

12:02 - 12:23 And uh moving forward with that, if they gr if you guys grant the conditional use, we can um this board with talking with David uh previously, we had looked at rezoning that parcel, the remnant parcel back to A one.

12:23 - 12:29 State law requires that all properties have access to a public right-of-way.

12:29 - 12:37 That's the state law. That doesn't mean that they have to grant them a commercial curb cut, but they have to give them access.

12:37 - 12:40 GDOT would have to give that parcel access.

12:41 - 12:49 Um I've already set things in motion, uh ordered signs to rezone that remnant parcel back to A1.

12:49 - 12:51 We don't have to do that.

12:52 - 12:52 But um

12:53 - 13:04 This board could approve this conditional use contingent upon that remnant parcel being rezoned back to A1 at the January thirteenth meeting.

13:06 - 13:07 Okay.

13:11 - 13:15 Uh I I appreciate like what Chupp's trying to do there.

13:15 - 13:18 We're th this is what we're talking about, like really working with us here.

13:19 - 13:29 Taking any positive news back to my client would be really helpful at this point, just to be able to say, uh 'cause we've we've been telling them, oh, the county's great, we're gonna figure this out, right?

13:29 - 13:33 And now I'm in New York on Monday and they're yelling at me like

13:33 - 13:38 Is this county great? You know, right? It are in our and and I'm like, I promise we're gonna get this done.

13:38 - 13:48 Something like this would be very helpful to us to where we could at least take some positivity back to them and then try to work this out with the team, right?

13:48 - 13:51 Um over the next, you know, January third. We're not going anywhere.

13:52 - 14:07 You know what I mean? Like we're gonna work with you all, figure this out. And and and Commissioner Crawley, the um that rear water tower stuff, there's some fle if there's flexibility back there, we have some solutions that we've drawn up that we think can work.

14:07 - 14:11 It will even if they're temporary, uh I think that would be helpful too.

14:11 - 14:23 So th there's stuff to talk about, but um I think there's a path forward here and what he uh uh um what Chuck's proposing is super helpful and would at least give me some positivity to take back.

14:23 - 14:24 So

14:24 - 14:26 if you can um consider that. Thank you. Okay.

14:27 - 14:48 So I I think we could probably move forward with approving this conditional use with um a condition of it being zoned, the remnant property being zoned back to A one, and we could also uh include the condition that um that the county would work

14:50 - 14:56 if needed um for access through the property that the county ha retains at the back.

14:57 - 15:09 Um and another condition that the property, the remnant piece will not be developed in any way, shape, or form until all access issues are addressed between the county and DOT.

15:10 - 15:16 I know that's I'm getting the three additional conditions that's we'll do whatever we got to do to move it forward.

15:16 - 15:18 That's what we would like to do.

15:20 - 15:21 Doesn't matter the board administration

15:27 - 15:32 So you said we have property there. What yeah, let me let me see if I can pull that up real quick.

15:33 - 15:35 I'd like to see what that is.

15:51 - 15:59 So deeded access to the current owner for access to remaining acreage or rezoning or rezoning parcel.

16:00 - 16:07 So the remnant piece of property, if you look at the screen where the arrow is pointing, this would be the remnant piece over here.

16:07 - 16:11 When I talk about the property the county owns, the county owns this property here.

16:11 - 16:17 Water tower sits there, and then we have thirty foot that goes all the way out to Brooks Cemetery Road, which is actually off the map.

16:18 - 16:23 Um so this is all county owned, and there could be

16:25 - 16:42 some temporary access granted for this remnant piece to satisfy any requirements DOT may have for this uh commercial drive that's being put in right here.

16:52 - 16:57 I can tell you guys something. So we uh you know thought we had this figured out earlier this week.

16:57 - 17:03 Uh got a phone call yesterday that it was not figured out. And if you kinda look here, really what we would need

17:04 - 17:07 is just that very front edge of that around the water tower makes an L.

17:08 - 17:23 It's four hundred four thousand land feet right there. We think that we can, you know, provide fifty foot up up that thing, but where we run into the issue here with providing this is our van parking in the back gets significantly cut if we if we change that.

17:23 - 17:29 And that obviously you know, I was on the phone for two hours yesterday with with our client talking about how we were around if we try and get more land here.

17:30 - 17:35 If we go get more land then we gotta go get new survey, new title, new geotech, new phase one.

