00:00 - 00:08 Followed by the invocation tonight, which will be given by Reverend Ricky Cosby, Associate Pastor of the New Springfield Baptist Church in Siloam.
00:12 - 00:25 I pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all.
00:26 - 00:27 Brother Cosby.
00:32 - 00:33 Let's pray.
00:33 - 00:40 De God, we thank you for this beautiful day that you've given us and certainly in this beautiful community in which we live.
00:40 - 00:49 The Lord we act that whatever is pleasing and acceptable in our sight and our agreements or even disagreements.
00:49 - 00:54 Be certainly pleasing and acceptable in your will and in your way.
00:54 - 00:58 Dear Lord, we do ask all these blessings in your son Jesus' name. We pray.
00:58 - 00:59 Amen.
00:59 - 01:00 Thanks for reference.
01:11 - 01:14 I'd like to go ahead and call the meeting to order.
01:15 - 01:18 You would let the minutes reflect that all commissioners are present.
01:19 - 01:29 At this time, under petitions and communications, uh Blue Cypress Consulting, Comprehensive Plan Update.
01:29 - 01:31 And I believe, yeah.
01:36 - 01:45 Good evening, Chairman, Commissioners. It's a delight to be here tonight to be kicking off your comprehensive plan update process.
01:45 - 01:55 I'm Amanda Hatton. I am the community planning manager at Blue Cypress Consulting and I'm also serving in the consultant project manager role for your comprehensive planning update.
01:55 - 02:00 Um of course we're collaborating collaborating very closely with your county manager, Mr.
02:00 - 02:08 Lombard, um as well as his staff to make sure that we're delivering a comprehensive plan that meets your county's needs and goals and vision for the future.
02:09 - 02:23 So tonight I'm here really to give a very brief presentation about what the comprehensive plan is as a reminder to the community, why it matters, why it's such an important part of setting the stage for where you all want to go as a community.
02:23 - 02:31 And then I'm briefly going to cover the planning update process. And and really the goal of this presentation is to make sure that you all know.
02:32 - 02:40 what to expect in the upcoming months and also that so that your community members understand the importance of the plan and how they can have a voice in it.
02:42 - 02:47 So as a reminder that again this is really for community members what is the comprehensive plan?
02:47 - 02:51 This is your documented vision for future growth and development.
02:51 - 02:58 From a practical standpoint it helps guide and provide a legal basis for rezoning decisions.
02:58 - 02:59 So if someone wants to change from
03:00 - 03:10 uh single family residential to a commercial use this is the plan that helps guide that um and of course those decisions go through your planning and zoning commission and then come up to you for decision.
03:12 - 03:26 It also is a community-based plan. It is not just based on what the data says it really is driven by key stakeholders and the public and what we're hearing our priorities and the vision for the the future in Greene County.
03:27 - 03:42 It does help, it does have a five-year work program on it, which will be utilized to help determine where your staff resources and also your some of your budget goes to support that again that future growth and development vision.
03:43 - 03:47 And the last thing I want to note that it is a requirement for the state of Georgia.
03:47 - 03:57 So every county and municipality in the state has to have a comprehensive plan to maintain qualified local government status and be eligible for certain state.
03:58 - 04:05 grants and loans and other programs that the state may be putting on or that your regional commission um may decide to implement.
04:05 - 04:23 And probably a a final note worth mentioning is that this is really also demonstrates the commitment of of you all of your community of where you want to go in the future and to that end provides an important full tool for private investment in the community that this community has their act together, this is where they're going, I want to be a part of that.
04:25 - 04:35 So in coordination again with Mr. Lombard and your other staff, and we we know that there are specific goals that you all want to achieve with this plan update.
04:35 - 04:47 A big part of that really is providing a more refined vision for future growth and development through a concise statement of what that is, but also a more refined future lanes plan.
04:47 - 04:50 So making sure that we have thought through every area of the county.
04:51 - 04:58 the unincorporated county and have the right policy in place and the right direction in place again to re to guide those rezoning decisions.
04:59 - 05:06 And if there are specific actions or initiatives or investments that need to be made that we are laying that out in a five-year work program.
05:07 - 05:21 Another key aspect is we understand that you have some very important zoning updates that need to be made and so we'll be making sure that what's in the plan provides that guidance you need to make those zoning updates coming out of the plan update process.
05:22 - 05:27 And of course we already spoke to meeting the state requirement for a five-year update.
05:28 - 05:33 I do want to reiterate that this is a very collaborative, it's both an iterative process and a collaborative process.
05:33 - 05:37 You're seeing on the screen all the different people that have a voice in the plan.
05:38 - 05:48 Of course we have from a practical standpoint the project management team which is led again by the county in coordination with our consulting team in addition to Blue Cypress.
05:48 - 06:05 We also have Ross and Associates on our team who is looking at forecasts and projections to make sure we have a good solid understanding of where we anticipate the county growing and by how much and then okay where does that growth go from jobs to housing to other uses that you might need like parks.
06:06 - 06:17 uh and trails and things of that nature. And then we also have Hatley Plans who's providing strategic guidance on land use policy and also expertise in zoning.
06:17 - 06:28 I do want to a important part of this process is going to be the steering committee which will be keeping us on track, making sure we're incorporating what we're hearing and that we're getting your plan to where you want it to be at the end of the process.
06:29 - 06:55 Lastly, you've got the Department of Community Affairs, the Northeast Georgia Regional Commission, and all your neighboring jurisdictions, including all the municipalities in Greene County, who will review the plan when we have it drafted and make sure it's meeting state goals for planning, regional goals, and that there aren't any conflicts with your neighbors, so that we're moving forward as a state in general in a very sustainable and sound
06:55 - 06:56 way that aligns.
06:57 - 07:00 with state goals, regional goals, and local goals.
07:01 - 07:08 I want to point out, I know this is a little hard to see if you're sitting out there, but there are five key phases in the planning process.
07:09 - 07:14 Right now we are at pro initiating the project and also existing conditions and trends analysis.
