Greene County Board of Commissioners April 14, 2026 Meeting
Machine-generated transcript. Check the recording for exact wording and the minutes for official actions.
Transcript
00:00 - 00:03 I ask you to join us in the Pledge of Allegiance.
00:06 - 00:14 Pledge of Allegiance is a flag of the United States of America and to the Republic for which it stands.
00:14 - 00:19 One nation, one of the God, individual, individuals, judges of all.
00:20 - 00:24 Let's pray. Dear Lord, thank you for this wonderful day.
00:24 - 00:32 Thank you for these fellow commissioners that are here serving Greene County and for the interested parties in the audience.
00:33 - 00:37 We ask that you do everything we do is for your pleasure.
00:38 - 00:40 In Jesus' name we pray. Amen.
00:46 - 00:56 I'd like to call the meeting to order and uh note that all commissioners are present are present with the exception of Chairman Gary Aershry.
00:58 - 01:05 And first thing we'd like to do is open this up for a public hearing.
01:06 - 01:08 Do I read you you want me to read this?
01:09 - 01:12 I'll be happy to. Okay. Uh this is a public hearing.
01:12 - 01:16 Sorry. This is a public hearing on the Greene County zoning ordinance, Appendix B.
01:17 - 01:29 Amendments that are being proposed. The proposed changes aim to address additions to Appendix B zoning ordinance, including adding a section regulating data centers and their locations within the county.
01:32 - 01:33 Let's see.
01:33 - 01:36 Who do we have want to speak on it?
01:39 - 01:44 So I guess Rick, did you sign up to speak on this?
01:44 - 01:48 No, I did not. I should be on G3. Nobody's nobody's name is on there.
01:49 - 01:50 G three.
01:53 - 01:57 I don't have anyone, right? I guess you just ask if anyone would like to speak on it.
01:58 - 02:06 Is there anyone in the audience that would like to speak on the public hearing for the uh change in the zoning ordinance?
02:11 - 02:13 Did you sign up?
02:14 - 02:14 Yeah.
02:17 - 02:18 Yeah I did.
02:19 - 02:22 I wrote it in Chinese though, that may have been a problem.
02:22 - 02:25 Maybe that was you I was trying to give someone else.
02:26 - 02:31 Uh Ray Brentley uh 1051 Mashey in Greene County.
02:33 - 02:49 We went to the planning and zoning meeting and at that point in time talked about it a little bit then that I'd like to see the ordinance be uh aimed at uh a group of of uh industries as opposed to just the data center.
02:49 - 02:56 Uh data centers are a uh common thing. Uh the Orion didn't go around the moon by itself.
02:56 - 03:03 Uh as a matter of fact, the humans were only there doing what the AI wanted them to do, which is take pictures and see things.
03:04 - 03:12 But anyway, one of the co couple of the key things is if we make a uh I I think at that point in time we've talked a little bit about because with an exchange going on.
03:13 - 03:19 Uh Chuck participated in that as well. We began to try to understand a little bit more about what the ordinance was aimed at.
03:19 - 03:24 But uh the point I tried to make with him is so what's going to be the next thing that comes down the line?
03:24 - 03:31 We have a uh chemical plant. Chemical plant is a lot more demanding than a uh a data center is.
03:31 - 03:36 Uh data centers are coming. There is a line that goes from Atlanta to Augusta.
03:37 - 03:46 There was a nuclear plant over there, and there's also the former bomb-making plants over there called uh Savannah River Plant.
03:46 - 03:58 Then it goes from there down to Savannah, where the uh port authority is down there, and the port down there happens to be uh one of the largest ports on the east coast these days.
03:58 - 04:08 But at any rate, one of the things that we ought to look at is a thousand-foot buffer between the structure and the buildings for industrial kinds of products.
04:09 - 04:11 And so I took a look at uh
04:11 - 04:26 The Ritz Carlton. The Ritz Carlton has uh twenty-eight acres and only ten percent of that, which was the number we used at that point and I used on planning and zoning as well, only ten percent of that acreage is taken up by all of their structures put together.
04:27 - 04:34 The only place I think that they're really less than a thousand feet without a buffer w with a buffer all the way around them, because you don't see them.
04:35 - 04:52 is down at the lake. So if we built uh if they chose a place like uh the warehouse of property where it's fourteen hundred acres and they wanted to put it there and they put it in the middle where you couldn't see it and you had a three hundred foot buffer and you're a thousand feet to decibel, we solve a lot of the noise problems and everything together.
04:52 - 04:58 So rather than being focused on just data centers, I think we ought to take a bigger bigger picture than that.
04:58 - 05:00 Because I think data centers are a uh
05:01 - 05:07 Low impact as far as the infrastructure in our county is concerned, but is a good cash revenue for taxes and that sort of thing.
05:08 - 05:11 Don't take a lot of people to run it. And I think it's a good thing to have it there.
05:11 - 05:16 But I'd like to re-look at the ordinances and we ought to look at the ordinance as a whole if we can.
05:16 - 05:17 Thank you.
05:21 - 05:23 Anyone else who'd like to speak?
05:33 - 05:35 This is on the data centers.
05:35 - 05:36 Okay.
05:38 - 05:42 Hi. My name is Adam Hagee. I represent Ogeechee Riverkeeper in the upper watershed.
05:43 - 05:50 Uh and a small portion of Greene County is in our basin. Um so we have taken an interest in your data center ordinance.
05:50 - 05:58 Um I will s begin by saying we're very enthused that you are being proactive um and getting ahead of this, unlike some counties that are waiting until
05:58 - 06:04 There's a developer breathing down their neck and they feel like they're backed into a corner and have to, you know, make rash decisions.
06:05 - 06:09 Um that being said, we have taken a look at your draft ordinance.
06:09 - 06:13 Um overall, we're pretty pleased with a lot of what's included in there.
06:13 - 06:18 We have identified um a number of areas that we feel like
06:19 - 06:24 information could be added, some language to further strengthen those uh sections.
06:24 - 06:29 Um I've sent a copy um to your zoning administrator.
06:29 - 06:31 Unfortunately I wasn't able to get that to him until
06:32 - 06:37 late yesterday afternoon. So um I'm sure none of that information has been shared with you all yet.