17:35 - 17:47 We're three months back and we're so we can't can't do that. But if we can get a little bit of a little bit of help there, Russell is gonna find a way to rework our detention pond back there to make it work with being a little bit smaller.

17:47 - 17:54 Um but you know, we're not asking to cut right through the middle of the water tower. We understand that. It's really just that corner where that um You talk about right in here.

17:54 - 17:57 Uh the other one on the left there. Yeah, this one this corner right there.

18:02 - 18:08 Yeah, there's a couple of them. And we've we got this yesterday at four o'clock, so we have not uh played with it too much yet.

18:08 - 18:13 But so we recommending a conditional use.

18:14 - 18:17 Is that what Chuck you're recommending?

18:18 - 18:33 Give us give us your uh So what I would do uh uh my if if I were a board member I would recommend that this conditional use be approved contingent upon uh number one and two.

18:34 - 18:38 uh that is on your sheet number three.

18:39 - 18:51 Um you could read number three as is or you could take out the access and just as a board of commissioners are going to rezone the remnant of that parcel back to A one.

18:54 - 19:04 And then there is no access issue to that parcel with it being commercial because now it goes back to A one and

19:06 - 19:11 M Mr. McClure can work with G Dodd on his piece of property.

19:14 - 19:18 You follow what I'm saying? Yeah, but it is still okay to leave both of them in the middle of the year.

19:18 - 19:19 It's still okay to leave both of them.

19:21 - 19:25 The word or is there. But that that cleans this up, ends this.

19:25 - 19:29 We can work in the background with the the applicant on um

19:30 - 19:45 Something that they would be willing to do or what the county and the client would be willing to do to get McClure some access, but if you guys want to do that, that may satisfy their client to the point to where we don't potentially lose that client.

19:46 - 19:46 Okay.

19:48 - 19:51 And it keeps you very much uh in the loop of the law.

19:52 - 19:55 Thank you. Okay. Uh any further discussion?

19:56 - 20:01 All right, no discussion. Like to entertain a motion. I make a motion to recommend approval of the conditional use permit.

20:02 - 20:06 Recommend approved. I'm sorry? Don't recommend that you're approving.

20:09 - 20:13 Um I'm not following you. I make a motion to approve.

20:13 - 20:14 Just say approve.

20:16 - 20:19 Oh, I'm sorry. Yeah, I gotcha. Okay, I make a motion to

20:20 - 20:45 uh approve the conditional use request submitted by SFG Development Services LLC as authorized agent for Bandit Holdings LLC located on a portion of TMP number one twenty five dash zero dash zero zero dash zero twenty seven dash zero and number one twenty six dash zero dash zero zero dash thir zero thirty six dash zero um

20:46 - 20:48 Contingent upon the following as

20:50 - 20:56 part of the conditional use permit. Number one, proof of purchase of property by applicant slash developer.

20:56 - 21:03 Number two, recording of PLAT approval approved by the county and GDOT for the proposal.

21:03 - 21:30 Proposed parcel and number three deeded access to the current owner for access to remaining acreage of TMP number one twenty five dash zero dash zero zero dash zero twenty seven dash zero or the Board of Commissioners to rezone the remaining acreage of TMP number one twenty five dash zero dash zero zero dash zero twenty seven dash zero to A one agricultural

21:30 - 21:36 from L one Light Industrial at the January thirteenth twenty twenty six scheduled meeting

21:38 - 21:44 Okay. So we have a motion. It'll be a second. Second. Any further discussion?

21:45 - 21:48 No discussion. All in favor, let it be known by raising your right hand.

21:49 - 21:51 Thank you, Jim. All right. Thank you very much.

21:54 - 21:57 All right. Down to our business items.

21:58 - 22:04 Uh consideration of a purchase of equipment utilizing SPLOST funding EMS.

22:05 - 22:11 The county currently has um six Lucas devices uh that perform automated CPR.

22:11 - 22:21 Um so we have six devices that were purchased in or excuse me, three of the six were purchased in 2017.

22:21 - 22:24 Uh those were Lucas's two point zeros.

22:25 - 22:32 Uh these units are no longer serv serviceable um as of uh the end of this year.

22:32 - 22:39 Um the county in originally intended to purchase new Lucas devices with SPLOST VIII funds in twenty twenty-seven.