07:14 - 07:26 We're about to wrap up project initiation with this kickoff meeting and then we'll be finishing up a review of everything from current land use conditions
07:27 - 07:34 to your environmental conditions, to um trends and development, a a full package report over the next month.
07:35 - 07:40 And then in the fall, beginning in November, we'll be moving into vision A, and that's where we're really going out into the public.
07:42 - 08:03 meeting with the steering committee in advance of that to make sure that we have a good solid understanding of where you all want to go as a community and then we will finish up with um again developing a concrete implementation program that makes sense, is practical, is implementable, that aligns and moves that vision forward and then we'll document and get it out for all that review process that I was talking about.
08:03 - 08:07 So this is a timeline showing that process. Again we kicked off um
08:08 - 08:12 Informally kicked off as a project team in early August. This is official public kickoff.
08:13 - 08:18 We will be doing the visioning on the back end of this year of 2022.
08:18 - 08:27 And then in early 2023, that's when we're talking about okay, how do we make sure this we're getting it into an implementation framework?
08:27 - 08:36 And so we'll have the vision building to start thinking about what are the tools to implement the plan from a policy standpoint and an action standpoint, and then we'll come back to
08:37 - 08:55 In March to present the draft recommendations, finish up the plan, and then you'll see that there is a public hearing in April, and that's a hearing in advance of transmitting the plan for that regional and state review, and with the goal to have the plan for your consideration for adoption in June.
08:59 - 09:07 Second to last slide here. We do want to make sure that the community understands how we're making sure we're hearing from the different voices of the community.
09:08 - 09:13 We do have key stakeholder involvement. We have a 10-person steering committee.
09:13 - 09:18 We'll be meeting with them for the first time the first week of October.
09:18 - 09:24 They again will be making sure we're on track that we're really getting the plan to where it needs to be.
09:24 - 09:27 We're also kicking off community leader interviews.
09:28 - 09:35 in the next couple weeks. So all of you all are invited because you obviously pres represent different voices in areas of the county.
09:36 - 09:41 And so you all in addition to a series of other folks will be interviewing before we get to the visioning process.
09:42 - 09:47 But from a public standpoint, we did launch um the project website yesterday.
09:47 - 09:51 It's live now if people want to go there, greencompplan.com.
09:52 - 09:56 We intend for it to be an interactive and easy to use website. Any information um
09:57 - 10:01 that uh is appropriate for posting before the plan is drafted will be posted there.
10:01 - 10:11 It'll be a launching pad for um public engagement and uh during the planning process there is a way to sign out for up for an outreach list.
10:11 - 10:22 There's also a comment forum on there. If people have just you know a question or concern about um future land use they can post it there um and we can take that input into account throughout the planning process.
10:22 - 10:23 And so we'll be keeping that up to date
10:24 - 10:31 During the project. Again, our big public outreach is going to be this fall in the visioning phase.
10:31 - 10:36 We have a November 1st visioning workshop planned, and we'll be putting together promotional materials for that.
10:37 - 10:44 It'll be taking place at your administration building. So we'll be getting promotional stuff out about that in a couple of weeks.
10:45 - 10:53 And then we'll also be doing a community survey which will be based online for people that will kind of go in tandem with that visioning workshop.
10:54 - 11:06 Again, we'll come back in March with an open house for people to review draft recommendations before we finalize it, get it into a plan for review, and then up until y'all consider it for adoption.
11:07 - 11:11 And that is really the big picture of everything in
11:12 - 11:14 I don't know what am I at? Seven minutes.
11:14 - 11:17 Here is the project contact information.
11:18 - 11:23 We do have a project email address that's also on the website and people can email general comments there.
11:23 - 11:31 Of course, Byron is the main point of contact with the county. And then of course I'm happy to accept any emails.
11:31 - 11:35 Um contact information is on the website as well. So
11:35 - 11:40 That is a a quick and dirty interview or overview of the planning process.
11:40 - 11:44 I'm happy to answer any questions uh that you all may yeah may have.
11:46 - 11:52 I have a couple questions. Sure. Sure. Uh the meeting that we had to or the Zoom thing that we had to sign up for.
11:52 - 11:53 Mm-hmm.
11:54 - 11:56 What do we need to prepare for that? Right.
11:57 - 12:02 Or is it just to sit there and then you guys kind of surprise us with the questions so that they're off the cuff.
12:03 - 12:06 Yes, you're referring to the leader interviews that I was referencing earlier.
12:07 - 12:13 And we will be sending some questions in advance. Um so we should be sending those a couple of days in advance.
12:13 - 12:18 And I know the interview is um some of them are as early as next week.
12:19 - 12:24 Those will be coming on the back end of this week and that's also um
12:25 - 12:37 when you talk about outlining clear priorities and so on, the the last comp plan and and I'm gonna plead some ignorance here because it's been a long time since I even looked at it.
12:37 - 12:47 It was already done before I became commissioner. And if my memory serves me correct, it was one heck of a uh list of numbers, a lot of numbers
12:47 - 12:50 And uh and kind of a to-do list.
12:51 - 12:57 And uh I don't know who put together what company was sure.
12:58 - 13:02 I I don't think it was you, right? I believe Byron, you want to speak to that?
13:02 - 13:05 Northeast Georgia Regional Commission. Okay.
13:05 - 13:11 It really wasn't formatted to where it would could be useful as a basis for a strategic plan.
13:12 - 13:14 And my question is
13:15 - 13:23 Will this be will the format of this be conducive to use it as a good base for a county strategic plan?
13:25 - 13:35 I I think that partly defines uh depends on how you're defining strategic plan from a high level, you know, we're really focused on future growth and development and the different I understand that.
13:36 - 13:40 But you've got to have certain goals and objectives, you've got to have a strategy.
13:42 - 13:42 Okay.
13:43 - 13:45 And that's what a strategic plan is.
13:46 - 14:02 It lays out a strategy with some goals and objectives and breaks it down by whatever and and uh numbers are useful, to-do lists, priorities are useful and all that, but that's not a strategic plan.