06:37 - 06:44 But just to real quickly highlight some of the areas where we think um some changes could be made.
06:45 - 06:54 Uh well I I was happy to see on the most recent update that you all did address um water usage more specifically than in the original draft.
06:54 - 06:59 So that was one area that we had identified a need for some additional language.
07:03 - 07:22 Things like your your noise uh regulations, um while it's pretty good as written, we feel like it could be a little stronger and uh better reflect protection of uh species besides just nuisance to neighboring property owners.
07:22 - 07:31 Um so for example, we would advocate specifying nighttime sound limits and not just a a broad um across the board limit.
07:31 - 07:36 um as those nighttime limits can be more impactful on migratory species and such.
07:38 - 07:46 We would highly encourage you all to look at incorporating a community benefits agreement um into your ordinance.
07:46 - 07:52 Um this is an opportunity, as the previous gentleman said, a development like this can bring a lot to the county.
07:52 - 07:57 Um this is an opportunity for y'all to make sure that it's as beneficial as possible.
07:57 - 08:03 Um there's not, as he mentioned, a lot of impact on your existing infrastructure.
08:03 - 08:15 Um and as such, this is unlike other types of development, um, really something that y'all could benefit greatly from if regulated appropriately.
08:16 - 08:20 Anyways, like I said, there's just some minor changes we would suggest.
08:20 - 08:24 I have a copy with me. If anyone would like to speak after me, I can share that with you.
08:24 - 08:28 I can send it to you via email. Um but your zoning administrator does have that.
08:28 - 08:32 Again, thank you all for uh tackling this proactively. Thank you.
08:32 - 08:33 Thank you.
08:35 - 08:37 Chuck, did you get a okay?
08:41 - 08:45 Anyone else would like to speak this afternoon?
08:49 - 08:54 If no, then uh the public hearing is now closed.
08:56 - 08:59 We'll start our regular agenda items.
09:00 - 09:08 Minutes from the March 10th, 2026 regular meeting and the February 10th, 2026 executive session.
09:11 - 09:16 Y'all will take a look at those and then I'd like to get a motion, please.
09:17 - 09:25 I make a motion to approve the minutes from the March 10th, 2026 regular meeting and February 10th, 2026 executive session.
09:25 - 09:29 Have a motion. Second. Got a second with D.
09:30 - 09:31 Any discussion?
09:33 - 09:35 No show of your hands?
09:36 - 09:37 So 4-0.
09:44 - 10:09 I'd like to now bring up consideration of ordinance twenty six oh one to amend Appendix B zoning Article Seven use requirements by district creating section nine point two eight Data Centers Appendix Nine Special Provisions Repealing Any Conflicting Ordinances and Establishing an effective date.
10:11 - 10:16 As the board's well aware, we have been uh working through this process for a while.
10:16 - 10:24 Um we originally put a moratorium for data centers in place due to the recent uh proliferation of data centers across Georgia.
10:24 - 10:33 Um we feel like we've uh addressed a lot of comments and concerns uh with the proposed draft that's in your packet.
10:38 - 10:41 I would like to entertain a motion.
10:43 - 10:49 I'll make a motion to approve ordinance number twenty-six-zero one and waive the reading of the ordinance.
10:49 - 10:52 I have a motion to have a second. Second.
10:53 - 10:55 Second, any discussion?
10:56 - 11:20 Um I would just like to say I I realize and I appreciate the comments uh on it that uh you know it doesn't include everything under the sun and I don't know that uh it ever will, but I think it's a great uh document the way it's written and it gives broad discretion for the commissioners uh and um and the staff to uh make uh any kind of uh
11:20 - 11:25 concessions they need to make or any kind of demands that they need to make on anybody that might apply.
11:25 - 11:29 It's um a lot better than what we had. Right.
11:29 - 11:32 Which was not any other discussion?
11:33 - 11:35 If not show of hands.
11:37 - 11:37 Or oh
11:41 - 11:43 Motion is approved.
11:45 - 11:49 A special use permit for telecommunications
11:50 - 12:06 antennas and towers, Rayle Electric Membership Corporation request to increase the existing tower height, Firetower Road, parcel U0000-1007.
12:07 - 12:14 Rayle Electric Membership Corporation is requesting to increase the height of an existing tower from 190 feet to 270 feet.
12:14 - 12:19 The site is located on Firetower Road and is approximately 1.8 acres in size.
12:19 - 12:26 The property is currently zoned A1. The purpose of the request is to improve two-way radio communications.
12:26 - 12:32 There are currently no residential structures within proximity of the tower, and the tower is surrounded by farmland.
12:33 - 12:41 Existing tower has been in its current location since 1986 and therefore does not meet uh the county's current setback requirements.
12:42 - 12:50 The FAA has determined uh that the proposed tower modifications would not be a hazard uh provided that a lighting system is installed.
12:50 - 12:54 Uh the site currently does not have security fencing.
12:58 - 13:02 Since I'm acting chairman tonight, I wanted to make one request.
13:03 - 13:08 Can anyone tell me where can show of hands who can tell me where Firetower Road is?
13:12 - 13:16 That's in the northern part of Greene County near Woodville.
13:18 - 13:38 I'd like to entertain a motion now. I'll make a motion to approve the special use permit submitted by Rayle Electric Membership Corporation with the stipulations that all FAA and FCC requirements are met, security fencing is installed, and if necessary the county is allowed to co-locate on the tower in the future.
13:39 - 13:41 I have a motion.
13:44 - 13:48 I got a second remark. Any discussion?
13:48 - 13:56 Um closest to me I could I can see the Greene County Tower where it is from my house, uh top of it.
13:56 - 14:08 And uh I know it's important for rail EMC to stay in communication during outages and emergencies, so uh this is gonna greatly improve um their ab ability to do that.
14:09 - 14:15 I think it's a good thing for them and uh doesn't hurt anybody is just way on out there.
14:17 - 14:18 Any other discussion?
14:19 - 14:21 If not, I'd like to have a show of hands.
14:23 - 14:24 Approved 4-0.