22:39 - 22:52 Uh the vendor striker has come back and said that they have uh Lucas three point one demo units available at a significant cost savings uh for us to be able to replace the three oldest units.

22:52 - 22:56 The replacement cost is $29,280.96.

22:58 - 23:03 And as noted in your staff report, this is 60% below the list price.

23:04 - 23:09 So we recommend using SPLOST VII funds to cover the replacement units.

23:16 - 23:21 The maintenance cost for the next five years will be $23, uh $640.78.

23:24 - 23:24 Okay.

23:25 - 23:26 Thank you.

23:27 - 23:31 And is everybody familiar with what the Lucas device is?

23:32 - 23:33 Okay. All right.

23:33 - 23:37 Okay. Cool. All right. I'd like to entertain a motion, please.

23:37 - 23:48 I make a motion to approve the purchase of three LUCAS devices for the emergency medical service department using SPLOST VII and to make the necessary budget adjustments regarding the same.

23:49 - 23:53 Okay, thank you. Have a motion to second. Second. Have a second. Any discussion?

23:54 - 24:02 So with prepay and do we get a discount or to prepay it or is that just Yeah.

24:02 - 24:06 It gives us a discount on the on the maintenance moving forward. Yes, sir.

24:06 - 24:07 Okay.

24:08 - 24:09 All right. Thank you.

24:10 - 24:12 Any further uh discussion?

24:13 - 24:17 No discussion. All in favor, let it be known by raising your right hand. Right.

24:17 - 24:18 Thank you.

24:20 - 24:26 And John Clemens, thank you for your service to this county for all you guys do and ladies.

24:31 - 24:35 Consideration of an agreement, EMS Medical Director.

24:37 - 24:47 So we've been working to um contract with a new doctor for our uh to act as our county's medical director for EMS.

24:48 - 24:57 Um EMS has has uh identified a local physician, uh Robert Beveridge, uh who's willing to provide that service.

24:57 - 25:01 We've negotiated a salary which will be twenty five hundred dollars per month.

25:01 - 25:08 Um we've been working uh back and forth with him and the county attorneys uh to provide him a contract um

25:09 - 25:16 for those services. Uh the only concern is we need to do this by the end of the year.

25:17 - 25:24 So as I said, we've provided him a contract that was constructed by the county attorney.

25:25 - 25:28 So we would recommend moving forward

25:30 - 25:39 with allowing uh the chairman to execute a contract that meets the county attorney's um standard and Dr. Beveridge.

25:40 - 25:43 Um so that we can move forward with this by the end of the year.

25:44 - 25:44 Okay.

25:46 - 25:50 Like to entertain a motion or questions?

25:51 - 25:53 I have questions. Where is uh

25:55 - 25:58 is he local in in in Greene County?

25:59 - 26:07 Uh I just not heard of him. Yes, he's uh he's an emergency room doctor at our local hospital, correct, John?

26:10 - 26:14 And so and d doesn't he live in Greene County as well? Yes, sir.

26:14 - 26:18 He lives uh these two wingest neighbors so to speak.

26:23 - 26:25 What did he say? He lives out by the way.

26:27 - 26:29 So he uh he does live local.

26:30 - 26:36 And and what would we use him for exactly? I hate to be dumb but I don't know.

26:37 - 26:41 In general the the medical director and John, please come up and elaborate.

26:41 - 26:55 But the medical director um oversees our policies, our operating s uh procedures, also provides uh is the conduit by which we are allowed to provide certain medications or drugs on the units.

26:56 - 27:04 Um so they meet our state requirement for making sure that we're doing the job that we need to do properly.

27:04 - 27:11 under proper medical care. They do not provide, and this is where we've kind of had some of the issues concerning the insurance.

27:12 - 27:15 So ACCG covers medical director.

27:16 - 27:27 Um they do not cover him as a doctor, but he is not providing uh specific um directives for a particular individual or patient.

27:27 - 27:33 They're just providing overall recommendations on how REMS functions.

27:51 - 28:04 So in addition to over medical oversight and making those recommendations, he's also uh being charged with overseeing the CQI, which is our quality of performance-based measures.

28:04 - 28:14 He overlooks any calls that are substantial and makes sure that all the treatment was within our parameters and within legal uh boundaries.

28:14 - 28:18 He also helps design the protocol with the most modern treatment methods available.

28:18 - 28:22 In the past, we've not had this type of insight.

28:23 - 28:27 Um it has been based off recommendations and other medical directors.

