00:00 - 00:02 Playage followed by the invocation, please.

00:13 - 00:16 Our nation, and individual.

00:19 - 00:20 Let us pray.

00:21 - 00:26 Heavenly Father, we come to you today thanking you for the blessings that you have given to us, Father.

00:26 - 00:27 We thank you for life.

00:27 - 00:31 Father, I thank you for each person that is represented here.

00:31 - 00:35 Father, for each commissioner who gives them their time, service back to this county.

00:35 - 00:41 Father, I thank you. Father, we thank you for the rain that you've blessed us with so much here lately.

00:41 - 00:49 Father God, we know that uh you know what we need. And Father, I just pray that this meeting would be pleasing in your sight, and we ask your blessings upon it.

00:49 - 00:52 In Jesus' name we pray. Amen. Amen.

00:55 - 00:58 About July, August we'll be wishing we could get a little bit of rain.

00:59 - 01:00 Yeah, saving in a bucket.

01:04 - 01:07 All right, go ahead and call the meeting to order.

01:08 - 01:14 Let the minutes reflect that all commissioners are present with the uh exception of Commissioner Deering.

01:16 - 01:23 And if you would take a few moments look at the minutes from the April twenty twenty five regular monthly meeting

01:24 - 01:27 And the April 22, 2025 called meeting.

01:27 - 01:30 And then I would like to entertain a motion, please.

01:36 - 01:46 I make a motion to approve the minutes from the April 2025 regular monthly meeting and the April 22nd, 2025 call meeting.

01:46 - 01:47 Okay.

01:47 - 01:51 We have a motion. Uh second. A second. All right, have a second.

01:51 - 01:53 Any discussion?

01:55 - 01:58 No discussion. All in favor, let it be known by raising your right hand.

01:59 - 01:59 Okay.

02:00 - 02:01 Thank you.

02:05 - 02:12 Under zoning and subdivision items, consideration of a conditional use request, Sidney Alexander.

02:13 - 02:20 As representative for the Glen at Lake Oconee Village, owned by VTR, the Glen LLC.

02:23 - 02:23 Okay.

02:24 - 02:28 The applicant seeks conditional use approval for a convalescent home senior living community.

02:28 - 02:41 The twelve point five acre site is located at ten seventy Old Salem Road, is zoned CPUD, and has been in operation as a convalescent home senior living community since twenty seventeen under previous ownership.

02:41 - 02:44 The conditional use approval is required due to new ownership.

02:44 - 02:48 Planning and zoning commission reviewed the request, held a public hearing, and voted to recommend approval.

02:49 - 02:50 Okay. Thank you.

02:51 - 02:54 I'd like to entertain a motion, please.

02:58 - 03:10 I make a motion to approve the conditional use request submitted by Sidney Alexander as representative for The Glen at Lake Oconee Village, owned by VTR The Glen, LLC.

03:11 - 03:24 For the 12.5 acre parcel identify this tax map and parcel number 05700013A to operate as a convalescent home senior living community.

03:25 - 03:28 Okay. Thank you. We have a motion. We need a second.

03:28 - 03:36 I second it. Right. Have a second. And this is this is only being done this could uh conditional use approval is just due to the new ownership.

03:36 - 03:40 That's the only right. Conditional use does not follow. Correct.

03:41 - 03:41 Okay. All right.

03:42 - 03:46 Any discussion? No. Okay. No further discussion.

03:46 - 03:48 All in favor, let me know by raising your right hand.

03:49 - 03:50 All right. Thank you.

03:56 - 04:06 On our business items, consideration of a road name change, Meadowcrest to Towne Center Parkway.

04:10 - 04:15 Um the city of Greensboro has renamed portions of Meadowcrest Road within the city limits to Towne Center Parkway.

04:16 - 04:26 In order to maintain continuity with our addressing and prevent issues with our public safety responses, the county needs to consider renaming the portions of Meadowcrest Road within the unincorporated areas as well.

04:26 - 04:27 Okay.

04:28 - 04:30 Thank you. Like to entertain a motion, please.

04:33 - 04:43 I'll make a motion to change the name of Meadowcrest Road to Towne Center Parkway to encompass the area from the city limits of Greensboro to Walker Church Road.

04:43 - 04:44 Okay, we have a motion.

04:46 - 04:48 Second. Have a second in discussion.

04:49 - 04:54 And the way this road is now, part of it's in the city, then it goes into the county.

04:54 - 04:59 I think then it goes back into the city and then it goes back into the county. So this will make it all uniform now.

05:01 - 05:03 All right, any further discussion?

05:04 - 05:08 No discussion. All in favor, let me know but raise your right hand.

05:09 - 05:10 Okay, thank you.

05:24 - 05:24 Okay.

05:25 - 05:31 Consideration of a resolution authorizing a project to develop a fire training facility.

05:32 - 05:37 And I believe we have a couple of people that have signed up to speak.

05:37 - 05:39 Uh Chief Wiggins.

05:48 - 05:49 Good afternoon or evening.

05:50 - 06:00 Chairman Usry and the Board of Commissioners. Uh thank you for giving me a few minutes to this afternoon to speak about this exciting and hopefully important step forward for Greene County Fire Rescue and the proposed GCFR training facility.