14:33 - 14:42 The consideration of a revised preliminary plat request, Hardeman Builders Group, LLC Park Place, Phase Two.
14:43 - 14:48 The board approved a preliminary plat uh previously in August of 2024.
14:49 - 14:54 Due to various changes, staff has advised that the preliminary plat be reviewed again.
14:54 - 15:01 This the plat still calls for 130 townhomes to be created from 17.40 acres.
15:01 - 15:06 The property is located in the park place development and is zoned LR2.
15:06 - 15:12 The revised preliminary plat has been reviewed and complies with the county's code and the Georgia Platte Act.
15:14 - 15:14 Okay.
15:15 - 15:19 And I have a number Rick McAllister.
15:27 - 15:32 Rick McAllister, 1341, Beverly Drive, Athens, Georgia.
15:32 - 15:41 I'm the agent for Harvard Hardeman Builders Group. Really, I just wanted to see if you have any questions of what we were doing and why we were changing the plat.
15:43 - 15:47 Really uh kind of give you what's the same first.
15:47 - 15:53 Um it's 130 lots. We had 130 lots last time, nothing really changed as far as that goes.
15:54 - 15:57 Um all the buffers and setbacks surrounding property are still the same.
15:58 - 16:07 Nothing really changed on that goes and we're still meeting all the rest of the codes that apply to a plumbery plat in townhome development um just like we did last time.
16:08 - 16:23 What's kinda happened uh two main things happened. When we were going through construction drawings, um a main water line that feeds the tower that's located there was not actually built in the easement it was given.
16:23 - 16:27 So we needed to adjust our plan to reassign the easement.
16:27 - 16:32 It was close but not quite there. So we had to adjust a couple of things from
16:32 - 16:41 our original plan to allow for that utility existing scenario um which primarily did actually a couple of good things.
16:41 - 16:48 It allowed us to incorporate a mail kiosk in a small common area closer to the pond instead of a bunch of units.
16:48 - 16:58 So that actually wasn't a bad scenario. Um the next thing the developer decided now they wanted to put a pool and pool building amenity in the future.
16:58 - 17:01 So they wanted to locate it more interior to the property
17:02 - 17:06 And so we took a block of town homes out and moved into another part of the property.
17:06 - 17:10 And so that's the main reasons that we uh we changed everything around a little bit.
17:10 - 17:15 There's a couple of different footprints, all meet the minimum a thousand square feet.
17:15 - 17:25 The footprints are examples are on the Plymouth plat, if you want to look at that. Just moving a couple of different sizes for a couple of different types of uh townhomes for ri variety in the unit.
17:25 - 17:35 So primarily it's the same with those kind of changes. So I just want to make sure that if you guys have any questions of, you know, what we did to bring it to this revision, just want to be here to do that.
17:35 - 17:35 Thank you.
17:46 - 17:49 Victoria, Victoria.
17:52 - 17:56 I didn't want to say your last name wrong, so I just said your first name.
18:02 - 18:04 It's Bendy. Bendy. Oh yes.
18:06 - 18:07 There you go.
18:07 - 18:11 I'll say I'm a little short. Apologies for that, Commissioners, and good evening.
18:11 - 18:17 My name is Victoria Delecio and I live at eleven zero one Red Bud Street in Greensboro, Greene County.
18:17 - 18:31 And I am in phase one of Park Place. And we just had some questions that we haven't gotten the answers for regarding water access as to how the new town homes are gonna be
18:32 - 18:38 put in and where that water access will come from and what that will mean for residents currently living in that neighborhood.
18:38 - 18:46 We're also a little concerned with 130 new units as to whether there will be pedestrian safety improvements.
18:46 - 19:00 Currently there's not a lot of sidewalks and because that portion of the road is private, it's not posted with a speed limit, which can be dangerous for people in the neighborhood, including children.
19:01 - 19:12 And we also had some questions about property protection for the current owners and specifically egress and ingress as it comes to traffic on those roads.
19:12 - 19:25 And also whether this new phase, I'm assuming, but we haven't gotten a clear answer as to whether that will be included in the current townhomes and therefore help with road maintenance and other maintenance in the community or not.
19:26 - 19:27 So essentially we're just
19:28 - 19:48 looking to get some answers or I'm looking to get some answers specifically on how this will change our community and how safety precautions will be taken into place to make sure that everybody can enjoy the community safely and also to make sure that we all have drinking water and it's not compromised in some way as we see changes happening.
19:49 - 19:49 Um yes sir.
19:50 - 19:57 All right, thank you. Thank you. And my might try to get you some answers in a moment for a couple of questions anyway.
19:57 - 19:58 Thank you, sir.
20:07 - 20:09 Sherry Huntington.
20:13 - 20:17 I'm Sherry Huntington, 1131 Red Bud Street.
20:17 - 20:20 I also live in Phase 1, Park Place.
20:20 - 20:28 I'm a neighbor with Victoria. Uh we are concerned about the intentions of the builder to integrate phase one and phase two.
20:28 - 20:34 So we currently work off a well. Are they gonna have their own well and their own source of water?
20:34 - 20:43 And to speak to the other gentleman, Mr. McAllister, we're concerned as a as a whole of the amenities and how they're gonna be shared.
20:43 - 20:46 Is the HOA gonna be shared? Are we gonna be one unit?
20:46 - 20:55 Uh the roads currently we own up before the bridge, so all of those roads are our responsibility.
20:55 - 21:01 Uh the landscaping on the roads as well as our individual properties and
21:02 - 21:09 Again the pool. Uh we have amenities, we have a t uh tennis court, we have um a pool of our own.
21:10 - 21:14 However, are they gonna integrate so we can all neighbors use both pools?
21:14 - 21:19 Are they gonna be a separate entity from phase one? And what parts are gonna be shared?
21:19 - 21:30 So clearly stating what the infrastructure is gonna be, the amenities, and how we're gonna share and work together or separately are our concerns.
21:30 - 21:36 All right. Thank you. And safety is a good point. Um currently people drive really fast.
21:36 - 21:42 There are no sidewalks. Um and it is a concern for dogs, children in that area.
21:42 - 21:48 And then are they gonna have sidewalks in their community as well as we balance to 44 too?