28:28 - 28:31 So this this does expand our scope.

28:31 - 28:37 He's also dedicated to continuing training and helping with initial education.

28:38 - 28:47 So with that being said, he'll come in quarterly to perform training and oversee post licensure skills, which is something that is now mandated.

28:47 - 28:51 So post licensure skills are things like ventilator operations.

28:51 - 29:00 uh giving blood in the field and any type of other medication which is not defined directly into

29:01 - 29:11 the state scope of practice so to speak. So with him coming on board anything that he approves that's within legal boundaries is now available to do.

29:12 - 29:14 It provides us with much more clarity

29:15 - 29:24 A better opportunity for training and much better medical care for for all of the citizens and visitors of Greene County.

29:24 - 29:32 It it really does operationally help both EMS and the fire department exponentially to have him available.

29:32 - 29:35 And John the the state requires us to have a medical director.

29:36 - 29:44 Yes, sir. We must have a medical director. We can't practice medicine without a a physician oversight and everything we do goes under his license.

29:44 - 29:49 So it is a a pretty big deal to have the state or the medical directory in place.

29:50 - 29:59 And then Sergeant. Does he review stuff that y'all perform or do and see that the medications and everything were correctly?

30:00 - 30:04 Done. Yes, sir. And at that that is that uh CQI process.

30:04 - 30:14 Um so we review every chart in house, but high acuity calls and things of that nature would instantly go to him and then

30:15 - 30:20 We have instances where we look at something and we say, Well, I'm not quite sure that's right.

30:20 - 30:36 That's not how I would have done it. The protocol on this is questionable and now we're sitting back with two or three other paramedics overviewing and it with a physician's oversight gives much more clarity to that.

30:36 - 30:46 That's kind of the impartial third party with expert knowledge looking at that built in because he doesn't actually give medical care in the field.

30:47 - 30:47 He

30:47 - 30:49 He oversees it.

30:49 - 30:50 All right.

30:50 - 30:56 John, he also has certain state requirements and continue that he has to meet his medical director as well on top of it.

30:56 - 31:02 Absolutely. Um Doctor Beverage has already completed all of these trainings

31:03 - 31:08 uh as an effort to try to be the person to stand in for this job.

31:09 - 31:20 He uh has no intent of ever leaving Greene County. He wants to stay here for all of his life and he's very dedicated to improving the amount of medical care that's available to everyone when they call 911.

31:21 - 31:30 He was very passionate about that in his interview and he has been coming in to trainings that we hold in-house to see how we operate.

31:30 - 31:35 He's overlooked our protocol set to see just kind of what to expect

31:35 - 31:43 as an ER physician when we bring something into him and know the capability of uh the scope so to speak of EMS.

31:44 - 31:48 So he is uh he's been very involved. He's completed all these trainings.

31:48 - 31:52 They do have to complete trainings through the state and they have to maintain those certifications.

31:53 - 32:01 He has to maintain his license he and luckily we were able to find someone who was not family practice but emergency practice as well.

32:02 - 32:05 Thank you. I appreciate that any more questions?

32:06 - 32:06 Thank you so much.

32:09 - 32:12 One other layer to this. Do you mind coming up here, Joe, please?

32:17 - 32:25 One other layer to this is uh you know we're in the pr in the process of applying uh emergency medical dispatch, EMD in our dispatch center.

32:26 - 32:29 He'll actually have an oversight of that as well. He has to sit in on a on a um

32:30 - 32:35 on a group or a committee to make sure that that's done in the proper manner.

32:35 - 32:42 So that's another layer that he's actually we've he's been tasked to in his contract that he will be uh in charge with to do.

32:42 - 32:53 I think another thing to be said is the existing medical director we have did not um finalize the requirements of the state to become a medical director.

32:54 - 32:59 So that kind of put us in a position we had to make a move and do something. So thank you.

32:59 - 33:00 Okay. Thank you.

33:01 - 33:03 Any further questions?

33:06 - 33:09 No further questions. I'd like to entertain a motion, please.

33:10 - 33:26 I'll make a motion to approve professional services agreement between Robert Beveridge, MD, and the county, subject to final review and approval from the county attorney and to make the necessary budget adjustments to fund the contractual label.

33:26 - 33:31 labor of the medical director. Okay. We have a motion leave a second.

33:31 - 33:32 Second.