06:00 - 06:05 Our department is built on a foundation of dedication, professionalism, and skill. Greene County Fire Rescue is second to none.

06:05 - 06:07 Our firefighters are are the best.

06:08 - 06:15 They're in it for the job, they're not in it for the paycheck. You know, that they're passionate, they care about what they do, and I promise you they're who you want when they when you have an emergency.

06:15 - 06:20 No one joins the Greene County Fire Rescue without the mission of ensuring that citizens' safety is our highest priority.

06:20 - 06:29 We truly believe in that. They don't b take that oath, they don't join our department. That means they're showing up every day prepared to do whatever it takes to serve and protect and respond effectively to an emergency.

06:29 - 06:36 As our community continues to grow, so does the demand placed on firefighters to meet these increasing demands and continue providing the highest level of service.

06:36 - 06:43 We must invest in a modern hands-on training that reflects the complex real world challenges that our team faces every day.

06:43 - 06:54 In early April we began began developing this proposal, carefully designing the facility, the optimal location, the integrating realistic training topics and uh scenarios.

06:54 - 06:57 It's been challenging, a very short period of time, but it's been also rewarding.

06:58 - 07:04 Our comp uh once complete, this training complex will become the cornerstone of our department's ongoing efforts to strengthen our skills, readiness, and safety.

07:05 - 07:09 During our research, we've identified three companies, uh Forged Fire and Company is one that we looked at the most.

07:09 - 07:14 That's the one I'll kind of briefly talk about today on some of the enhanced uh training uh that we have.

07:14 - 07:18 So I traveled to Columbus. They don't have any facilities in the state of Georgia right now.

07:18 - 07:22 They're up around the Virginia's and Carolinas and Carol uh Virginia, Carolinas, and Ohio.

07:23 - 07:27 Um so I went and visited them. I traveled to them because again I want to make sure we see what it looks like.

07:27 - 07:30 So they had a turnkey project in Grove City, Ohio.

07:30 - 07:37 And definitely their passion for training, their care for training, their attention to detail obviously matches our training and what we're looking for.

07:37 - 07:41 Two other training complexes, well, two other training companies that work in the state.

07:41 - 07:46 I visited theirs and these don't fit where what our needs are. They really don't.

07:46 - 07:49 And also they're pricier than the company that's in uh Columbus.

07:50 - 07:59 So the new training complex is a will be a true game changer for us. These are some of the items that will change and enhance our training for what we have currently, which is at Station 8 on Walker Church.

07:59 - 08:09 We'll have live burn rooms on three different floors. So on first, second, and third division of the burn building, we'll have burn rooms, which enhances us with ever-growing changes and of our large complexes in our in our county.

08:10 - 08:17 Hose managements and search drill spaces, forcible entry in three different um locations of the building that's built into the burn building.

08:17 - 08:23 Uh ladder operation and ventilation training top props from flat roof to pitched roof, different type scenarios.

08:23 - 08:28 It has a full standpipe in it with fire department connections for us to pump to and get drills out of as well.

08:29 - 08:34 Ventinor search drills with right doors that shut and operate and not simulations.

08:34 - 08:41 Rope rescue training to include repelling, vertical rope pickoffs for our personnel as we also do rope rescue inside of Greene County Fire Rescue.

08:42 - 08:47 Confined space rescue as well inside the burn building. Simulated apartment, commercial, and garage fire scenarios.

08:47 - 08:53 And these are just a few of the things that will be enhanced on what we have currently, right? So it's gonna just take us to a new level where we're going.

08:54 - 09:01 Also strategically located in the center of Greene County at 1180 C Weldon, the training facility will allow us to conduct more advanced scenarios with lower impact on responses.

09:01 - 09:09 We're not further south of the county, more centrally located. It'll also serve a hub for multi-company drills, interagency collaboration, and continuous professional development.

09:09 - 09:13 Enhanced firefighter safety and improvement service service delivery to the public is our goal.

09:13 - 09:20 With support we hope to break ground soon. If everything goes well within a year, we're in the new training facility located over there.

09:20 - 09:26 And again, we're just excited about this, but it brings just a whole new atmosphere and enhanced training for our department.

09:28 - 09:33 Or y'all have questions here. I don't know how this works. So where is it good where is it gonna be located exactly?

09:33 - 09:37 Will you come down the path that goes to the fire station now?

09:37 - 09:41 When you take a left to go to Esso, the piece of property back to your left.

09:42 - 09:43 So it basically animal control.

09:44 - 09:48 And nine one one? Yes. Okay. And it backs up to the wire place up there.

09:48 - 09:52 And we need two acres and we're right at two acres. And we've checked with ISO to get the full benefit of it.

09:53 - 09:54 We've checked that as well.

09:54 - 10:02 Okay. So that so there's a cut through road, so it will be up between okay between that easement and the nine one one sheriff's department.

10:03 - 10:06 Okay. Because I rode by there yesterday to look at it. Yes, sir.

10:06 - 10:10 Accessible from Kevin Roberts way as well or not? I don't think it will be. Okay.

10:10 - 10:16 I don't think it will be. Was that cut through? Now it will be through the SO side, but when the inmates are in, my understanding is that gate's gotta stay shut.

10:16 - 10:19 So we won't be cutting through there. All right. Thank you.