21:48 - 21:48 Thank you.
21:49 - 21:50 Thank you.
21:52 - 21:55 Rick, can you answer a couple of those questions?
22:03 - 22:05 What about water?
22:05 - 22:10 Okay. Unfortunately, I didn't got get didn't get my pen out quick enough to write down all the subjects.
22:10 - 22:13 So if I miss a couple, I would appreciate a reminder.
22:13 - 22:24 That's okay. Um so when we when we do uh first of all I want to tell you that this is this has already been plenary platinum and actually had a land disturbance permit, so we've kind of gone through the process.
22:24 - 22:24 But
22:25 - 22:33 Just to help everybody out, when we do something like this, what we have to do is do fire flow testing on the existing water system.
22:33 - 22:40 Because we gotta be able to say, hey, there's this much gallons a minute available, so make sure there's enough water available there.
22:41 - 22:52 The system that serves this is part of Piedmont Water's operating system and it just so happened that there's a source well and a tank on the phase two part of the property.
22:52 - 23:02 So it's a part of not only the source well tank, but it's also hooked into the rental system and through the and through back through rentals and all through the uh to the water treatment plant.
23:02 - 23:04 So the source of the water
23:04 - 23:09 is fed by that well and the water treatment plant. It comes from two different directions.
23:09 - 23:13 So this is not the only source. This is a source for the whole community in this area.
23:14 - 23:23 And when we came up and and did our fire flow testing, it typically you're running about four or five hundred gallons a minute in a fire hydrant.
23:23 - 23:24 This was over twelve hundred.
23:25 - 23:28 Um just to give you an idea, because you're right there at the source with the tower.
23:28 - 23:33 So pressure's not a problem and quantity's not a problem. Um so that's something we had to prove in to begin with.
23:34 - 23:42 Um the second thing is the sewer. Well, you know, for us to do something like this, we have to go through a Pont Water and actually buy the capacity of the sewer.
23:42 - 23:50 So not only do you get a letter saying, Yeah, we can do it, we had to go pay a nice sum of money to make sure you can have that capacity of the sewer.
23:50 - 23:54 So they do have capacity sewer in the existing lift station, which is just to the
23:55 - 24:00 um po it's I think it's on the phase one side of of of the uh of the whole parcel.
24:01 - 24:14 Um as far as amenity areas, um th is is is as I understand it right now, two different HOAs, two different ownerships of of the property and the plan is there's not
24:14 - 24:20 We didn't really ask in due diligence to share their amenity of the phase one.
24:20 - 24:25 So one of the main reasons why we wanted to put an amenity in phase two.
24:25 - 24:29 So we don't have, hey, amenity ha you have a pool here.
24:29 - 24:36 We don't you know, we didn't want to have to deal with that scenario. So I hope that kinda answers the the amenity questions like that.
24:36 - 24:38 Um as far as traffic patterns
24:39 - 24:43 Well, that whole place is built on a grid system for traffic pattern.
24:43 - 24:46 We have no choice but to take that plan and flip it over and mirror a plan.
24:47 - 24:55 Because that's so the traffic pattern is all lined up to the roads. So the the standard was set from the phase one development and it's just mirrored to the other side.
24:55 - 25:02 So we have to keep all the intersections perpendicular to each other to the most ability as possible.
25:02 - 25:07 So we've we've done what the traffic needs to do for as as best we can as possible.
25:07 - 25:09 As far as the ownership goes
25:10 - 25:15 Um, I believe the property line is almost the center line uh of that road.
25:15 - 25:24 So it actually it's a split ownership. Now um I'm here as the developer's representative ne representative, not necessarily HOA.
25:24 - 25:37 I'm not sure how the two HOAs could do. You could have a scenario where once the product is built out and both HOAs deem that necessary to to combine, don't have that information on that situation.
25:37 - 25:38 I can't answer that.
25:38 - 25:43 Um as far as sidewalks, we have to put in sidewalks interior.
25:43 - 25:51 All the interior to each lot, to every house, to every uh access point to the uh to to the townhomes.
25:51 - 25:56 Um we do not have provisions for a sidewalk going all the way up to forty-four.
25:56 - 26:00 That's not a part of the plan. We don't own the property that goes all the way to forty-four.
26:00 - 26:06 So we only own the property before it gets to the bridge. And so we do not have that in into the situation.
26:08 - 26:19 Signage, that's probably a a good idea. We I don't know the whole survey of how many signs are out there, if we need to post some some some speed limit signs, um that's okay.
26:19 - 26:23 Um and um that's my list, so I'm not sure if I miss anything.
26:23 - 26:24 That sounds like
26:26 - 26:26 Hey.
26:27 - 26:29 One question. Who owns the road?
26:29 - 26:34 It's it's it's the public says it's says it belongs to the H O A here.
26:34 - 26:40 Um I believe it's split. But I have to split uh do you think your developer is gonna uh
26:40 - 26:43 Up upgrade that way because it's a free sale shape.
26:43 - 26:48 Well, we have to add on to it because it's incomplete in a certain area.
26:48 - 26:48 Yeah.
26:49 - 26:53 And the center line is the property line.
26:54 - 27:05 So actually one side is owned by one HOA, the existing HOA, and the other side is owned by the uh So does that mean you y'all will do your side?
27:08 - 27:16 Well I'm I'm not saying that, but I'm sure some scenario could be worked out as far as overall maintenance.
27:16 - 27:20 It's just in this context I don't have that information.
27:22 - 27:25 Rick, how many homes are in the f in the first phase?
27:27 - 27:34 I couldn't tell you that one. Sorry. I couldn't tell ya. I'm we I'm dealing with seventeen acres here, so I know how many homes we can put there.
27:34 - 27:38 I'm not sure how many is in there. Does anybody else would you know?
27:38 - 27:41 How many is there? I'm not sure. Alright, I'll find out.
27:44 - 27:44 Oh right.
27:45 - 27:45 Okay. Okay.
27:48 - 27:52 We're talking about tripling the size of what's currently there. Yeah.
27:57 - 27:58 All right, thank you.