33:32 - 33:34 Any further discussion?

33:34 - 33:39 No discussion. All in favor, let it be known by raise your right hand. All right. Thank you.

33:41 - 33:50 Consideration of agreements with Walker Church, Liberty, and Greshamville Volunteer Fire Departments for Fire Protection Services.

33:50 - 34:00 As the board's aware, um the county has worked um with the cities of Union Point, Woodville, and Siloam to consolidate fire services.

34:00 - 34:12 Um we've also uh continued negotiations with White Plains and we have kind of a hybrid model uh with the city of Greensboro where we're contracted for fire services.

34:13 - 34:23 We have been uh working uh with the uh remaining um volunteer nonprofit organizations of uh fire departments of Greshamville, Liberty and Walker Church.

34:23 - 34:29 Uh we've had multiple meetings um to discuss consolidation of those departments as well.

34:30 - 34:30 Um

34:31 - 34:41 The agreement that has been provided uh contemplates um full consolidation of those those departments by the end of fiscal year 2027.

34:42 - 34:47 Um you have a copy of each one of the agreements in front of you.

34:47 - 34:57 They are all relatively the same. Um the only difference is uh both Liberty and uh Walker Church have a fireboat.

34:58 - 35:00 Um Greshamville does not.

35:00 - 35:04 Um so that is the only distinct difference between the agreements. Um

35:06 - 35:11 be glad to answer any questions and I know we have some uh individuals to speak on it.

35:12 - 35:13 Mr. Bob.

35:33 - 35:35 Good morning. Good morning, Gary.

35:35 - 35:38 Angela, Jeffery, Dee, Mark.

35:39 - 35:44 The uh the question about consolidation. All of us know it's gonna happen.

35:44 - 35:52 We've been working decades down in uh Walker Church Fire District to get an ISO rating of two.

35:53 - 35:55 When I first started, it was a 10.

35:55 - 35:59 That's a lot of high dollars on your homeowners insurance, guys.

35:59 - 36:02 We just got that in September.

36:03 - 36:13 If we consolidate, like this agreement says, early next year, we just saw what ISO said about two and four.

36:13 - 36:16 They're coming early in 2026 to reevaluate.

36:18 - 36:25 Uh the Greene County Fire Rescue and the ISO ratings of the two cities.

36:25 - 36:29 We don't want to lose that ISO two rating in the Walker Church Fire District.

36:30 - 36:44 We want the people that participated with the fire tax over the years that helped us manage the fire department where we have the equipment necessary to support the ISO two rating, which included those new tankers.

36:44 - 36:47 I know, by the way, I think y'all are buying four tankers.

36:48 - 36:58 And we'd like to see the agreements that we've had every year go on until 2028 as we work toward the consolidation.

36:58 - 37:05 And at the end of 2028, we'd be all one great big fire family.

37:05 - 37:11 Now, there are other things that happen about the volunteer, you gotta realize we're all volunteers.

37:11 - 37:15 We spend our own time and our own money doing a lot of this.

37:17 - 37:20 Some of us, like myself, are getting pretty old.

37:21 - 37:28 And I'd like to see it uh stay like it is for a couple three more years before it's time for me to retire.

37:28 - 37:38 You know, I still can put on an air pack and and uh be stupid running in a burning building if I have to, but I'm getting a little old and so so are some of the other volunteers.

37:38 - 37:41 So it's our recommendation that

37:42 - 37:56 If you look at the wording in that, if we can keep it until twenty twenty eight, uh it'd make all three Liberty Walker Church and Greshamville uh it would satisfy what their argument is right now.

37:57 - 38:05 Now Chief Wiggins and the uh and Joe can come up and talk about the pros and cons because it like David said, we've been in meetings.

38:06 - 38:12 But the big thing is I'd hate to see Walker Church, since we live I since I live down there.

38:12 - 38:28 I'd hate to see us get this ISO two rating in uh just September of last uh this year, and then turn around and lose it next year because ISO is coming in early 2026 to reevaluate the consolidated departments.

38:30 - 38:31 Do we got any questions?

38:32 - 38:34 Uh not at this time. I don't.

38:36 - 38:38 No. Okay.

38:40 - 38:42 That's right now we're good.

38:43 - 38:48 I I have one question. But but we aren't consolidating in early 2026.