14:02 - 14:08 And that's one of the things that I've always been very interested in is um
14:08 - 14:28 creating a strategic plan for the county and I quit bugging people about it because I knew that this was coming and so as it's formatted I'd like to know that this format would be conducive to where it could be used as a good foundation for a strategic plan.
14:29 - 14:33 Yes, I think so I you know it's you don't have to give me a complete answer now.
14:33 - 14:40 You may want to go with it. And then we'll work closely with Byron, but you know, it's a strategic plan for future land use.
14:40 - 14:46 And so you know, often people are gonna bring up something like education and that's not really what we wanna focus on because
14:47 - 14:52 details on transportation. We're not doing traffic counts. Like we're focused on what are the mixes of land uses.
14:52 - 14:52 So it does get into
14:53 - 14:57 Like the things that you would want in your strategic plan, like economic development and housing.
14:57 - 15:09 Right. And do we have the right mix of these things and green space and what's the county's strategy and and so how does the the land use plan complement a strategic plan?
15:09 - 15:11 Right. And that's the reason why I I'm just
15:12 - 15:13 Just asking.
15:15 - 15:28 Right. So in communities that I've worked where there they've also had a strategic plan and then a a land use plan, the land use plan is going to be a lot more detailed in land use and the strategic plan is going to be higher level and covering topics.
15:28 - 15:30 I understand that. Yep. I've done a lot of 'em.
15:31 - 15:35 So I appreciate that. Sure. And that's what this is very important.
15:36 - 15:40 And the information contained in this would be very important for a strategic plan.
15:41 - 15:44 And that's and that's why I'm I'm asking. Okay.
15:46 - 15:47 Thank you.
15:47 - 15:48 Commissioner Lowe?
15:49 - 15:49 No questions?
15:50 - 15:51 Mr. Smith?
15:51 - 15:54 Mr. Bayer? Okay. Thank you, Amanda. Thank you.
15:55 - 16:04 Thank you. We look forward to working with you all. And if y'all didn't hear, if you want to keep up with the development as as it's going, uh it's greencompplan.com.
16:05 - 16:09 And there's a link on the county website. So you just go to the county's website.
16:09 - 16:12 There's a link. You just click on that link and it takes you straight to this website. Okay.
16:13 - 16:15 Thank you. Thank you.
16:17 - 16:29 If you take a few minutes, or not a few minutes, but a few moments and look over your minutes from the August 2022 regular monthly meeting and the August 19th, 2022 call meeting.
16:29 - 16:31 And then I'd like to entertain a motion, please.
16:39 - 16:48 I make a motion to approve the minutes in the August 22 regular monthly meeting and the August 19th, 2022 call meeting.
16:48 - 16:50 Okay. Thank you. Have a motion and a second.
16:52 - 16:54 Two seconds. Any discussion?
16:56 - 16:59 No discussion. All in favor, let it be known by raising right hand.
17:00 - 17:01 Thank you.
17:04 - 17:08 Before we get down to the our our next portion of the meeting, uh
17:10 - 17:19 I want to make sure the comments we make sure the make sure that the comments that are made are carried out in a orderly and uh dignified manner.
17:20 - 17:28 Uh and I always hate when I have to root read these rules of order, but I feel like it's something we need to do uh before we get started in public comments.
17:29 - 17:34 Input must be made, must be regarding the agenda item under consideration at the time.
17:35 - 17:40 Citizens addressing the board should come in front to state your name.
17:40 - 17:45 Statements and comments will be addressed to the board. It's not a Q<unk>A session.
17:46 - 17:53 Your statement shall be limited to five minutes, and no portion of a person's time may be given to another speaker.
17:54 - 17:57 A person shall not speak more than once.
17:58 - 18:03 A group or association shall designate a spokesperson if they like.
18:04 - 18:09 Any person addressing the board shall not be engaged in a debate of any kind.
18:10 - 18:16 And when I've called for the vote, no further discussion from the audience will be permitted.
18:16 - 18:21 And I'm sure I didn't need to read that, but anyway, just to cover a little house rules.
18:22 - 18:32 Consideration of a preliminary plant request, Oconee Land Development Company, LLC, Richland Pointe, Village, Phase 3.
18:33 - 18:38 The applicant seeks preliminary plant approval for 25 lots to be created from 13.78 acres.
18:38 - 18:41 The property is located in Reynolds, Lake Oconee.
18:42 - 18:47 And is zone PUDMA Platte has been reviewed and complies with the county's code in the Georgia Plat Act.
18:48 - 18:52 We do have a representative from the developer here should the board have any questions.
18:52 - 18:52 Okay.
18:53 - 19:07 Thank you. I'd like to entertain a motion, please. I make a motion to approve the preliminary plat request submitted by Oconee Land Development Company, LLC, for Richland Pointe Village Phase 3, creating 25 lots.
19:08 - 19:12 From 13.78 acres. Okay. Thank you.
19:12 - 19:17 We have a motion and a second. Second. Have a second. Any discussion?
19:20 - 19:23 No discussion. All in favor, let it be known by raise your right hand.
19:24 - 19:24 Thank you.
19:29 - 19:37 Consideration of a preliminary plat request, Oconee Land Development Company, LLC, Jumping Rock, Section 1.
19:37 - 19:44 The applicant seeks preliminary preliminary plat approval for 23 lots to be created from 27.28 acres.
19:44 - 19:48 Property is located in the Reynolds Lake Oconee development and is zone PUD.
19:49 - 19:53 The preliminary plat has been reviewed and complies with the county's code and the Georgia Plat Act.
19:53 - 19:57 Again, there's a representative from the developer here. Should the board have any questions?
19:57 - 19:57 Okay.
19:58 - 19:59 Thank you.
20:01 - 20:12 I make a motion to approve the preliminary plat request submitted by Oconee Land Development Company LLC for Jumping Rock Section 1, creating 23 lots from 27.28 acres.
20:13 - 20:15 Thank you. We have a motion and a second. Second.