10:21 - 10:24 Chief, thank you. Thank you all very much. Appreciate it. Yes, sir.

10:27 - 10:28 Mr. Broadbent?

10:30 - 10:37 Thank you, Chairman Usry. Yes, sir. So I'm here in support of uh investing in the fire training center.

10:37 - 10:45 Chief Usry, uh sorry, Chief Wiggins spoke about uh safety and readiness, and I'd like to see you expand that investment beyond what he just spoke about.

10:46 - 10:52 Uh as you probably know, the paid in the paid stations are the new fire engines, we only have two firefighters on each engine.

10:52 - 10:56 There are two standards according to the National Fire Protection Association.

10:56 - 11:05 That govern staffing. One is Standard 1710, which impacts paid fire departments, and 1720, which is volunteer fire departments.

11:05 - 11:13 Uh 1720 is really based on uh population density, distance traveled, and a few other factors.

11:13 - 11:21 But I think in the paid stations we've got station 10, I'll highlight just where where I live, uh inside rentals.

11:21 - 11:23 We only have two paid firefighters there right now.

11:24 - 11:28 We're too short of what standard 1710 says we should have.

11:28 - 11:36 And let me get, you know, I will defer to the expertise in the back of the room with Chief Wiggins, Joe Bashore, and you know, other paid firefighters.

11:36 - 11:41 But here's my concern. Let's say 911 gets a call of a residential structure of fire.

11:42 - 11:52 First engine shows up, they've got two firefighters. That let's assume that call was called in by a pass somebody passing by or a neighbor and not by somebody inside the house.

11:52 - 11:55 So, what's the first thing the firefighters have to do?

11:55 - 12:00 Do a search of the house, you know, assuming it's possible, to make sure there's nobody inside.

12:00 - 12:06 But with two firefighters, they both you can't send one person in alone, they always have to go in in pairs.

12:06 - 12:11 So they go in in a pair, there's nobody outside to uh you know monitor it for safety.

12:12 - 12:20 Plus there's nobody outside to start deploying equipment, hooking up water supplies, deploying hoses, ground ladders, whatever you might need, you know, from the fire engine.

12:21 - 12:32 You know, to me, you know, we purchase these great new eight hundred thousand dollar fire engines, but they're nest not staffed properly, you know, to take advantage of um their full capabilities.

12:32 - 12:39 And I think the National Fire Protection Association standards, particularly standard 1710 for paid firefighters, is very clear.

12:39 - 12:43 And I think, well, you know, perhaps we can't get to four immediately.

12:43 - 12:50 I'd like to see this commission strongly consider at least getting to three on each fire engine.

12:50 - 12:52 Something that that uh the that um

12:53 - 13:04 County manager uh Lombard told me when we had the same discussion last year is that our stations don't support more than two firefighters, which I don't really understand why not.

13:04 - 13:17 Um but I think this needs to be an area where the the Board of Commissioners, Chief Wiggins, Joe Bashore, really need to start looking at um so we can have additional firefighters, improve that readiness and safety factor chief.

13:17 - 13:21 We can just talk talk to that. So I appreciate your consideration. Thank you.

13:21 - 13:22 Thank you, Mr. Broadbent. Thank you.

13:25 - 13:25 Um

13:26 - 13:27 Is it the time to ask your question or not?

13:28 - 13:42 Sure, go ahead. Uh yeah, my question would be since you brought it up uh about the paid firefighters, is there any stipulation or uh differentiation uh where you you have volunteer firefighters that might fill that void or not?

13:42 - 13:51 Can someone answer that one for me please? Um currently in our department the the volunteers we have in Greene County Fire School are support members.

13:51 - 13:56 They can't fill the void, but on initial response that takes three volunteers to count the one paid firefighter.

13:57 - 13:58 Understand. Okay.

13:58 - 13:58 Thank you.

13:59 - 14:08 I think the concern expressed by you know Byron Lombard is the volunteers' response, you know, continues to dwindle over time.

14:08 - 14:09 Yeah, absolutely.

14:14 - 14:22 Yeah, I I understand that and I appreciate that and I understand that uh you know that's that's that's an ongoing issue and it's only probably only gonna get worse.

14:22 - 14:26 Uh but uh I guess my concern was was there any um

14:28 - 14:38 Change in their stipulation based on the availability of volunteers or or the requirement of four versus two.

14:41 - 14:41 Okay.

14:42 - 14:47 Anything else? That's it. Okay. Right. So we've heard from uh the chief.

14:47 - 14:52 We've heard from uh Mr. Broadbent. I would like to uh entertain a motion please.

14:53 - 15:06 I make a motion to approve resolution number 2025-05-13A, approving the fire rescue training complex known as REDI, REDDY, drill yard.

15:07 - 15:12 along with any necessary budget adjustments and to waive the reading of the resolution.

15:12 - 15:15 Okay, we have a motion on the floor and need a second.

15:16 - 15:20 Second. All right, we have a second. Uh any discussion?

15:20 - 15:32 Um I I I would like to say, although we did waive the resolution reading of the resolution, I would like to say that um this much uh as far as part of the resolution goes um

15:35 - 15:46 Down middle way. It says whereas county code 2022-4 prohibits naming buildings after individuals, whereas the board has the authority to determine the name of any new county facility.