28:03 - 28:19 I'm sorry, I would also like to uplift that we have an issue as part of place with damage from construction already being done to the road that we are being told we are financially responsible for as homework.
28:20 - 28:30 And so one of my questions was the concern that if the divide in lines at the middle of the road and damage is done to the road during construction.
28:30 - 28:39 I'm a little bit concerned that there's going to be a tug of war between who is responsible for paying to fix any road damage.
28:40 - 28:47 And certainly as a property owner, I feel like that should be anticipated in the construction contract.
28:47 - 28:49 and remedy by that cover.
28:51 - 28:56 Well that's that's inside the gate, so we don't have any control over that part.
28:56 - 28:58 What were you gonna say, Rick?
28:59 - 29:10 Well typically what we do is situations like this is obviously we don't want to have the road going into the site be worse off than what we started for.
29:11 - 29:15 So typically what we would do is we would do a report on the road as it is today.
29:16 - 29:22 And then do a comparison and when we're done and then mitigate whatever damage it would be into that situation.
29:23 - 29:28 Um we can't accept um responsibility for damages that are existing today.
29:28 - 29:29 Right.
29:30 - 29:30 Okay.
29:31 - 29:33 But what would happen going forward though?
29:34 - 29:40 Um since you have to use that road. Yeah. Well it has to meet county standards.
29:40 - 29:55 So I would I would say upon final inspection of the development, if there was a any type of uh uh remedy uh uh remediation needs to happen, um we would have to do that prior to doing a clear I mean a final flat.
29:56 - 30:01 What about after that? Let's say the road is is fixed back, everything's fine.
30:01 - 30:12 But going forward ten years from now, if that has to be resurfaced, why would they be responsible for all of it and not that other development be responsible for half?
30:15 - 30:16 It would uh Okay.
30:17 - 30:20 But there so there would there's already an agreement for that?
30:21 - 30:25 There's not an agreement for that, but there's ownership of half for each area.
30:25 - 30:25 Okay.
30:26 - 30:29 you would you would assume responsibility for had hacking.
30:29 - 30:49 But what I what I what I was trying to get at is if there's let's just say there's two thousand dollars worth of damage you need to be fixed today and then there's ten thousand dollars worth of damage that can be fixed when it's all done, there needs to be some sort of scenario via final planning s and inspections to accommodate what we need to do.
30:50 - 30:51 So basically going forward
30:53 - 31:04 From what I understand, they would there would be more homeowners sharing in the same cost of repaving in the future, which would take your amount that you're responsible for down.
31:04 - 31:05 Probably so.
31:06 - 31:11 They would probably have to get together. Right, the all that have to get together to repave it.
31:14 - 31:23 you know an obstacle for everybody just because the way it was foreclosure off back and somebody did this or that and the other.
31:23 - 31:33 Um yeah at this point we're just trying to get the development completed and getting what was part partly completed done and and operating properly.
31:33 - 31:34 Okay.
31:34 - 31:35 Okay.
31:37 - 31:39 No more speech, right? No sir.
31:41 - 31:44 All right. I would entertain a motion
31:50 - 32:03 I make a motion to approve the revised preliminary plat request submitted by Hardeman Builders Group LLC for park place phase two, creating 130 townhomes from 17.4 acres.
32:04 - 32:05 I have a motion.
32:06 - 32:07 Second.
32:10 - 32:10 Second.
32:11 - 32:14 All in favor shall raise your hand.
32:16 - 32:16 Four. Oh
32:21 - 32:22 Okay.
32:27 - 32:32 Uh consideration of a resolution to declare certain property as surplus.
32:33 - 32:43 A list of items has been identified as surplus property based on the age, condition, lack of use, or other factors that render the property no longer serviceable to the county.
32:43 - 32:48 To dispose of these items, the board needs to first declare these items as surplus.
32:51 - 32:52 I would entertain a motion.
32:53 - 33:09 I make a motion to adopt the resolution number two zero two six dot four dot one four A, declaring certain property, surplus property, and to waive the reading of the resolution.
33:10 - 33:15 I have a motion. I need second. Second. And second. All in favor?
33:23 - 33:31 Consideration of a policy governing temporary signs and activities on county annexed campus property.
33:32 - 33:36 So due to the ongoing uh construction activities of our new um
33:37 - 33:47 Annex building, uh constrained right-of-way conditions, and the need to ensure safe ingress and egress for voters, emergency services, and the general general public.
33:47 - 33:57 Staff recommends that the policy regarding campaign activities along Annex Campus Drive be changed and limited to only allow temporary signage.
34:08 - 34:14 Um David may not uh Mark Scholes, S C H U L Z, 2040 Pine Valley Court, Greensboro.
34:15 - 34:24 David and and Mark are new to the board, but you the rest of you may recall that I actually was very involved with the writing of the original ordinance a couple three years ago.
34:24 - 34:27 And I talked to Gary about it after I wrote it. Um
34:28 - 34:39 And I noticed that there's a temporary, and I don't know how long temporary is, but um there were a couple of things that we were trying to do back then, and I just hope that moving forward we can keep those things in mind.
34:39 - 34:47 The the primary one that that at that port point Byron Lombard was worried about was entrance area and not having signs there.
34:47 - 34:57 Um the other issue that was very important was that we were told that we had to put down put up and take down signs every day, which to me was absolutely ridiculous, thankfully we got away from that.
35:00 - 35:07 And and and so I think we won with those arguments and I would just hope that moving forward we would do that.
35:07 - 35:15 I was um when I did this, uh I talked to Gary about it and he sent it to the Democrat Party and they blast off on it.
35:15 - 35:19 It was their actual recommendations that the canopies be put on there.
35:20 - 35:27 And I noticed the canopies are not on the the new ordinance, and I know that they created some of the problem when we had the recent construction.
35:27 - 35:29 So that was uh
35:29 - 35:43 That was not a particular important issue to me. The other thing that was important was that there were multiple signs all over the place down there, and we limited it to one sign per candidate on each side of the road.
35:43 - 35:48 So we have we severely limited the number of signs uh two or three years ago.
35:48 - 35:57 So I think we were very successful in that. And I just hope that temporarily we can go back to the simpler uh plan that we had in place.