20:16 - 20:17 Any discussion?
20:19 - 20:22 No discussion. All in favor, let me know. Raise your right hand.
20:23 - 20:24 Thank you.
20:28 - 20:37 Consideration of a preliminary plat request, Carey Station Road Investors, LLC, The Bluffs at Carey Station.
20:37 - 20:44 The applicant seeks preliminary plat approval for three hundred and forty-four lots to be created from one hundred and thirty-seven point thirteen acres.
20:45 - 20:48 Properties located on Carey Station Road and is zoned PUD.
20:48 - 20:54 The plat has been reviewed and complies with the county's code in the Georgia Plat Act, and again there is a representative of the developer here.
20:54 - 20:56 Should the board have any questions?
20:56 - 21:00 Mr. McAllister, do you want to address the board?
21:18 - 21:27 Good afternoon, Rick McAllister 1341 Beverley Drive, Athens, Georgia, agent for Carey Station Road Investors, LLC.
21:27 - 21:34 Um I just wanted to bring up a little bit of old business. Um it's at the uh July twelfth, two thousand twenty two Board of Commissioners meeting
21:34 - 21:51 This board approved the zoning map amendment request for PUD on this parcel with the condition and I'm gonna quote an executed guaranteed assurance of water and sewer service and capacity for the site to be received by Greene County on or before december thirtieth, twenty twenty two.
21:52 - 22:06 Um such a sir assurance was documented by Piedmont Water to Greene County Building Department via letter letter dated August nineteenth, twenty twenty two, and accepted by the county on August twenty-fourth, twenty twenty two.
22:06 - 22:12 I would just like the acknowledgement of the board this this condition has been met along with the uh the approval or
22:13 - 22:15 consideration of plenary plat.
22:15 - 22:23 Um similar to the conceptual plan on the zoning map we are um plat document single family lots.
22:23 - 22:28 As Byron mentioned there's three hundred and forty four lots. Part of the process is we have to certify two things.
22:29 - 22:33 One the area of the land which is done by the warranty deed
22:33 - 22:40 we included and the sliding scale of the open space. Part of your code has sliding scale of open space required on your density.
22:40 - 22:47 Our overall density is 2.51 units. And that slides it to a 25% open space requirement.
22:47 - 22:53 And I just want to mention to the board we're at a 40% open space requirement with the preliminary plat.
22:53 - 22:57 So those things have been certified and it included in the file.
22:57 - 22:59 I just want to give you just quick cliff notes of that.
23:00 - 23:05 Uh with that I appreciate the your time and let me know if you have any other questions.
23:05 - 23:07 Okay. Thank you.
23:10 - 23:12 Like to entertain a motion, please.
23:17 - 23:30 I'll make a motion to approve the preliminary flat request submitted by Carey Station Road Investors LLC for The Bluffs at Carey Station creating 344 lots for 137.138.
23:31 - 23:35 Okay. We have a motion. Need a second. Second. All right.
23:35 - 23:36 Any discussion?
23:40 - 23:43 No discussion. All in favor, let me know. Raise your right hand.
23:44 - 23:45 Thank you.
23:51 - 24:00 Consideration of a preliminary plant request, Red Clay Development Group, LLC, Airabella at Lake Oconee, phase one.
24:01 - 24:09 The applicant seeks preliminary plat approval for 72 townhome tracks and one commercial outlaw from nineteen point zero eight total acres.
24:10 - 24:16 The parcel is on CPUD and is located in the area of the Linger Longer Road intersection with State Rome State Route 44.
24:17 - 24:21 Billinary Platte has been reviewed and complies with the county's code and the Georgia Plat Act.
24:21 - 24:25 We do have a representative from the developer signed up to speak.
24:25 - 24:29 Mr. McAllister, you're gonna get your steps in this afternoon.
24:34 - 24:35 Appreciate that.
24:36 - 24:38 I think I close the circle on this one.
24:39 - 24:46 Okay, again Rick McAllister, 13141 Beverly Drive, Athens, Georgia, agent for Red Clay Development Group LLC.
24:47 - 24:52 The application brought forth you today is for the first phase of Airabella Lake Oconee Preliminary Platte.
24:52 - 24:59 While this is just the initial phase of the project, a couple of my discussion points will touch on the overall plan.
24:59 - 25:07 First, for Greene County Zoning Code Section 91823, upon some of plummary plat, we have to have a certification.
25:07 - 25:12 Similar to the PUD, we've got to do this in CPUD. A little bit different here.
25:12 - 25:22 The certification designates the total acres of CPUD and the amount of total use complying with 9182.1 and section 918.2.2 of the code.
25:23 - 25:30 So what I'm trying to say is even though we're just doing this the very first phase, we've got to tell you what everything's going to generally be if it meets the code.
25:30 - 25:37 That's part of the certification. The document is in the package, so I just want to give you the Cliff Notes version.
25:37 - 25:42 The overall acreage is 137.01 acres.
25:42 - 25:52 The proposed residential use of the overall plan is 102.75 acres, which equals twenty-five percent of the total land use.
25:52 - 25:54 And the minimum required is 25%.
25:55 - 26:06 The non-residential use, the minimum required is 25%, and we are planning on using 34.27 acres, which equals the 25% of the total unit.
26:07 - 26:12 Please note that this certification is based on the plenary, the first plenary plant we've done here.
26:12 - 26:20 We will have future certifications as more plants, plants become available, and we will update those as necessary.
26:21 - 26:30 Um, so included in our project plat is a conceptual overall site determination which meets the requirements of the total use requirement in the certification.
26:31 - 26:38 Um a little bit of detail about the polymeray plat. As Byron mentioned, it's an area of 19.08 acres.
26:39 - 26:51 The breakdown of this initial phase is 9.83 acres of residential right-of-way, 7.9 acres of townhomes, and there's one commercial outlaw of 1.32 acres.
26:51 - 26:53 I mentioned these calculations.
26:53 - 26:57 to document additional dimensional requirement of CPUD zoning.