15:46 - 15:51 Now therefore, be it resolved by the Board of Commissioners of Greene County, Georgia, as follows.

15:52 - 15:59 The project to build the fire rescue training complex is approved in an estimated amount of one million seventy-one thousand three hundred dollars.

16:00 - 16:05 Be funded from the prior year fund balance of the unincorporated services fund.

16:05 - 16:26 And number two, that the fire service training complex be named REDDY Drill Yard as a way to honor the sacrifice of Battalion Chief Chris Eddy while instilling the values he championed to all firefighters that use this facility, including the pursuit of excellence, to embrace challenges,

16:26 - 16:31 to quote unquote do it right, and to always be ready.

16:32 - 16:33 Okay. Thank you.

16:33 - 16:37 So we have a motion and a second in discussion.

16:39 - 16:42 Okay, no discussion. All in favor let me known by raising your right hand.

16:43 - 16:44 All right. Thank you.

16:51 - 16:55 Consideration of an appointment to the planning and zoning board.

16:56 - 17:01 Al Brinkman's term on the planning and zoning commission expires June 1st, 2025.

17:01 - 17:07 The position is designated for a resident from District 1 and requires formal action by the BOC to appoint a replacement.

17:08 - 17:12 Mr. Brinkman has expressed his willingness to continue serving if so desired by the board.

17:12 - 17:21 There was one additional application that was included in your packets, and we received an additional one today, but it actually is for a different district, so it did not qualify.

17:22 - 17:23 Okay. Thank you.

17:24 - 17:26 Like to entertain a motion, please.

17:28 - 17:43 I'll make a motion to appoint Al Brinkman as the District 1 representative on the Greene County Planning and Zoning Board for a three-year term beginning June 2nd, 2025, and ending June 1, 2028.

17:44 - 17:46 Okay. We have a motion, Mr. Second. Second.

17:47 - 17:47 Discussion?

17:50 - 17:53 No discussion. All in favor that be known by raise your right hand.

17:54 - 17:54 Okay.

17:54 - 17:55 Thank you.

17:59 - 18:04 Consideration of an appointment to the Board of Tax Assessors.

18:06 - 18:11 Rod Wilson's term on the Board of Tax Assessors expires May 31st, 2025.

18:11 - 18:17 Uh Jim Couch's term on the Board of Tax Assessors expires on July 31st, 2025.

18:18 - 18:25 Mr. Wilson and Mr. Couch have both been active members of the Board of Tax Assessors, have maintained the required training, and have agreed to serve another term.

18:26 - 18:29 The appointment requires formal action by the board to appoint a replacement.

18:30 - 18:35 Mr. Wilson and Mr. Couch have both expressed their willingness to continue serving if so desired by the board.

18:35 - 18:39 Once again there was one other applicant that's included in your brackets. Okay.

18:39 - 18:42 Thank you. I'd like to entertain a motion, please.

18:43 - 19:04 I make a motion to appoint Rod Wilson to the Greene County Board of Tax Assessors for a three-year term beginning June 1st, 2025 through May 31st, 2028, and to appoint Jim Couch to the Greene County Board of Tax Assessors for a three-year term beginning August 1st, 2025 through July 31st,

19:04 - 19:08 2028. Okay. Thank you. We have a motion. We have a second.

19:08 - 19:09 I'll second it.

19:10 - 19:10 Second. Any discussion?

19:13 - 19:16 No discussion. All in favor, let me know by raising your right hand.

19:17 - 19:18 Thank you.

19:20 - 19:26 Consideration of an appointment to the Department of Family and Children's Services Advisory Board.

19:27 - 19:34 Joan Antone's term on the Department of Family and Children's Services Advisory Board expires June 30th, 2025.

19:34 - 19:38 Miss Antone is willing to serve another term if desired by the board.

19:38 - 19:46 State law prescribes certain eligibility requirements for serving on this board, so anyone appointed will need to satisfy the eligibility requirements.

19:46 - 19:54 The local director for DFCS has indicated that Miss Antone has been an active member of the DFCS board and meets the requirements of the law.

19:54 - 19:55 Okay.

19:56 - 19:58 Like to entertain a motion, please.

19:59 - 20:14 I make a motion to appoint Joan Antone to the Greene County Department of Family and Children's Services Advisory Board for a five-year term beginning July 1, 2025 through June 30th, 2028.

20:14 - 20:14 Okay.

20:15 - 20:17 Thank you. We have a motion. We need a second.

20:18 - 20:18 I'll second it.

20:19 - 20:20 Second. Any discussion?

20:22 - 20:28 None other than her and Nicholas have been active members of the community for a long time.

20:29 - 20:29 Decades.

20:30 - 20:31 Yes, sir.

20:32 - 20:36 All right, no further discussion. All in favor, let me know I'm gonna raise your right hand.

20:37 - 20:38 Okay, thank you.

20:43 - 20:48 Consideration of a GDOT roundabout support letter.

20:48 - 20:58 GDOT is requesting a roundabout support letter noting that the county will be responsible for lighting slash energizing the roundabouts that are being included as part of the Highway 44 widening project.

20:58 - 21:03 The annual cost to the county per roundabout is approximately fifty-five hundred dollars.