38:48 - 38:54 No, my what I was gonna I was gonna uh bring up uh

38:55 - 39:02 The consolidation wouldn't be till October 2027. So the ISO should not be and check correct me if I'm wrong.

39:02 - 39:09 ISO should not be in here in twenty twenty-six because the consolidation is not to twenty twenty seven, correct?

39:09 - 39:09 Right.

39:10 - 39:14 End of twenty twenty seven. Right. So what September thirteenth.

39:14 - 39:19 My understanding is ISO would not come back until we consolidate.

39:20 - 39:22 Everything's consolidated. I guess they have to be notified

39:23 - 39:29 and then they would schedule a time that they would come back, which probably would be in sometime in twenty twenty eight.

39:30 - 39:49 Uh and then you have to wait, I guess, until the it's completed, and then they would send out the new ISO ratings, which would possibly be twenty twenty-eight, probably middle to late twenty twenty eight or even twenty twenty nine.

39:49 - 39:52 I don't think anybody really knows that time frame.

39:52 - 39:58 So yeah, it's not to best of my understanding, they would not be here early twenty twenty-six.

39:59 - 40:07 Well I'm sorry. For for those particular areas. So we um so ISO is generally on a five year rotation.

40:07 - 40:13 Um they came they were here in twenty twenty-four or twenty twenty five.

40:13 - 40:13 Four.

40:14 - 40:21 No, they came they did the evaluation in twenty-four. For them. And we didn't get the scores out until twenty this year.

40:21 - 40:23 They came out in twenty four. They came for us in tw early this year.

40:25 - 40:25 So

40:25 - 40:38 So it's generally a five year rotation. Whenever an event happens, like the county taking over Siloam, uh Woodville and um Union Point, that's gonna trigger a new evaluation.

40:38 - 40:49 So we do expect ISO and conversations with ISO recently in an email we received back from them, they will be coming in sometime next year to evaluate

40:49 - 40:53 those additional areas as part of Greene County Fire.

40:53 - 41:07 With the current contract that we have in place, they would not be evaluating uh the fire districts Regressionville, Liberty, and Walker Church because they weren't they will not be consolidated under Greene County Fire at that time.

41:07 - 41:13 So as Gary was saying, I I would think that you would not see ISO come back in um

41:14 - 41:24 If the if we consolidated with the volunteer departments in late 27, they wouldn't be back in here till 2028 to re-evaluate.

41:27 - 41:31 So you think that's different? I think we ought to wait one more year if we can get it.

41:32 - 41:39 No, I'm saying you don't think they're gonna re you think they're gonna re-evaluate y'all in twenty-six.

41:39 - 41:46 No. Not with the cock current contract. Until you till we consolidate, they won't come back in w whoever the department is.

41:47 - 41:47 Okay.

41:48 - 41:54 The three nonprofit volunteer departments, you have to realize is the they're volunteers now.

41:54 - 42:00 There's people who put in a lot of time and effort. And we have a pretty much a consensus between the three departments.

42:00 - 42:03 Now, the downside of that, like I said, a lot of us are getting old.

42:04 - 42:08 We consolidate I'm gonna give you an example here, and I can only speak for Walker Church.

42:08 - 42:14 We consolidate on this two year agreement, all of a sudden every volunteer we got retires or quits.

42:14 - 42:18 But you got a station full of equipment with nobody to drive the equipment.

42:18 - 42:19 Why would they retire?

42:20 - 42:31 Because they feel like that they haven't been able that the people in our district have not been able to enjoy the fact that they've worked so hard over these years to get it to a two.

42:31 - 42:38 Now I've been there for over two decades. I know, and I happen to be the treasurer, so I know where how hard we've been working.

42:40 - 42:54 And uh they're getting older. They plan on retiring in three to five years anyway, and they'd like to see the ISO two rating enjoyed for three more years and they'd have no problem why three, why not five?

42:55 - 42:56 I mean why exactly three years?

42:57 - 43:00 Because they compromise from five to three.

43:02 - 43:06 You know, we expected ISO to come back in in twenty thirty.

43:06 - 43:11 Based on what had happened here. I've seen four of these, three of these things now.

43:11 - 43:16 And uh it's usually about a five like David said, about a five year rotation.

43:17 - 43:21 And I'd hate to see the problem is when you c consolidate

43:22 - 43:30 I've been told, I don't know this for a fact now, you consolidate with Greene County Fire Rescue, Greene County Fire Rescue's ISO ratings are three

43:31 - 43:32 today.