26:58 - 27:03 Land devoted to residential use as defined by code shall not exceed ten units per acre.
27:04 - 27:11 The preliminary plat before you now documents seventy two townhomes within nineteen point zero eight acres.
27:11 - 27:18 If you subtract out the one point three two acre commercial tract, we are at a net density of four point
27:19 - 27:23 Four or eight units per resonance of use, and we need to be underneath 10.
27:23 - 27:27 So that's kind of where we are in this phase in that dimensional requirement.
27:28 - 27:37 Within the resonance component of the initial phase, by approximately 28% of the area we bec will contribute to the overall open space requirement.
27:38 - 27:41 The overall open space requirement for CPUD is 20%.
27:42 - 27:48 So basically what we're saying is in this phase right here we're at 28%, so we're kind of ahead of the curve.
27:49 - 27:53 Um now I got rid of the math, so let's move on a little bit more.
27:54 - 27:57 So all of the five roads named have included have been approved for the county.
27:57 - 28:04 All streets and wide right of ways will be private. The townhouse development will be gated access off the main boulevard.
28:04 - 28:12 Although we are only presenting the initial phase of the preliminary plat development today, I do want to touch on the overall density of the project.
28:13 - 28:21 Currently per zoning code, the total number of residences shall not exceed four dwelling units per acre in the residential portion of the CPUD.
28:21 - 28:27 And the land devoted to residence to use as defined in the code shall not exceed ten units per acre of land.
28:27 - 28:33 The proposed residential portion of Airabella right now is 102.75 acres.
28:33 - 28:40 If you multiply that by four, that equals 411 total acres, is what we're looking at from an overall plan perspective.
28:41 - 28:42 That's within the code.
28:42 - 28:45 That is in the Greene County Ordinance.
28:45 - 28:53 Um there have been three PUDs in Greene County. Um I've been lucky enough to be involved with all three of them at now.
28:53 - 28:58 Um the first two are some stage of development since the early 2000s.
28:58 - 29:03 This project, other than the DOT curb cut, is really in its emphasis.
29:03 - 29:07 I'm not here to say I'm a CPU expert, but I just want to tell you that each
29:08 - 29:11 CPUD faces its own development challenges.
29:12 - 29:16 This one in particular is much closer to existing developments.
29:16 - 29:22 We've got Reynolds on one side, we've got Lake Oconee Village on the other, everything across 44.
29:22 - 29:28 There's a lot of things already happen around it. In reality, you know, this project can be seen for every direction.
29:28 - 29:30 You're going to be circling around it.
29:30 - 29:33 It's relatively smaller CPUD and
29:33 - 29:37 than most others, but it still meets the you know minimum size requirement.
29:37 - 29:44 But probably the most challenging element element is the location. We're sitting here at the doorstep of one of the South's premier developments.
29:45 - 29:55 That's a big challenge for the design team. The site is on CPUD and the intent is to develop a mixed use project with within the guidelines of Greene County Code.
29:56 - 29:59 Will someone see a backyard or rooftop? Yes.
29:59 - 30:02 Will the density meet the allowable quantity by co?
30:02 - 30:08 Yes. Will there be a mix of single family and multifamily re multifamily residential types?
30:08 - 30:12 Yes. Will the commercial uses be adhered to allowable land use and seafood?
30:12 - 30:13 Yes.
30:14 - 30:20 I've been a member of the design team just for a very short while. I just got involved with this about 45 days ago.
30:20 - 30:22 Initially I took on this phase of the project because
30:23 - 30:27 Uh a lot of respect to Dr. Bob Cowles and what he's already done for this community.
30:27 - 30:35 I did speak with Byron to you know get an idea of where this project was head headed and I assured him that we would get this in to the county guidelines.
30:36 - 30:45 Um this past month I've kind of gained a better understanding of who Red Clay Development Group LLC is and the dedication they are willing to give to this project.
30:45 - 30:54 This group has the desire, the intention, and the fortitude to do what it takes to make this development what it should be.
30:54 - 30:55 An exciting place to be.
30:56 - 31:00 Expand on the lake lifestyle experience and shine in this community.
31:00 - 31:06 With the information we've given you in this presentation, we would appreciate a approval on the preliminary platform.
31:06 - 31:08 Hope I got that in five minutes.
31:09 - 31:10 Thanks. Thank you.
31:18 - 31:22 I'd like to entertain a motion, please. Is there any other speakers signed up?
31:22 - 31:23 No. No.
31:25 - 31:28 Okay. Like to entertain a motion, please.
31:28 - 31:45 I make a motion to approve the preliminary plant request submitted by Red Clay Development Group LLC for Airabella, Lake Oconee, Phase 1, creating 72 townhome tracks, one commercial outlaw from nineteen point zero eight acres.
31:46 - 31:49 Okay. Thank you. Have a motion need a second. Second.
31:50 - 31:52 Have a second in discussion? Yes.
31:53 - 31:58 Um I don't know how many people here are here.
31:59 - 32:03 To hear about the Airabella development.
32:03 - 32:24 But in the last month, month and a half, I don't know how many dozens and dozens and dozens and dozens of phone calls, people stopping me in the store on the golf course, uh wanting to know about this,
32:24 - 32:28 object uh presenting objections, curiosity questions.
32:29 - 32:29 etc.
32:30 - 32:37 Um we also met with several groups, Reynolds Groups, Landing,
32:39 - 32:54 and a few others. I can tell you that uh a lot of the objections that were raised when we met with these people, especially the groups, uh, they felt a lot better about
32:55 - 33:03 They felt a lot better that the county was going to work hand in hand with the developer
33:04 - 33:08 to make sure that all the code requirements were met.
33:09 - 33:15 And as you heard from Rick, there that intention is there.
33:17 - 33:20 But there was a lot of people that uh
33:23 - 33:24 We're upset about this.
33:26 - 33:33 Uh so that's why I feel responsible and I think it's fair that I should express some of these things to everybody that's in the room.
33:36 - 33:45 The uh challenging location thing and the backyard rooftop comments that Rick just made.