21:03 - 21:09 The roundabouts include those at Merchant Street, Linger Longer Road, Carriage Lane, Airabella Boulevard.

21:09 - 21:22 Carey Station and Richland Connector. GDOT notes that there is still uncertainty regarding the carriage lane Airabella Boulevard roundabout, but it is easier to include this roundabout in the original plans and pull out later versus trying to add it back at a later date.

21:22 - 21:26 Okay. Thank you. And I believe Miss Uh Annette.

21:35 - 21:36 Good evening. How are you?

21:38 - 21:55 Let me just say that since I've been I've only been here for five years in the county, but the two issues that make people crazy here on any given day is either Piedmont Water and the second one is the widening of forty four.

21:55 - 21:59 I mean it just makes them nuts when you when you're out there.

21:59 - 22:00 So I read through the agreements

22:01 - 22:07 that we have in there. Here's my here's my issue with them. We're making agreements for what we don't know.

22:08 - 22:20 Okay, so if I say there's going to be a roundabout, first of all the general public does not know that Airabella has decided to ask for a roundabout out front.

22:20 - 22:24 So once they find out, their hair is going to be on fire.

22:24 - 22:32 Absolutely on fire 'cause they're gonna think about going a roundabout around CBS and then going fifty feet and doing another roundabout.

22:32 - 22:40 That roundabout is better placed if they have to have one on Linger Longer Road and that's not been part of the consideration whatsoever.

22:40 - 22:47 Because Linger Longer Road is another entrance for them and there are some issues on Linger Longer that that would solve if it was over there.

22:47 - 22:52 and you didn't have to go through two roundabouts. Let me stop you. Linger Longer Road, where are you talking about?

22:52 - 22:57 If you go down a Linger Longer Road to where their sales center is, that's their other entrance.

22:57 - 22:58 It's over there.

22:59 - 23:03 So they have an entrance. They have two entrances, one on Linger Longer Road and one on Airabella.

23:03 - 23:08 You're talking about okay. Uh you're talking about Airabella. Yes, Airabella. Okay, I'll stop talking about it.

23:08 - 23:14 Yeah, no, no, no. Airabella has requested the roundabout. So my point is Airabella's got two entrances.

23:14 - 23:17 It probably would be better served on Linger Longer, but

23:17 - 23:23 The general public doesn't know that Linger Longer has um that Airabella has requested something.

23:23 - 23:35 And so when they figure it out, because we don't have a lot of interface with the public right now about that 44 expansion, they've had briefings, but the plan has changed somewhat, especially when you add another roundabout.

23:35 - 23:40 And we haven't talked to the public about that roundabout, so their hair is going to be on fire.

23:40 - 23:51 So I'm just saying to avoid what we did last meeting, there is a communication plan that needs to happen here before everybody's hair gets on fire and they think that they're gonna have another roundabout.

23:51 - 23:58 And my question, and I know we can't ask questions, do we ask them to consider want to on Linger Longer instead of on Highway 44?

23:58 - 24:02 Because the secondary question from that, if you put it on 44

24:02 - 24:11 The current plan for 44 has um right turns, right turns, right turns, and then you're gonna do a U turn to make the left.

24:11 - 24:24 So in conjunction with Del Webb or the hospital or the landing or anything through there, w are the right turns gonna stay in place when you get a roundabout, an additional roundabout, and if that's the case

24:25 - 24:29 Um, then you're gonna be in roundabout and another turn and another turn.

24:29 - 24:34 Or is everybody gonna have to, based on a new roundabout, have to go to the roundabout to do the turn?

24:35 - 24:38 We don't know the answer to that, and yet we're gonna sign a support letter.

24:39 - 24:44 So I'm like, okay, if we have the answers to that, great, let's communicate it to the public.

24:44 - 24:50 If we don't have the answer to that, we might want to ask that question is will it affect those right hand turns at all?

24:50 - 24:54 We still don't know about the widening of forty four how to get across the street.

24:55 - 24:59 There's we're gonna have walk lanes on both sides and there's no way to get across the street.

24:59 - 25:07 So there's still a lot of unknown going on here um with forty four in that corridor and there's going to be a lot of these roundabouts.

25:07 - 25:13 So the secondary part of that is you're gonna talk about the maintenance of those roundabouts and here's the thing.

25:13 - 25:16 We're gonna agree to maintain them but we don't know what they look like.

25:17 - 25:22 Because in that area, since you're in the south end of the county, you're gonna want a very specific look to that.

25:22 - 25:35 They all are gonna have to match. You wanna be able to pick out the light poles, you want water, you want lights, and you want a certain landscape plan, and the landscape plan you should see if you're gonna agree to

25:35 - 25:47 pay for it and you haven't seen a landscape plan. So my suggestion for that is if you're going to maintain 'em, I get we have to maintain them, but w shouldn't we know exactly what they look like when we agree to maintain them?

25:47 - 25:55 And I'm sure that they haven't furnished those or they're leaving it up to the county to go get the landscape plan and the designs and we haven't seen those either.

25:56 - 25:56 So

25:57 - 26:06 Word of caution. Um I'm just recommending that number one ask the question, can they put that roundabout on along the road?

26:06 - 26:24 Number two, um, before we go through this support and agree to anything, even though I know they can remove it, we might want to tell the public what we're doing in a broader sense in a communication plan so that we don't have the kind of upset that I expect that you'll get when we make changes to the 44 Widening Plan.