35:57 - 36:01 And so basically I support it. Thank you.
36:03 - 36:09 So the way I read it, we can only have one sign on each side of the road going in.
36:12 - 36:12 Okay.
36:16 - 36:19 I would entertain a motion to
36:20 - 36:22 approve this.
36:22 - 36:30 I make a motion to adopt the policy governing temporary signs and activities on county annexed campus property as presented.
36:31 - 36:31 Have a motion.
36:32 - 36:33 I'll second it.
36:34 - 36:35 Any discussion?
36:36 - 36:38 I didn't want signs to start with so
36:42 - 36:44 uh show of hands.
36:53 - 36:59 Consideration of a budget adjustment for the HVAC replacements.
37:00 - 37:04 The HVAC unit at the recreation gym stopped working in February.
37:04 - 37:16 Contractor was able to get this unit working temporarily, but recommended replacement with a 20-ton split heat system at the cost of $41,714.
37:17 - 37:23 Two units at the radio towers have also stopped working and another one is starting to have maintenance issues.
37:23 - 37:28 These units are responsible for cooling the equipment for the public safety radio system.
37:28 - 37:36 Uh staff had previously utilized temporary portable AC units to keep the equipment uh equipment rooms cool.
37:36 - 37:44 Due to the age of the units, uh contractor has recommended replacement of the three units at a cost of thirty-eight thousand four hundred dollars.
37:45 - 37:59 Staff recommends using utilizing prior year fund balance from the recreation tax district fund for the gym unit and utilizing prior year fund balance from the E911 fund to cover the cost of replacement.
38:04 - 38:14 I would entertain a motion on this. I'll make a motion to approve the replacement of the HVAC unit at the recreation gym utilizing prior year fund balance.
38:14 - 38:25 of the recreation tax district and the replacement of the HPAC units at the towers utilizing prior year fund balance of the E nine one one fund.
38:26 - 38:29 I have a motion. It's second. I'll second it.
38:30 - 38:31 Any discussion?
38:32 - 38:38 I will only say that uh I wasn't too smart. I couldn't figure out what a HVAC system was doing at a towel.
38:39 - 38:42 Somebody had to explain to me the equipment.
38:43 - 38:47 Uh uh have a motion and a second. Show of hands.
38:49 - 38:49 Or oh
38:59 - 39:01 So if I can get to the next one.
39:09 - 39:13 Consideration of a contract extension for solid waste services.
39:13 - 39:22 The county's current contract with waste management for solid waste services has the option to extend for two one-year terms.
39:22 - 39:30 Staff has communicated with waste management that it will refer to con the contract to align with the county's fiscal year ending September thirtieth.
39:30 - 39:38 Waste management has agreed to change and to keep the contract terms largely the same through September thirtieth, twenty twenty seven.
39:38 - 39:45 The only pricing change over and above what is contemplated in the contract uh concerns the per ton fee.
39:45 - 39:57 Uh the county has also advised waste management. The county will be placing the contract out uh for public bid and we'll be requiring various information from waste management to facilitate the effort.
40:00 - 40:11 I will then attain a motion. I make a motion to approve a contract extension with the county's current Solid Waste Services vendor for a term ending September 30th, 2027.
40:12 - 40:13 I have a motion.
40:14 - 40:15 Second.
40:16 - 40:18 Second, any discussion?
40:21 - 40:23 If not, we need show of hands.
40:43 - 40:48 Considerations of amendments to the arena rental policy.
40:48 - 40:53 There's been an increase in inquiries to use the arena for truck and car shows.
40:53 - 41:05 Such uses compact the underlying soil and make it difficult to alternate between the typical uses of the arena, requiring staff time and material expenses to remediate the arena floor.
41:05 - 41:10 Staff has drafted changes to the arena rental policy to prohibit certain uses.
41:14 - 41:23 I will entertain a motion. I make a motion to amend the arena facility rental policy as presented.
41:23 - 41:24 I have a motion.
41:25 - 41:26 Second.
41:26 - 41:29 I have a second. Any discussion?
41:32 - 41:38 I have one. Uh is the dollar fees stay the same for the rental?
41:38 - 41:40 Yes. Everything stayed the same there.
41:42 - 41:49 We rented out uh we allowed the contractors during the storm to use the arena.
41:49 - 41:51 Isn't that what compacted it before?
41:54 - 42:00 And so then people using it for horse arena were having problems with it.
42:01 - 42:09 So we've had to make some changes and uh had Charles Crumley come in and do the work and get it back to where they could use the arena.
42:11 - 42:19 Yeah, I went by there uh this morning after development authority meeting and they they were putting sand on it and getting it ready.
42:19 - 42:22 Uh but they said they had to take the motor grater to rip it up to
42:23 - 42:27 uh relieve that compaction on it. So they're getting it right.
42:28 - 42:30 I have a motion and a second.
42:31 - 42:33 A show of hands.
42:34 - 42:35 Four oh
42:40 - 42:50 Consideration to award a bid for the fiscal year twenty twenty six local maintenance and improvement grant road projects.
42:50 - 42:54 So resolution number twenty twenty-five dot
42:55 - 43:10 11.18B was approved at the November Board of Commissioners meeting authorizing the resurfacing of approximately thirty-one miles of county roadway and shoulder rehabilitation of approximately twenty-nine miles of roadway.
43:11 - 43:17 The estimated cost for the pros work was five million two hundred fifty-nine thousand six hundred and six dollars and fifty-one cents.
43:18 - 43:24 The county received bids from six contractors at the bid opening on march twenty seventh, twenty twenty six.
43:24 - 43:32 E. R. Snell provided the lowest bid at four million five hundred ninety thousand four hundred twenty-four dollars and sixty cent.
43:35 - 43:45 I'll entertain a motion to approve this. I make a motion to award the bid for the fiscal year 2026 local maintenance and improvement grant projects to E.R.
43:45 - 43:54 Snell as the lowest responsive and responsible bidder and authorize the chairman and the county manager to execute the necessary contract documents.
43:55 - 43:56 I have a motion.
43:58 - 44:02 Mark seconds. Uh I just
44:03 - 44:13 we'll just show what we have approved. This has already been approved, but Carey Station Road will be getting four miles of new uh pavement.