33:46 - 33:55 Uh uh Byron and I were with a uh group in Reynolds that were from the uh
33:56 - 34:03 uh Holtz Ferry section, Montgomery Place.
34:03 - 34:11 I've had a couple people from Holtz Ferry who all of these areas are gonna be impacted in some way, shape, or form.
34:12 - 34:16 And after the discussions they felt a lot better of it uh about the whole thing.
34:17 - 34:29 But at the same time, there was one outstanding request, and it comes to Rick's uh point about backyard rooftops.
34:31 - 34:39 Uh I think Reynolds and the developer should work together to create some kind of a buffer.
34:40 - 34:43 Okay, especially a visual buffer.
34:45 - 34:50 Um particularly as you get into the other phases where there's commercial properties.
34:52 - 34:52 Okay?
34:53 - 35:11 Now we can't sit here and demand that you do this, but I think for the peace of the community and the coming together of the community, both the developer and Reynolds needs to work closely in some way, shape, or form to make sure that there is a buffer.
35:12 - 35:16 that works and especially visually.
35:16 - 35:28 And also there was the concern about people coming over from the commercial thing and walking into the Reynolds community and what potential problems that could create.
35:28 - 35:31 And in this day and age, I can tell you
35:32 - 35:36 We can come up with a long list. But I don't want to beat a dead horse.
35:36 - 35:40 All I'm suggesting is is that the two sides get together
35:42 - 35:43 and work this out.
35:45 - 35:50 And I know there's people here from Reynolds and from the other communities and I see they're shaking their heads.
35:50 - 35:55 So I just want to go on record that y'all get together and work it out.
35:57 - 35:58 That's it. Okay.
35:59 - 36:07 Any further discussion? Yeah, Rick, on this initial phase, will the entrance come off of 44?
36:14 - 36:20 And the initial phase of the entrance will be off of 44 and um Linger Longer.
36:20 - 36:24 So it's the gonna be actually it's gonna be the the thoroughfare road's gonna be installed.
36:24 - 36:30 So it'll go from the existing curb cut on Highway Forty Four all the way to Linger Longer Road.
36:30 - 36:36 So those two connections we made initially. And you said the roads are gonna be private.
36:36 - 36:47 So if you got commercial development, you're talking about whether condominiums and residential will it be where people can drive all the way back in there?
36:47 - 37:01 Uh yes sir. That'll be you'll see in future phases that it's it's a you know it's not only a walkable community but also a multi-trail community and there'll also be the the proper vehicle access as necessary through the community.
37:02 - 37:02 Thank you.
37:03 - 37:11 Right, while you're up there. I also uh appreciate your comment about uh working with the county, uh particularly on the density stuff.
37:12 - 37:19 Uh, 'cause that was another one of the issues that was raised by several of the groups was the density.
37:19 - 37:28 And what put their mind at ease was the fact that this is going to be applied for or developed phase by phase by phase, kinda like what Reynolds does.
37:29 - 37:35 And that the total picture and the rules would be met as we
37:36 - 37:39 Go along on this. So that made them feel a lot better.
37:39 - 37:41 So I so much as general.
37:43 - 37:45 Thanks. Any other questions?
37:45 - 37:50 Okay. We have a motion. We have a second. Uh any further discussion?
37:51 - 37:55 All right. No discussion. All in favor, let it be known by raise your right hand.
37:55 - 37:57 All right. Thank you.
38:00 - 38:10 Consideration of a hangar lease assignment. Eagle Air Services of North Carolina LLC is selling their ground lease and hangar to Shelley and Stephen Chang.
38:11 - 38:17 Transfer of these ground lease agreements requires approval by the landlord, which is the county, thus requiring a board vote.
38:18 - 38:18 Okay.
38:20 - 38:24 And this is the second one of these we've done, correct? Mm-hmm. Okay. All right.
38:24 - 38:36 Uh like to entertain a motion, please. I'll make a motion to approve the assignment of the hangar ground lease held by Eagle Air Services of North Carolina LLC to Shelley and Stephen Shane.
38:36 - 38:41 Okay. Thank you. We have a motion. Need a second? Second. Have a second. Any discussion?
38:43 - 38:46 No discussion. All in favor that you know, raise your right hand.
38:47 - 38:48 Thank you.
38:52 - 38:56 Consideration of a resolution adopting fire department agreements.
38:56 - 39:04 The board has previously set in place a framework whereby the contracts for the private nonprofit fire departments will be addressed annually with the county's fiscal year.
39:05 - 39:12 These contracts are required to establish the legal mechanism through which count the county can provide these entities with funding through the tax districts.
39:13 - 39:14 Additionally, state rules have
39:15 - 39:23 Also changed that require these contracts to be approved annually. The agreements with the volunteer departments, including Greshamville, Walker Church and Liberty, remain the same as in previous years.
39:23 - 39:27 I did put an example in the packages.
39:28 - 39:28 Okay.
39:29 - 39:32 Like to entertain a motion, please.
39:33 - 39:39 I'll make a motion to approve the resolution number two zero two one dot nine thirteen A
39:40 - 39:46 Adopting agreements for the private, non-profit, fire departments and ways of reading of the resolution.
39:46 - 39:50 Okay. Thank you. We have a motion and a second. Second. Right. Have a second.
39:50 - 39:51 Any discussion?
39:56 - 40:00 So the cities are all the intergovernmental agreements through service delivery.
40:00 - 40:01 Yep.
40:01 - 40:02 Okay.
40:02 - 40:04 Those automatically renew.
40:05 - 40:07 Any further discussion?
40:09 - 40:11 All in favor, let me know. Raise your right hand.
40:12 - 40:12 Okay.
40:13 - 40:14 Thank you.
40:17 - 40:21 Consideration of a resolution amending the Greene County Zoning Code.
40:22 - 40:27 A minor revision to the zoning code is needed to reflect the public policy that is desired for our community.
40:27 - 40:32 The change adjusts the eligible permitted uses allowed under the B-2 zoning.