26:25 - 26:25 Thanks.

26:26 - 26:27 Thanks, Mm.

26:28 - 26:28 Okay.

26:29 - 26:33 Can can we address a couple of things she's brought up?

26:34 - 26:34 Sure.

26:35 - 26:45 Uh one of them is what you brought up, Miss Annette, was the support, the only support we're offering is for the lighting.

26:46 - 26:48 That's what this support is.

26:49 - 26:58 They've t we have met and they have told us and we have to express the exact concerns you had.

26:59 - 27:03 Uh but here's the question I have.

27:03 - 27:09 About two or three months ago, Air Bellet came in with a letter to the county asking you guys to sign it.

27:10 - 27:13 And at the time everybody was surprised by that letter. Like, what the heck?

27:13 - 27:20 We don't know anything about this. You guys are gonna meet with the DOT in order to find out what that was all about.

27:20 - 27:24 So I asked Byron uh follow up with me and I didn't hear from Byron.

27:24 - 27:28 So I finally uh I don't know whether or not that meeting occurred.

27:28 - 27:33 Because you didn't have to sign the initial support letter. You could have said no to ARL and you have the right to say no to L.

27:34 - 27:39 So I don't know whether or not that support letter has been signed. Or it's part of

27:40 - 27:42 whether they're a particular thing.

27:42 - 27:45 But I don't know what happened to that process.

27:51 - 27:57 I I'm still a little bit confused here. We have we have two different proposals on the agenda here.

27:57 - 28:02 One is for the maintenance of the lighting, one is for the maintenance of the landscaping.

28:02 - 28:07 You're addressing both of those or one of those? I would say those both of you are.

28:09 - 28:12 That's that's that's what I that's what I thought. Okay.

28:12 - 28:19 So um w without a plan in front of me, I don't see where there has been an approval

28:20 - 28:28 for a roundabout at on 44 for Airabella uh specifically and where it would be located.

28:29 - 28:36 I can't imagine uh GDOT doing two roundabouts uh you know less than a hundred feet apart or whatever it is.

28:36 - 28:45 Yeah but that's what they that's what they sent. They sent the letter this has been two or three months ago and it came before you guys once before and everybody was surprised by that.

28:45 - 28:45 It wasn't

28:45 - 29:11 last meeting it was the meeting before that they had sent a letter in Airabella the developers get to send the letter that's how we ended up with on the you know on the original connector who was surprised and but anyway um they sent a letter into the county asking Airabella sent it to the state the state sent it to the county the county has to say yes or no because remember two meetings ago people have to be surprised by the letter too and the

29:11 - 29:16 commitment was we're gonna we're gonna have to meet with the DOT because we don't know what this is all about.

29:16 - 29:17 So I said okay.

29:18 - 29:18 So

29:19 - 29:26 Again, in the motion we're saying that the roundabout at in front of Airabella can always be taken off.

29:26 - 29:31 So apparently it's on the plan, but we don't know the status of that.

29:31 - 29:34 So yeah, and we did meet with DOT.

29:35 - 29:39 Yeah, we met with uh DOT uh to discuss

29:40 - 29:42 the roundabouts. And

29:43 - 29:52 th they said it like the she stated, it is easier to go ahead and put it in there and take it out than to leave it out and try to put it back in.

29:52 - 29:58 Uh, 'cause there was about four or five people with DOT that that were here at that meeting.

29:58 - 30:02 So we did have that discussion. They also gave us a couple of examples.

30:02 - 30:06 I don't know where they were where they had some roundabouts that were

30:06 - 30:10 close to each other that were functioning really well.

30:10 - 30:14 Uh now I haven't been to 'em, so I can't say th that.

30:15 - 30:19 Uh I can just only go by what they told us in that meeting.

30:19 - 30:24 And uh Jeffery, were you there? Yeah. Okay. And I think Jeffery w Jeffery was at that meeting also.

30:25 - 30:30 Uh and this is a state project. I mean I I know you guys know that so uh

30:32 - 30:36 Yes before you like to entertain a motion

30:38 - 30:46 There's more discussions about it uh we will have more discussion yeah I usually just ask for the motion second then discussion yes yes sir

30:51 - 30:56 Okay, I'll I'll make a motion to excuse me, let me back up a little bit here, make sure I'm on the right page.

30:56 - 31:00 There's two of them here, and I want to make sure I didn't jump over something.

31:00 - 31:11 Um I'll make a motion to approve the GDOT indication of roundabout support regarding the lighting for roundabouts associated with the Highway 44 widening project.

31:11 - 31:13 Okay, we have a motion, we need a second.

31:14 - 31:18 Second. All right. We have a motion and second. Uh discussion?

31:20 - 31:22 Oh. Do you have something? Yeah, I was gonna talk.

31:23 - 31:27 We're just talking about the uh lighting though, right? Yes, the lighting.

31:29 - 31:36 Yeah. I was gonna just I wanted to talk about this roundabout being there in period.

31:36 - 31:38 But I guess that's

31:38 - 31:47 Now something we can talk about now. Well it's it's not the it's not the the item on the agenda, it's just for the for the lighting.

31:47 - 31:49 Yes, sir. All right.