43:33 - 43:38 They come back and reevaluate with two and four. Maybe the three will go up to a four or five.

43:38 - 43:43 Now you're talking about a significant change when when Walker Church

43:44 - 43:49 consolidates. And that's what the the big thing is they're just worried about

43:50 - 44:01 Folks down there have paid the the fire tax for as long as I've been here, and we were able to get this too, and we want to keep the two for as long as we can.

44:02 - 44:09 And if you know I just I think you probably see our frustration that we were pushed in this direction for years.

44:09 - 44:14 I and now all of a sudden the brakes got put off. I've been part of it, Angela, I know.

44:15 - 44:23 And I understand the frustration, but I thought it was a decent compromise from t t twenty thirty to twenty twenty-eight anyway.

44:23 - 44:27 And it's just a one-year extension on this contract where all of us can agree.

44:27 - 44:31 Look, we want everybody to have the best fire service we can got. And I'm gonna tell you something.

44:31 - 44:37 With the new paid departments and the way Chief Wiggins and stuff that they're doing things, they're doing things a hell of a lot.

44:37 - 44:40 That's unbelievable. I mean it they're fantastic.

44:41 - 44:46 And that's a and Joe's involved in it too, so I'll do him stroke as well.

44:47 - 44:56 But you know, uh all we want to see is a one year go to go to twenty twenty eight and you could probably get 'em to sign this agreement next week.

44:57 - 45:01 Well the contract runs out into this uh gotta have a contract this year.

45:02 - 45:07 So at uh if there's not a contract in place, then my understanding is

45:08 - 45:13 they would not be able to go out into the county We lose our certification.

45:14 - 45:16 Yeah. Yeah, they'd lose their certification.

45:19 - 45:22 To 2027 instead of 2026.

45:24 - 45:29 Yeah, I I I think some people on the board probably felt that it would be 2026.

45:30 - 45:30 Yeah.

45:32 - 45:39 So But if we you know if we reach the agreement to 2028, then we don't have to have this discussion every year either.

45:40 - 45:48 And we would work, I have been told we would work hard toward getting the consol everything that we need to consolidate in line.

45:48 - 45:51 That includes the budget request every year as well.

45:55 - 45:55 Okay.

45:56 - 45:59 Thank you. Any further questions?

46:00 - 46:00 Okay.

46:03 - 46:05 Any comments, questions from the board?

46:09 - 46:15 Well, I I I will tell you how I feel. I would like to see the motion made.

46:16 - 46:31 for the contract that we've been presented uh through for October uh twenty twenty seven, the consolidation of the volunteer departments under Greene County Fire and Rescue.

46:31 - 46:44 Uh and I would like to think in this next year and a half that we will all work toward the same common goal and that's provide the best fire protection that we can to the citizens of this county, regardless of where you live.

46:45 - 46:45 Uh

46:46 - 46:48 That's that's my desire.

46:48 - 46:54 Uh and open for any comment from the board before I call for a vote.

46:55 - 46:56 I agree.

46:57 - 46:59 All right. I'd like to entertain a motion, please.

47:01 - 47:12 I make a motion to approve the agreements as presented with Greshamville Fire Department Inc., Liberty Volunteer Department Inc., and the Walker Church Community Volunteer Firefighters Association.

47:13 - 47:15 All right, we have a motion, need a second.

47:16 - 47:16 Second.

47:17 - 47:18 I'm second. Any discussion?

47:20 - 47:23 No discussion. All in favor, let it be number. Raise your right hand.

47:23 - 47:25 All right. Thank you.

47:26 - 47:30 Commissioner Reports. Commissioner Deering. Nothing today. Commissioner Smith.

47:30 - 47:32 Wishing everybody a Merry Christmas.

47:33 - 47:37 Merry Christmas. Uh Commissioner Lindsey? Yeah. Merry Christmas again.

47:37 - 47:41 And and thanks to all these nice gentlemen in the back of the room back here for all you do.

47:41 - 47:43 Okay. And ladies, excuse me.

47:44 - 47:46 Commissioner Blanton?

47:46 - 47:56 Merry Christmas. Okay. All right, with that, uh Chief, Joe, uh, Mr. Bob, John, everyone here, uh, thank you so much for being here.

47:56 - 48:00 Thank you for all you do. And with that, this meeting is adjourned. Thank you.