40:32 - 40:37 The proposed revisions were emailed and also included here in the packages.
40:37 - 40:41 We do have an individual signed up that desires to speak on this item.
40:42 - 40:43 Mr Kennedy.
40:48 - 40:59 How y'all doing? Good, how are you? Good. So uh I guess I'll present this in two parts so to speak, kinda give a backstory, I guess, in in my mind about the parcel, how we got here, and then uh
41:00 - 41:04 you know, my my statement or or my plea to you guys, so to speak.
41:04 - 41:12 Um earlier this year my partner and I bought the parcel, I'm sure you guys are familiar with it, at the corner of the Richland connector in Highway 44.
41:12 - 41:27 I uh I border it's when the high when the Richland connector was uh developed that created a roughly a sixteen acre square um that BMC that I share with BMC um Wrightsville Church Road kinda zigzags around it.
41:28 - 41:31 Um the other side is shared with Raymond Copelan.
41:32 - 41:42 So purchased that earlier this year and went through I guess you guys uh approved the entitlements to go to B2, which included unlimited cell storage.
41:43 - 41:47 Um so uh that is is basically how we got here.
41:48 - 41:54 I guess I'm probably the parcel that that dirt being kicked around on that created the call for us being here today.
41:55 - 42:13 So, um so as somebody who has other, you know, similar land and or development deals in Greene County who I'd like to continue to pursue and not want to you know find myself in this position again um of essentially somewhat having the the rug pulled out from under me.
42:13 - 42:19 Um as I have an unlimited entitlement right now that I've just gone through, you know, the proper channels.
42:19 - 42:27 Again, you guys approved it um for that use and um and now you know it's potentially being pulled back.
42:27 - 42:38 And so of course, you know, my like I said, my partner and I spent hundreds of thousands of dollars, spent, you know, thousands in conceptual plans to get here, and then now we're looking at, you know, maybe this being reversed.
42:38 - 42:44 So I come in front of you guys today not really trying to debate that conditional use or
42:44 - 43:00 you know, whether or not storage should be allowed there or not. It's more so I I I ask as somebody who intends, as I mentioned before, you know, to continue, you know, making moves and doing things in Greene County that, you know, bring things into the county, create jobs, housing options, all that all that good stuff.
43:01 - 43:09 You know, uh I don't wanna, you know, kinda ha happen upon this situation again where, you know, I'm I happen to be a parcel that's in a purgatory here.
43:09 - 43:20 Uh that is affected. So um so again I asked not to debate that use, but more so I asked for you know a grandfathering in status in this.
43:20 - 43:26 Because again, I've I went through all the correct channels to get this this year, bought this piece this year, went through all the channels this year.
43:26 - 43:32 You guys approved it just a few months ago. So that's what I asked is uh is some consideration in grandfathering this parcel in.
43:33 - 43:41 I don't think this creates a huge precedence elsewhere in the county, as you know, I'm one of probably two or three B2 parcels that are undeveloped that this would even be a factor.
43:43 - 43:45 So that's really all I got.
43:46 - 43:48 Okay. Thank you, sir. I have a question though. Yes.
43:50 - 43:55 The conceptual drawing though that you gave was not did not have storage on it.
43:55 - 43:59 Uh that's correct. But it was listed with red writing all over it that said conceptual.
43:59 - 44:04 That was a starting point for us to, you know, move through uh planning and zoning as well as you guys.
44:04 - 44:12 But but again, the the unrestricted entitlement that I have right now is B two that includes um cell storage.
44:12 - 44:21 So so we we had discussed everything and everybody was well aware, Chuck was well aware that that was a conceptual plant and was very early on.
44:23 - 44:24 Okay. Yeah.
44:25 - 44:25 Okay, thanks.
44:30 - 44:31 Sure.
44:31 - 44:35 So just to take Commissioner Deering's comment a little bit further for the
44:35 - 44:46 benefit of the audience, what the board received was a conceptual plan that showed two fast food restaurants and a convenience door gas station.
44:46 - 44:54 So it's a little disingenuous to represent that the rug was ripped out from under you when what was presented is not what's being discussed today.
44:55 - 45:00 The county can certainly change what our requirements are and that's what this is about.
45:00 - 45:03 And this is protecting the future of the county for all the taxpayers.
45:04 - 45:12 and all the citizens. So just to be clear, there was never any approval given for mini storage on this particular parcel.
45:13 - 45:16 So it was it's been discussed for more than a year.
45:17 - 45:24 And had he come forward, had anybody come forward on that parcel and said we want to put mini storage there, they wouldn't be granted the B2 zoning.
45:24 - 45:35 So this is basically just trying to get ahead and fix something so we don't get uh something there that will be an obstacle or visual barrier for the rest of the future of the county.
45:36 - 45:36 Okay.
45:36 - 45:39 Thank you. I'd like to entertain a motion, please.
45:46 - 45:56 I'll make a motion to adopt resolution number 2022.9.13B amending the zoning code for Greene County, Georgia, and away the reading of the resolution.
45:57 - 45:59 All right. We have a motion, need a second.
45:59 - 46:03 Second. All right. Any further discussion?
46:06 - 46:09 No discussion. All in favor, let me know or raise your right hand.
46:10 - 46:11 Yes. Okay.
46:12 - 46:13 Thank you.
46:15 - 46:20 Consideration of a resolution authorizing SPLOST projects.
46:20 - 46:28 SPLOST SPLOST seven includes funding for improvement projects at most county facilities and for roads and bridges.
46:28 - 46:35 Various staff personnel have compiled improvement projects that are appropriately funded through SPLOST and those expenditures require board approval.
46:35 - 46:39 The resolution is embedded in the package for board consideration.
46:39 - 46:40 Okay.
46:40 - 46:43 Thank you. I'd like to entertain a motion, please.
46:43 - 46:49 I make a motion to approve resolution number 2022.9.13.
46:49 - 46:55 C authorizing projects using SPLOST 7 funding and to waive the reading of the resolution.