31:49 - 31:53 Okay. Okay. All right. So we have a motion, we have a second. Any further discussion?

31:54 - 31:58 Yeah, I I'd just like to reiterate, you know, this is a GDOT project, it's not a county project.

31:58 - 32:04 Um but i if we're gonna have one, it would be good for the county to provide the lighting and and make it

32:05 - 32:12 safer at night. Anything we can do to improve the uh the safety and the uh aesthetics of it I would be in favor of.

32:13 - 32:20 Okay. So we have a motion a second any further discussion? If not, all in favor let it known be be known by raising the right hand.

32:21 - 32:22 All right. All opposed?

32:23 - 32:24 Okay. All right.

32:29 - 32:34 All right. Consideration of the GDOT maintenance agreement.

32:34 - 32:43 GDOT is requesting a maintenance agreement, noting that the county will be responsible for maintaining all landscaping for roundabouts that are included as part of the Highway 44 widening project.

32:44 - 32:50 The roundabouts include those at Merchant Street, Linger Longer Road, Carriage Lane, Airabella Boulevard, Carey Station, and Richland Connector.

32:51 - 33:01 GDOT notes there's still uncertainty regarding the carriage lane Airabella Boulevard roundabout, but it is easier to include in this roundabout in the original plans and pull out later versus trying to add it back at a later date.

33:02 - 33:02 Okay.

33:03 - 33:06 Thank you. Uh like to entertain a motion, please.

33:10 - 33:19 Okay, again, I make a motion to approve the GDOT maintenance agreement regarding the landscaping for roundabouts associated with the Highway 44 widening project.

33:19 - 33:21 Okay. We have a motion to second.

33:25 - 33:28 Now I'll second. Uh any discussion?

33:28 - 33:37 Um yeah, I would just like to say, you know, it says here the GDOT notes that there is still uncertainty regarding the carriage lane Airabella Boulevard roundabout.

33:38 - 33:47 But it is easier to include in this roundabout in the original plans and pull it out later versus that I' tr trying to add it back in at a later date.

33:47 - 33:53 So just for the sake of efficiency, uh that that would be the reason that I would approve this today.

33:53 - 33:54 Okay.

33:54 - 33:57 Thank you. We have a motion second. Any further discussion?

33:57 - 34:02 Yeah, I'd just like to say uh I agree with what one thing she said.

34:02 - 34:11 You know, I don't I don't see or know what we're even talking about on this as far as the landscaping and the maintenance and that type thing.

34:11 - 34:18 Who's gonna do it? Uh whether it's us, the state, who's gonna decide what plants in there.

34:18 - 34:21 So I I would be against approving this.

34:22 - 34:24 And and I will say our packet was uh

34:25 - 34:30 detailed maintenance work plan. And I read it. Talking about the water and the pruning.

34:31 - 34:47 Uh as far as plant replacement, it it you know it talks about plant replacement material must be according to policy six seven five five-nine policy for landscaping and enhancements on GDOT right-of-way and GDOT specification section seven oh two.

34:48 - 34:56 Uh and the weeding, pest control, uh mowing, trimming, mulching, litter.

34:57 - 35:10 Uh is it too late to ask a question? Uh we normally do not and plus we you we usually ask you, but if you will as soon as the meeting's over, I'll be glad to answer your questions.

35:11 - 35:12 Yes. Yes, sir.

35:12 - 35:16 All right, so we have a uh motion, we have a second.

35:16 - 35:28 Uh any further discussion? Yeah, I just like I I guess what I'm trying to say is that roundabout on that arabellum, I just don't think it's the safest thing to do.

35:28 - 35:30 So have one Linger Longer.

35:31 - 35:38 When you're pulling off linker longer, you're looking back and you're gonna run into traffic at that second roundabout.

35:39 - 35:41 I just don't think it's very safe.

35:42 - 35:43 So but if we're talking about

35:45 - 35:49 Uh just uh landscaping of it. Right.

35:49 - 35:59 But yes, sir. Yeah, I I I would agree with Mark on that. You know, I don't I don't see the need to have two right there together, but it's it's not a given in what we're presented with here today.

36:00 - 36:17 What we're presented with today is the is the landscaping, and you know, Jeffery um Commissioner Smith said um you know there's there's not a lot of information there on uh exactly what that's gonna entail or what it's gonna cost the county, and I I I concede to that as well.

36:18 - 36:20 Okay, any further discussion?

36:21 - 36:26 All right, we have a motion. We have a second. All in favor, let it be known by raising your right hand.

36:27 - 36:29 All opposed?

36:29 - 36:30 All right.

36:32 - 36:33 I think it's supposed to be.

36:38 - 36:38 All right.

36:43 - 36:48 Consideration of a probation service agreement, Superior Court.

36:51 - 36:54 Chairmaster, can you just confirm on a 2-2 vote? Yes, it was 2-2.

36:55 - 36:55 Yes sir.

37:07 - 37:08 That's all right.

37:08 - 37:13 Um Superior Court utilizes a third party provider for probation services.

37:13 - 37:20 The board has previously approved contracts with the current provider for probate and magistrate courts, but a new contract term is required for Superior Court.

37:20 - 37:24 The agreement has already been executed by Superior Court Judge Alison Burleson.