44:14 - 44:17 Westlake Road point nine five miles.
44:17 - 44:40 Parks Mill two point one, Askew Road one point four four miles, Richland Connector two point four miles, Lake Oconee Trail two miles, Veazey Road four point seven miles, Liberty Church Road six point two zero miles, Grey Horse Road one and a half miles, Bethany Church Road five and a half miles,
44:40 - 44:43 and English School Road.
44:46 - 44:51 We have a motion and a second. I'll show of hands for oh
45:02 - 45:06 consideration to approve of professional services for the
45:07 - 45:15 Historical, architectural, mechanical, electrical, plumbing, and structural assessment of the historic courthouse with Lord Aeck
45:15 - 45:16 Sargent.
45:17 - 45:21 The Board of Commissioners is programmed funding for the renovation of the historic courthouse.
45:21 - 45:30 After additional discussion and inspection of the facility, there are additional aspects we would like to more thoroughly investigate prior to beginning any renovation activities.
45:30 - 45:36 Staff contacted Lord Aeck Sargent, an architectural firm which has significant experience with historic structures.
45:37 - 45:46 They have proposed a condition assessment that will include mechanical, electrical, plumbing, structural, and historic architectural aspects and conditions of the facility.
45:46 - 45:53 Their assessment will result in an assessment report and treatment recommendations for the facility.
45:53 - 46:01 The proposed cost is $89,920 plus their reimbursable expenses.
46:02 - 46:06 I have a few people signed up to speak. Terry Lawler.
46:14 - 46:16 Thank you, Mr. Chairman.
46:17 - 46:23 Commissioner I was speaking today as chairman of the Foundation for Preservation of the Corporal Some Resfunctions.
46:23 - 46:30 I speak off the top of my head, but I'm going to read something, so I hope you all don't mind and I'll be leaving you all with a copy.
46:37 - 46:38 Yeah, go ahead.
46:39 - 46:52 For almost three years of recent efforts, as well as actions going back as far as the 1990s, community leaders have contemplated making improvements and updates to the functionality of our iconic greenhouse courthouse.
46:53 - 47:01 In fact, the study of the courthouse completed in the 90s received a national award, and many of their suggested recommendations remain valid today.
47:01 - 47:02 There we go.
47:03 - 47:12 Today's count today's county commission, with the help of County Manager David Crawley, may be taking the necessary steps forward in addressing the needs of our courthouse.
47:13 - 47:33 As we stated back in 2023, a study completed by the DCA and ACCG found that, quote, when a new courthouse is built outside downtown, the removal of the traditional courthouse activities will likely bring about a significant loss of economic activity in the center of town, even if the old building is preserved and reused.
47:35 - 47:45 As our study further indicated, open quote, courthouse functions create traffic both directly and indirectly through associated functions such as attorneys' offices.
47:45 - 47:54 If these functions go elsewhere, it is not likely that the new uses of the old building, such as a community center or a museum, will generate similar volumes of traffic.
47:54 - 48:02 In addition, county governments are often major downtown employers, with county employees helping to support downtown restaurants and shops.
48:02 - 48:10 The well-documented experience of many communities indicates when courthouse functions and county employees move away, downtowns decline.
48:13 - 48:24 And as we said back then and still remain committed today, the Foundation for the Preservation of the Greene County Courthouse and its functions is dedicated to the mission of preservation of both structure and function.
48:25 - 48:35 As in the past, we are here to support and we believe that input at the inception of this welcome step forward to address specific goals may help guide to a preferred outcome.
48:35 - 48:43 We continue to offer, as suggested by Committee Co-Chair Angela Deering, our foundation as oversight and assistance with this project.
48:43 - 48:49 The Foundation for the Preservation of the Greene County Courthouse and its functions includes the following community leaders.
48:49 - 49:06 Myself as Chairman, Carol Greco as Secretary, Bobby Voles as Treasurer, Attorney Jay Boswell, Historical Society Chair Judy Hodnett, Judge Laverne Ogletree, Judge Russell Wall, Attorney David Cop, Francis Strickland, Mimi Vickers, and the Federalists, and the
49:06 - 49:11 Court Clerk Deborah Jackson, Bill Posey, Jim Sweeney, and Lee Rhodes.
49:11 - 49:21 On behalf of the Foundation, I want to express our appreciation for the opportunity, whenever possible, to assist with the analysis to be conducted by Lord
49:22 - 49:28 Lord Aeck Sargent regarding courthouse functions and space utilization.
49:30 - 49:42 Given the extensive institutional knowledge and historical perspective held by many of our Foundation members, we know the Foundation can provide valuable insight, oversight, and support throughout their analysis.
49:43 - 49:56 As the Commissioners are aware, the Foundation members also served as key participants on the Committee for the Reallocation of Space chaired by Commissioners Deering and Lindsey, and we remain committed to continuing that collaborative effort.
49:56 - 50:11 We would also like to extend our sincere appreciation to County Manager David Crawley for his willingness to share his ideas and for being open to hearing the Foundation's input regarding opportunities to improve courthouse operations and functionality.
50:11 - 50:22 Our historic car house remains a cherished symbol of pride for Greene County residents and an important asset recognized by architectural and historical preservation advocates alike.
50:22 - 50:35 The foundation stands ready to support efforts that will enhance the building's functionality while preserving its historic integrity and ensuring its continued service to the citizens of Greene County for many years to come.
50:36 - 50:46 Please consider the Foundation and all our members as willing and available partners in this important undertaking, and do not hesitate to call upon us for any assistance.
50:46 - 50:48 Thank you. Thank you, Terry.
50:51 - 50:53 Ms. Francis Strickland.
50:58 - 51:05 Good evening all. I'm here as a lifelong Greensboro resident and a member of the Foundation.
51:05 - 51:18 Angela, Jeffery, David, Dee, Mark, I wanna thank all of you for your interest in the courthouse and support of the courthouse.
51:18 - 51:26 It's greatly appreciated. And Angela and D, thank you for getting the committee up and running.
51:26 - 51:30 I think um this is a great step forward.