46:55 - 46:59 Okay. Thank you. We have a motion and second. Second. Have a second.
46:59 - 47:00 Any discussion?
47:01 - 47:01 Yes.
47:04 - 47:06 So the one with the uh
47:07 - 47:09 shoulders that's already ongoing.
47:09 - 47:12 No, this will be an addition. This is additional.
47:15 - 47:22 And uh well that was my same question on the cross grain covers.
47:23 - 47:28 Yeah. These are all new additional expenditures.
47:33 - 47:35 Okay. Okay. Any further discussion?
47:38 - 47:40 All in favor let me know by raising your right hand.
47:42 - 47:43 Thank you.
47:47 - 47:53 Consideration of an outsourced project to cut brush and limbs along county right-of-ways.
47:53 - 48:00 Due to staffing shortages and equipment failures, the growth of limbs and other brush along the county road right-of-ways has overwhelmed current resources.
48:00 - 48:05 Pricing from a qualified contractor to perform work to cut back the limbs and brush has been obtained.
48:06 - 48:09 Contractor will target the highest traveled roads that are in the greatest needs.
48:09 - 48:12 A contract to cut back about 90 miles.
48:12 - 48:16 Will have to be bid and should total about a hundred and fifty thousand dollars.
48:16 - 48:21 The unused funding and salaries for the road department covers this expense. There are no attachments.
48:21 - 48:24 Okay. Thank you. Like to entertain a motion, please.
48:25 - 48:32 I make a motion to approve a budget adjustment using prior's prior year's fund balance of the general funds.
48:32 - 48:48 To allocate $150,000 in funding to other professional services in the road department budget to accomplish a project to cut back brush and limbs along the heaviest traveled county roads that are in the greatest need.
48:48 - 48:50 Okay. Thank you for that motion. Need a second?
48:51 - 48:51 Second.
48:52 - 48:53 Discussion?
48:55 - 48:55 Not yet.
48:56 - 48:59 Wanted to get the board's approval before we put it out for bid.
48:59 - 49:01 Just in case it says no.
49:02 - 49:04 Any further discussion?
49:05 - 49:08 All in favor, let it be normal. Raise your right hand.
49:15 - 49:18 Consideration of a budget adjustment sheriff's office network.
49:19 - 49:25 Sheriff's Office operates on its own uh network that is separate from the remaining county network.
49:25 - 49:30 The hardware that provides the firewall protection for the sheriff's office failed and had to be replaced.
49:31 - 49:35 The sheriff arranged for the work, including installing a redundant firewall firewall component.
49:36 - 49:40 But the FY 2022 Sheriff's Office budget is not sufficient to cover the expense.
49:41 - 49:49 I included the executed quote that the Sheriff Sheriff's Office signed that sent over here for the board's approval.
49:50 - 49:50 Okay.
49:51 - 49:58 Thank you. I'd like to entertain a motion, please. I make a motion to approve the necessary budget adjustments to allocate funding using prior year's fund.
49:59 - 50:07 balance of the general fund to fund professional services and hardware components necessary to replace the network fire while at the sheriff's office.
50:07 - 50:08 Okay.
50:08 - 50:10 Thank you. We have a motion to second.
50:11 - 50:12 Second. All right.
50:12 - 50:13 Uh any discussion?
50:14 - 50:15 Yeah.
50:17 - 50:18 It could have.
50:19 - 50:21 That's that same question.
50:21 - 50:28 Um it it absolutely could, and if the board wanted to come for SPLOST, you know, the the motion could be adopted accordingly.
50:28 - 50:30 The the SPLOST money that's set aside for
50:31 - 50:37 the jail will and the sheriff's office will absolutely be used in other ways.
50:37 - 50:42 So longer term plans. So if the nickel and diamonds flosh too much, then we need it for the bigger things.
50:42 - 50:44 It's not there.
50:44 - 50:47 All that stuff. But whatever you want to do.
50:49 - 50:49 Thank you, Ryan.
50:52 - 50:54 Any further discussion?
50:55 - 50:58 All in favor, let me know raise your right hand.
50:59 - 51:00 Okay. Thank you.
51:02 - 51:07 Consideration of budget adjustments uh audit pro uh purposes.
51:07 - 51:13 Budget adjustments are identified each year in preparation for the annual audit and usually during the course of the annual audit.
51:13 - 51:22 These adjustments are identified by the finance office. Uh they range from simple recognition of grant proceeds received with related expenses to adjustments needed for accruals.
51:22 - 51:26 Made during the audit process for items such as payroll and payroll related items.
51:26 - 51:37 The adjustments are necessary to comply with state audit requirements each year. The detailed budget adjustment forms are in the packages, and just be aware there will certainly be more next month.
51:37 - 51:41 Okay, thank you. Like to entertain a motion, please.
51:45 - 51:53 I make a motion to approve the necessary budget adjustments for the 2022 fiscal year as detailed on the submitted budget.
51:54 - 51:56 Amendment forms. Okay.
51:57 - 51:58 Thank you for the motion. Need a second.
52:00 - 52:02 Have a second. Any discussion?
52:04 - 52:07 No discussion. All in favor, let it be known by raising right hand.
52:08 - 52:09 Thank you.
52:11 - 52:15 No executive session tonight. Commissioner reports. Commissioner Deering.
52:15 - 52:22 Um all the um shoulder work on the roads has that's been done in District 1 looks really good.
52:23 - 52:25 So much appreciated. Good.
52:26 - 52:27 Anything else?
52:29 - 52:37 Okay. Commissioner Smith? Nothing. If you don't like the little boulders and fall out of it, just hit them and they'll crust down.
52:37 - 52:39 I got a few calls about those.
52:40 - 52:42 It's not gonna be silk like the other road, right?
52:44 - 52:48 Uh Commissioner Lindsey? I've got nothing right now. Commissioner Filice?
52:49 - 52:51 I've said enough today. You did good.
52:53 - 52:56 And I have nothing, and with that, this meeting is adjourned. Thank you for coming.