37:25 - 37:26 All right. Thank you.

37:27 - 37:41 Like to entertain a motion, please. I make a motion to approve the probation services agreement with Judicial Alternatives of Georgia for probation services provided for the Greene County Superior Court.

37:41 - 37:43 Thank you we have a motion to second.

37:44 - 37:44 Second.

37:45 - 37:46 Second. In discussion.

37:48 - 37:53 I think this is we've done this every is it every five years?

37:53 - 37:57 I think so. Okay, I think every five years. All right, so we have a motion and second.

37:57 - 37:58 Any further discussion?

37:59 - 38:03 All right, no discussion. All in favor, let me know by raising your right hand.

38:04 - 38:05 Okay, thank you.

38:08 - 38:18 Consideration of an estimated rollback rate for property tax assessment notices uh pursuant to House Bill 92.

38:21 - 38:22 House Bill November.

38:24 - 38:28 House Bill ninety two was approved and signed by the governor in April of 2025.

38:28 - 38:35 House Bill 92 requires the local government to certify a rollback rate to include on the annual property tax assessment notices.

38:35 - 38:40 The chief appraiser has provided preliminary data in order to calculate an estimated rollback rate.

38:40 - 38:45 Staff has also reviewed the required rollback rate over the past few years in determining this rate.

38:47 - 38:48 Let me see yours.

38:49 - 38:50 Sorry.

38:51 - 38:53 Make sure I'm not missing something.

38:54 - 39:07 Okay. Due to the timing requirements for sending out property tax assessment notices, these figures were provided to each commissioner early and determined that the chairman would certify the suggested estimated rollback rate due to uncertainty related to the wind gap exemption amounts.

39:08 - 39:12 We have set the estimated rollback rate at the same level as the twenty twenty-four millage rate.

39:12 - 39:17 This decision is to ratify the decision to certify an estimated rollback rate of four point one two.

39:17 - 39:18 Okay.

39:19 - 39:22 Thank you. I'd like to entertain a motion, please.

39:23 - 39:39 I'll make a motion to certify the estimated rollback rate of four point one two for the unincorporated parcels and four point one two for the incorporated parcels on the twenty twenty five property tax assessment notices.

39:40 - 39:40 Okay.

39:40 - 39:45 Thank you. We have a motion. Mm-hmm. Second. Second. Okay. Any discussion?

39:48 - 39:52 No discussion. All in favor, let me know I'm raising your right hand. All right.

39:52 - 39:53 Thank you.

39:58 - 40:03 Consideration of a TSPLOST to project airport hangar space.

40:03 - 40:19 The county approved engineering services in December 2024 for a slight addition to the apron and clearing to accommodate two private box hangers at the airport with the intent to add these items to the current a apron expansion project utilizing T S PLOSS funds.

40:19 - 40:27 The current contractor for the apron project has extended pricing under that contract to provide pricing to complete this addition and clearing.

40:28 - 40:28 Okay.

40:29 - 40:52 Uh like to entertain a motion, please. I'll make a motion to allocate TSPLOST funding at an estimated amount of $140,000 $64.75 for the addition of the apron and clearing for the two private box hangers utilized utilizing item price pricing from the apron project.

40:52 - 40:52 Okay.

40:53 - 40:54 We have a motion, Mr. Second.

40:55 - 40:56 I'll second it.

40:57 - 40:58 Any discussion?

41:02 - 41:05 No discussion. All in favor, let me know by raising your right hand.

41:06 - 41:07 Thank you.

41:14 - 41:21 Consideration of an alcoholic beverage license application granted shows markets and provisions LLC.

41:22 - 41:27 The restaurant and retail store located at 3991 Walker Church Road is under new management.

41:27 - 41:40 The board has previously granted licensure for consumption on the premises of liquor, beer and wine for prior operators of restaurants and licensure for retail package sales for beer and wine for prior operators of retail stores at this location.

41:41 - 41:43 The current tenant is seeking the same levels of licensure.

41:44 - 41:48 The application was completed in order and application fees have been paid. Okay.

41:48 - 41:50 Uh entertain a motion, please.

41:51 - 42:02 I make a motion to approve an alcoholic beverage license for the consumption on the premises for liquor, beer and wine, and alcoholic beverage license for retail sales of beer and wine.

42:02 - 42:11 For granted shows market and provisions, LLC, located at thirty-nine ninety-one Walker Church Road in the name of John.

42:13 - 42:14 All ties are bigger.

42:14 - 42:16 All ties are bigger.

42:19 - 42:21 All right. I think we have a motion. Need a second?

42:21 - 42:23 I'll second it. Alright. Any discussion?

42:24 - 42:25 Are you open yet?

42:31 - 42:34 All right. All in favor, let it be known but raise your right hand.

42:35 - 42:35 Thank you.

42:37 - 42:42 Under uh Commissioner Reports. Uh Commissioner Smith.

42:42 - 42:43 Uh nothing.

42:45 - 42:47 Commissioner Lindsey? Nothing new.

42:47 - 42:48 Commissioner Blanton?

42:49 - 42:55 Uh just wanted to talk about that Airabella. I'm sorry. We got about what we want to do.

42:56 - 43:00 And I have nothing. And with that, this meeting is adjourned. Thank you so much for being here.