51:30 - 51:48 I think we need the input of some professionals um who are working with historic buildings and courthouses and I think it will be well worth the money spent and it might save you money in the long run.
51:48 - 51:53 And I just think about the people of Floyd County and Rome and how
51:54 - 51:59 devastated they are at the loss of their courthouse and
52:01 - 52:09 thank you so much for all of you doing to keep our courthouse in pristine condition.
52:10 - 52:12 Thank you. Thank you. Thank you.
52:16 - 52:40 So I'll entertain a motion at this time. I make a motion to authorize the county manager to engage Lord Aeck Sargent for an assessment of the historic court courthouse with funding provided from General Administration Professional Services with the stipulation that Commissioner Blanton and I will uh be liaison commissioners for the project.
52:40 - 52:49 And uh we'll be involved in the meetings. And for anyone, the reason that D is not going to do it is because of his travel schedule right now.
52:49 - 52:55 And so Mark um graciously um said that he would he would join with me on this.
52:56 - 52:59 I'm very close to it, so I can get too quick.
53:00 - 53:01 I got that long motion.
53:04 - 53:06 Got a second. All in favor?
53:06 - 53:08 Raise your right hand.
53:09 - 53:10 Four. Oh.
53:26 - 53:27 Let's see.
53:29 - 53:33 I'll get there. I'm missing one. Missing. I'm sorry.
53:33 - 53:38 Consideration to approve professional services for TSPLOST
53:38 - 53:43 Project planning with Goodwyn Mills Cawood LLC?
53:43 - 53:44 Yes, sir.
53:44 - 53:51 The county is quickly approaching the collection limit for the current transportation special purpose local option sales tax.
53:51 - 53:58 Uh the continuation of the sales tax collection would require voter approval as early as November of this year.
53:58 - 54:04 In preparation, uh the objective will be to determine a list of projects that
54:04 - 54:08 uh represent transportation capacity and safety needs for the county.
54:08 - 54:14 This process would also include the cities, which would better define project needs and scopes.
54:14 - 54:23 Estimated total project cost to include engineering and construction would allow more accurate planning and project programming.
54:26 - 54:32 I'll entertain a motion to approve this professional services.
54:33 - 54:49 I make a motion to I make a motion to authorize the county manager to engage Goodwyn Mills Cawood um LLC for TSPLOST project planning for funding provided from transportation sales tax.
54:49 - 54:52 I have a motion. I have a second. Second.
54:52 - 54:55 I have a second. Any discussion?
54:56 - 54:59 If none, if okay. Show of hands.
55:11 - 55:24 Consideration of a resolution twenty twenty twenty six point four point one four B for the allocation of SPLOST funding associated with construction services for station four of Woodville.
55:25 - 55:33 Special purpose loc local option sales tax funds are available for the completion of station four, uh Woodville Fire Department.
55:34 - 55:42 Uh staff has reviewed and received quotes for the completion of construction to facilitate station operations.
55:45 - 55:47 I'll then attain a motion.
55:47 - 55:52 I'll make a motion to approve the resolution twenty twenty six.
55:52 - 56:01 Period four, period fourteen. B approving the SPLOST project and a waive the reading of the resolution.
56:01 - 56:03 I have a motion to have a second.
56:03 - 56:04 Second.
56:04 - 56:05 Two seconds.
56:06 - 56:08 Uh any discussion.
56:10 - 56:17 Uh only thing I'd like to say is that this is uh showing that we can do improvements to the
56:18 - 56:23 Volunteer fire departments coming under the county pr uh umbrella.
56:26 - 56:31 Uh any further discussion? Not like a show of hands.
56:32 - 56:33 Uh oh
56:36 - 56:42 Consideration of reappointment to the Planning and Zoning Board District 4.
56:42 - 56:51 Mr. Jim Elliott was appointed in September of last year to fill the unexpired term of Mr. Jim Lynch representing Commission District 4.
56:52 - 56:57 Um said term expires April 22nd, uh 2026.
57:00 - 57:07 Uh I then obtain a motion. I make a motion to reappoint Mr. Jim Elliott to the Greene County.
57:07 - 57:19 Planning zoning board as District 4 representative to serve a three-year term ending April 22nd, 2029.
57:20 - 57:22 I have a motion. I have a second. Second.
57:22 - 57:27 Second. Any discussion? Not I'd like to show of hands, please.
57:31 - 57:42 And last thing on the agenda, consideration of a contract for taxiway safety improvements and apron rehabilitation at the airport.
57:43 - 57:49 So the Board of Commissioners approved our DOT agreement back in November of last year for this project.
57:50 - 57:59 Bids have been uh received and reviewed regarding the Taxiway Safety Improvements and Apr Apron Rehabilitation project at the airbor airport.
58:00 - 58:11 Pittman Construction is the lowest responsive uh in responsible bidder um at a project cost of two million five hundred and two thousand eight hundred and twenty-nine dollars and forty cent.
58:12 - 58:14 Uh the county is required um
58:15 - 58:24 To fund two and two and a half percent of the project cost, which is estimated at sixty-two thousand um five hundred and seventy dollars and seventy-four cent.
58:27 - 58:41 I would entertain a motion. I make a motion to approve a contract for taxiway safety improvements and apron rehabilitation at the airport with Pittman Construction and to fund the county's local match using TSPLOST funds.
58:41 - 58:44 I have a motion and have a second. Second.
58:46 - 58:47 Any discussion?
58:49 - 58:56 Those are the kind of projects I'd like for us to do. Spend two and a half million, we only have to put in sixty-two thousand.
58:57 - 59:02 It's always good money. That's right. Uh I'd like to have a show of hands.
59:08 - 59:10 Commissioner's report, Angela Derry.
59:11 - 59:24 Um nothing, just um that David and I had a good meeting today about the courthouse and so if some of y'all want to chat after, let's do that and I'll kind of fill you in, but I think we're headed in a really good direction.
59:25 - 59:27 Commissioner Lindsey? Nothing.
59:28 - 59:30 I'm looking forward to the courthouse.
59:30 - 59:32 Yeah. Renovation, sir.
59:34 - 59:35 Anything else?
59:36 - 59:39 If not, the meeting is adjourned.